Claim Missing Document
Check
Articles

Found 4 Documents
Search

FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PENYELESAIAN PEMBANGUNAN PROYEK SUNCITY RESIDENCE Rizka Wulandari; Enes Ariyanto Sandi; Yuni Ulfiyati
Jurnal Riset Teknik Sipil dan Sains Vol. 1 No. 2 (2023): Februari 2023 - Jurnal Riset Teknik Sipil dan Sains
Publisher : Politeknik Negeri Banyuwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57203/jriteks.v1i2.2023.60-64

Abstract

Pekerjaan konstruksi seringkali terjadi masalah operasional sehingga hal tersebut menyebabkan pekerjaan konstruksi mengalami keterlambatan. Masalah operasional itu sendiri adalah kurangnya tenaga kerja, bahan material, dan peralatan yang akan digunakan, alokasi yang tidak sesuai dengan rencana, dan masalah lainnya di luar jadwal rencana kerja. Penelitian ini bertujuan untuk mengetahui faktor apa saja yang menyebabkan keterlambatan penyelesaian pembangunan Suncity Residence. Metode pengambilan data dilakukan dengan menggunakan kuesioner yang disebar kepada kontraktor yang terlibat dalam proyek tersebut. Pemilihan responden menggunakan metode sampling kuota yang meliputi 30 responden yang mengerjakan proyek pembangunan Suncity Residence. Selanjutnya data hasil kuesioner diolah menggunakan analisis factor dengan software SPSS. Hasil analisis data yang diperoleh terdapat dua faktor yang menyebabkan terjadinya keterlambatan penyelesaian proyek Suncity Residence Apartment yang dilihat dari nilai persentase variannya. Variabel tersebut adalah pekerjaan yang tidak tepat yang dilakukan oleh kontraktor, kesalahan pengolahan material oleh kontraktor, kekurangan bahan dan material masuk ke dalam faktor satu yang memiliki nilai varian sebesar 45,107%. Dan kesalahan dalam perencanaan dan spesifikasi, perubahan scope perkerjaan konsultan dan terdapat perubahan tipe dan spesifikasi material masuk ke dalam faktor dua yang memiliki nilai varian sebesar 23,423%.  Dilihat dari nilai persentase terbesar, maka faktor satu memiliki nilai varian terbesar yaiu 45,107% dengan 3 faktor didalamnya.
DESAIN PETA SITUASI JALAN DENGAN METODE POLIGON TERBUKA (STUDI KASUS JALAN LINGKUNGAN POLITEKNIK NEGERI BANYUWANGI) Hidayatur Rohman; Enes Ariyanto Sandi; Wahyu Naris Wari
Jurnal Riset Teknik Sipil dan Sains Vol. 2 No. 1 (2023): Agustus 2023 - Jurnal Riset Teknik Sipil dan Sains
Publisher : Politeknik Negeri Banyuwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57203/jriteks.v2i1.2023.40-47

Abstract

Peta Situasi dalam perkembangannya sering digunakan sebagai gambar pelengkap dokumen pembangunan proyek. Diperlukan suatu penyajian peta yang menarik  dan mudah dipahami dengan pendetailan setiap objek. Jalan lingkungan Politeknik Negeri Banyuwangi memiliki panjang 772,3 meter. Jalan ini merupakan jalan akses civitas akademika untuk menuju gedung perkuliahan. Jalan yang dibangun pada tahun 2009 tersebut belum memiliki peta situasi, dimana peta ini sangat penting untuk perencanaan perbaikan jalan. Berdasarkan kondisi tersebut maka diperlukan desain peta situasi untuk jalan lingkungan Politeknik Negeri Banyuwangi, karena belum ada gambar perencanaan sebelumya. Tujuan dari proyek akhir ini untuk mengetahui cara pembuatan peta situasi dengan metode poligon terbuka menggunakan alat Waterpass. Desain peta situasi jalan yang didapatkan akan dijadikan acuan pembangunan jalan atau sarana prasarana penunjang jalan lainnya. Metode yang dilakukan yaitu survei langsung ke lokasi dengan bantuan alat Waterpass. Data kontur  yang dihasilkan diolah kembali dan dijadikan gambar site plan dan profil jalan dengan bantuan software AutoCad, SkecthUp,dan Lumion. Hasil penelitian ini diperoleh desain gambar site plan, profil jalan, tampak existing tiga dimensi  maupun data yang dihasilkan dari survei pemetaan lahan dari alat Waterpass dan koreksi-koreksi perhitungan untuk titik penembakan.
Rancang Bangun Absensi Mahasiswa Berbasis Fingerprint Menggunakan Komunikasi Wireless Mohamad Dimyati Ayatullah; Enes Ariyanto Sandi; Galih Hendra Wibowo
Jurnal Informatika: Jurnal Pengembangan IT Vol 4, No 2 (2019): JPIT, Mei 2019
Publisher : Politeknik Harapan Bersama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30591/jpit.v4i2.1123

Abstract

The teaching and learning process on campus is always supervised by paying attention to attendance. Some campuses use this attendance as a condition for taking the exam. However, the attendance system is still manual, which is by using a signature on the attendance sheet. This system has several weaknesses which include the occurrence of fraudulent attendance, difficulty in monitoring attendance, and data that cannot be presented quickly. The study proposes an attendance system using fingerprints connected to wireless networks that are already available on campus. Wireless networks are used as a medium of communication between attendance tools and database servers. The use of wireless networks aims to facilitate equipment used in classrooms during the lecture process. Attendance tool designed on a single Raspberry Pi computer board that is equipped with fingerprint sensors, power banks and LCD screens. While wireless LAN devices are integrated in the Raspberry Pi boar. The attendance system begins with an enroll process to save the lecturer and student fingerprint templates. Each template is given an ID to be stored on the database server using TCP wireless and protocol networks. The enroll process observations require an average time of 4 seconds which consists of: transmission time and time identification of fingerprint characteristics to the creation of fingerprint templates. The attendance process in lecture activities begins with the absence of lecturers and is followed by students. The average time needed to do attendance is 4 seconds. During the data attendance process can transmit between the attendance device (client) and server. Through a fingerprint-based attendance device based on the available wireless network infrastructure in the campus, it can improve the efficiency of attendance monitoring in real time.
Variasi Sistem Pembayaran Terhadap Cash Flow (Studi Kasus : Pembangunan Laboratorium Terpadu AKN Blitar) Aida Ayu Safitri; I Ketut Hendra Wiryasuta; Enes Ariyanto Sandi
Jurnal Teknik Sipil Giratory UPGRIS Vol 5, No 1: Juni 2024
Publisher : Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/giratory.v1i1.19454

Abstract

Construction projects are a form of long-term investment that requires large capital. One important aspect in construction projects is the payment system. Therefore, it is necessary to vary the payment system on the cash flow of construction projects to determine the effect of the payment variation system on the safest cash flow for the contractor. In this research, the case study used for the calculation of payment system variations on cash flow is the AKN Putra Sang Fajar Blitar integrated laboratory construction project. The payment system used is the progress term payment system. The method used to obtain these results is done by varying the down payment and work progress. There are 6 variations (V) used, namely V1 down payment (0%) work progress 20%, V2 down payment (0%) work progress 25%, V3 down payment 10% work progress 10%, V4 down payment 10% work progress 25%, V5 down payment 20% work progress 20%, V6 down payment 20% work progress 25%. From the results that have been obtained, the highest peak overdraft is in V2 amounting to -Rp5,365,573,659.76 and the lowest is in V3 amounting to -Rp2,864,421,825.56. Meanwhile, the final overdraft value is the same in each variation, which is Rp824,863,740.58. Therefore, the safest variation is V3 with the lowest peak overdraft. The effect of the variation of the payment system that has been known is that the greater the down payment in each variation, the lower the peak overdraft, as well as the smaller the work progress term, the lower the peak overdraft.