Application Of CPM Methode (Critical Path Methode) In Controlling The Time 100 Teus Contrainer Ship Hull Construction Project Mia Syafrina; Fandy Bestario Harlan
JURNAL AKUNTANSI, EKONOMI dan MANAJEMEN BISNIS Vol 9 No 1 (2021): Jurnal Akuntansi, Ekonomi dan Manajemen Bisnis - Juli 2021
Publisher : Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30871/jaemb.v9i1.3194

Abstract

Construction projects are generally the most high-risk businesses, especially shipbuilding projects. Efforts to reduce the risk can be done by minimizing the potential risk. This study aims to see potential high risk and prevent delays in the completion of ship construction using the Critical Path Method CPM at PT. XYZ. By using the Critical Path Method CPM critical paths can be given more attention so that they will not interfere ship construction projects. In addition, it is also a form of anticipation if there is a delay, it is possible to reschedule.