Analisis Percepatan Pekerjaan Fondasi Dan Struktur Pada Proyek Konstruksi Pembangkit Listrik Tenaga Uap (PLTU) Tembilahan Propinsi Riau Swempri Agung Prasetyo; Hendra Taufik; Rian Tri Komara
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 4, No 1 (2017): Wisuda Februari Tahun 2017
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The implementation of construction projects often mismatch between the planning schedule and the realization at site like Coal Fired Steam Power Plant Project (PLTU) in Tembilahan has been delayed during construction.. Considering the increasing need of electric energy significantly in electricity system in Indragiri Hilir, therefore the construction of Coal Fired Steam Power Plant Project in Tembilahan must be finished soon. Overall progress (consists of Engineering Procurement Construction) till July 2015 had already reached 65%. In the item of civil construction work until this August 2015 is about 48% so that effort in accelerating the work implementation should be made soon to pursue a delay that until now still have deviation. The acceleration of implementation work was done by some simulations, like in simulation 1 there is no additional workers, simmulation 2 is additional overtime hours, simulation 3 is additional workers and equipment, and also there is additional overtime hours as many as the number of workers and equipments in simulation 4. The analysis is focused on foundation work and the structure of the building/area in which the material already available there and should be installed (erection) because their work is a critical path and directly impact on steam power plant system. From the analysis, it obtained the optimum cost and time that the simulation of 3 get the optimum cost as much as Rp6.377.772.000 and cost performance index (CPI) as much as 0,98 and simulation 4 get optimum time of 183 days and schedule performance index (SPI) of 1,01.Keyword : progress, overtime hour, critical path, optimum cost, optimum time
Analisa Pertumbuhan Wilayah Dan Perubahan Lahan Terhadap Pengembangan Fungsi Jalan Garuda Sakti, Kecamtan Tampan, Pekanbaru Zulhandika Zulhandika; Rian Tri Komara; Sri Djuniati
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 4, No 2 (2017): Wisuda Oktober Tahun 2017
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Tampan is one of the sub-districts in Pekanbaru City, with flat geographical position between 0 ° 42'-0 ° 50 'North Latitude and between 101 ° 35'-101 ° 43' East Longitude. In Regional Regulation Spatial Plan Pekanbaru, Tampan subdistrict is a Development Area (WP) V. Development Area V is a center of residential, occupation, industrial, office, government and trade. The number of residents Kecamatan Tampan are 220,208 in 2015. This increased by 3.12 percent from 2014. Population density 3,682 inhabitants / km2Conducted to find out the extent of the impact caused by the development and change of land function which is marked by the utilization of land for the activities in the suburbs towards the function of Garuda Sakti street, Tampan Sub-district. The objective of this study is to produce the projection of Garuda Sakti Street function in the next five years, namely in 2022.The changes in residential land, trade and services, education and healt is increasing an average of 17.02 per year. movement of settlement area by 0,0095 smp/hour/m2, trade and service area of 0,0111 smp/hour/m2, education area 0,2603 smp/hour/m2 and health area 0,1738 Smp / hour / m2. The volume of traffic flow at peak hour is 1567 smp/hour. With a capacity of 1866 pcu/hour, the road class is debated into the secondary collector category.The suggestion in this research is that it is needed to improve the management of traffic engineering and consider to raise the road class become the primary collector.Keyword: Regional Development, Land Changes
Analisis Pertumbuhan Wilayah Dan Perubahan Lahan Terhadap Pengembangan Fungsi Jalan Di Kelurahan Bencah Lesung Kecamatan Tenayan Raya kota Pekanbaru Roro Wilis Irene; Rian Tri Komara; Sri Djuniati
Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains Vol 4, No 2 (2017): Wisuda Oktober Tahun 2017
Publisher : Jurnal Online Mahasiswa (JOM) Bidang Teknik dan Sains

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The aims of this paper is to examine the influence of the landuse changing towards traffic generation on Hangtuah street’s corridor in Pekanbaru city. The object that to attained are to identification the condition of landuse and transportation , calculate the traffic flow (traffic counting) for each landuse, analyze the development of the landuse, analyze the trip generation, and analyze the influence of the landuse changing towards traffic generation on Hangtuah street’s corridor in Bencah Lesung subdistrict in Pekanbaru city.The research method that used in this paper is descriptive that identification landuse condition and transportation at Hangtuah street. Then, performed analysis of landuse’s development, analysis of generation and attraction, and analysis of the influence of landuse towards generation and attraction of Street of Hangtuah street in Bencah Lesung Subdistrict in Pekanbaru city.Keywords: landuse, traffict, transportation