DASAR PERENCANAAN PEMBANGKIT LISTRIK TENAGA SURYA Rafael Sianipar
Jetri : Jurnal Ilmiah Teknik Elektro Jetri Volume 11, Nomor 2, Februari 2014
Publisher : Website

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (749.245 KB) | DOI: 10.25105/jetri.v11i2.1445

Abstract

Solar energy as a source of primary energy is a renewable energy. It is available abundantly in Indonesia. One of the technological utilization of solar energy into electrical energy is the use of photovoltaic or solar modules, called Photovoltaic Power Plant or PLTS. At present, the utilization of solar energy for power generation sources is growing rapidly in a wide range of power scaling. However, there is no standard was established in Indonesia in connection with the construction of photovoltaic power generation. Photovoltaic power plant currently purposed to speed up electrification ratio and reduce the consumption of fuel in remote area, which generally scale power plants below 1 MW. PLN as State Owned Electricity Company is responsible in raising the electrification ratio needs a technical standard that can be used by region office in planning and building a PLTS. This paper describes the base-configuration of photovoltaic system, important technical specifications of main equipment such as solar modules, inverters and batteries, the consideration to choose the capacity is also included. Keywords: solar energy, photovoltaic, base-configuration, deep cycleEnergi surya merupakan sumber energi terbarukan yang tersedia secara berlimpah di Indonesia. Salah satu cara memanfaatkan energi surya adalah dengan mengubahnya menjadi energi listrik menggunakan modul fotovoltaik atau modul surya yang disebut pembangkit listrik tenaga surya (PLTS). Dewasa ini pemanfaatan energi surya sebagai pembangkit tenaga listrik berkembang pesat, akan tetapi belum ada standard terkait pembangunan PLTS di Indonesia. Pembangunan PLTS dapat mempercepat rasio kelistrikan dan mengurangi konsumsi bahan bakar minyak di daerah terpencil. PLN yang bertanggung jawab dalam meningkatkan rasio kelistrikan memerlukan standard teknis yang dapat digunakan oleh kantor wilayah dalam merencanakan dan membangun PLTS. Pada makalah ini dibahas konfigurasi dasar PLTS, spesifikasi teknis peralatan utama seperti modul surya, inverter dan baterai serta pertimbangan dalam menentukan kapasitas PLTS. Kata kunci: energy surya, fotovoltaik, konfigurasi dasar
PENGASUTAN MOTOR INDUKSI DAYA BESAR DENGAN MENGGUNAKAN KAPASITOR Rafael Sianipar
Jetri : Jurnal Ilmiah Teknik Elektro Jetri Volume 12, Nomor 1, Agustus 2014
Publisher : Website

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (607.356 KB) | DOI: 10.25105/jetri.v12i1.1451

Abstract

The increasing number of large induction motors use as production equipment is realized to lower the electric quality due to electric shock every time the motor are started directly to the grid. It will adversely affect the performance of production machines around them so it is necessary to overcome the electric shock technically. Whena large induction motoris started,it has highly inductive nature which indicates that a large reactive power is required. The severe electric shock can be avoided if the reactive power demand in the conductors can be compensated from outside of the system. The discussion shows that the use of capacitors is able to reduce the voltage shock whenever a large induction motor is starteddirectly to the grid. Keywords: direct starting, reactive power compensation, capacitor startPenggunaan peralatan produksi yang digerakan oleh motor induksi yang semakin bertambah banyak disadari akan menurunkan mutu listrik akibat timbulnya goncangan tegangan setiap kali dilakukan pengasutan motor secara langsung. Hal tersebut akan berdampak buruk terhadap kinerja mesin produksi lain disekitarnya sehingga perlu suatu upaya teknis untuk mengatasinya. Setiap motor induksi besar pada awal dijalankan bersifat sangat induktif, yang mengindikasikan adanya kebutuhan daya reaktif yang besar. Goncangan tegangan yang besar dapat dikurangi jika aliran kebutuhan daya reaktif dalam penghantar dikompensasi dari luar sistem. Dari pembahasan diperoleh kesimpulan bahwa penggunaan kapasitor saat pengasutan mampu mengurangi goncangan tegangan setiap kali motor induksi besar diasut langsung ke jala-jala. Kata kunci: pengasutan  motor  secara  langsung,  kebutuhan  daya  reaktif, kapasitor saat pengasutan 
PENENTUAN DAYA MAKSIMUM MOTOR INDUKSI YANG DIIZINKAN UNTUK DIASUT SECARA LANGSUNG Rafael Sianipar
Jetri : Jurnal Ilmiah Teknik Elektro Jetri Volume 12, Nomor 1, Agustus 2014
Publisher : Website

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (854.71 KB) | DOI: 10.25105/jetri.v12i1.1452

Abstract

When big electric motors directly operated to the distribution system,  large current with the value equal to short circuit current that flow in the conductor can be considered as a problem for the system. This condition is harmful to consumer especially industrial equipment because of the voltage shock that can damage quality of the industrial production. To solve this problem, should be equiped with the right capacity induction motor based on power system design, so that voltage shock that appears on every motor start will not exceeds specified limit. The maximum capacity of the motor allowed to start is determined based on the voltage shock criteria in the amount of 8% , 4% And 1,5% that valid  in Indonesia. Keywords: Direct starting, Voltage shock, short circuit current.Permasalahan yang timbul bila motor motor listrik besar dioperasikan secara langsung kejaringan distribusi adalah timbulnya arus mula yang besar setara dengan arus hubung singkat dalam penghantar. Hal ini akan berakibat pada konsumen terutama terhadap peralatan–peralatan  industri sebab goncangan tegangan yang terjadi dapat merusak mutu suatu hasil produksi. Untuk mengatasi persoalan tersebut diatas maka diperlukan pemilihan kapasitas motor induksi yang tepat berdasarkan data rancangan sistem tenaga, agar goncangan tegangan yang timbul setiap kali pengasutan motor dilakukan tidak melebihi batas yang sudah ditentukan. Penentukan kapasitas motor maksimum yang di diperkenankan untuk diasut langsung didasarkan pada kriteria goncangan tegangan sebesar 8% , 4% dan 1,5% yang berlaku di Indonesia. Kata kunci: pengasutan langsung, tegangan kejut, arus hubung singkat.