Dampak Pembangunan Minapolitan Terhadap Kinerja Lalu Lintas Muhamad Yusuf; Anton Budiharjo; Mohammad Archi Maulyda
Jurnal Teknik: Media Pengembangan Ilmu dan Aplikasi Teknik Vol 20 No 1 (2021): Jurnal Teknik - Media Pengembangan Ilmu dan Aplikasi Teknik
Publisher : Fakultas Teknik - Universitas Jenderal Achmad Yani

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26874/jt.vol20no1.373

Abstract

The development of the minapolitan tourist area in Semarang City, is expected to generate attraction and generation of new trips. The development of this area will have an impact on the performance of the surrounding traffic. The purpose of this research is to analyze and predict the impact of traffic due to the development of the minapolitan area and provide recommendations for mitigation. Primary data collection is carried out through direct field surveys, including instantaneous speed surveys, inventory of sections and intersections, traffic volume, public transport and pedestrians and secondary data obtained from data from related agencies. The impact during the construction period is the mobilization of heavy equipment, the pull, and generation of worker activities, safety, and health issues. Meanwhile, during the operational period, namely the availability of parking space, pedestrian activity, geometric roads and entrance, and exit design as well as traffic safety and smoothness, the performance of sections and intersections, has increased from the existing stage, the construction period, the operational period to the next 5 years from the operational period. The results of the analysis show that minapolitan development will cause travel attraction of 103.31 pcu/hour and a generation of 102.82 pcu/hour.
DAMPAK LINGKUNGAN PEMBANGUNAN PABRIK FARMASI XYZ DI JAWA TENGAH Muhamad Yusuf
EnviroScienteae Vol 18, No 1 (2022): ENVIROSCIENTEAE VOLUME 18 NOMOR 1, APRIL 2022
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/es.v18i1.13003

Abstract

The construction of a pharmaceutical factory has an impact in the form of a decline in the surrounding environment. This study aims to determine the environmental impact arising from construction a pharmaceutical factory. A descriptive qualitative approach was used. Analyses show that the development meets the environmental baseline in terms of the geo-physical aspect, but for the water around the location for several parameters it is above the quality standard, in terms of the biological environmental baseline it meets as a project development area, and In terms of the socio-economic and cultural components of the community. Some of the components that influence and cause a decline in development include: Physical and Chemical Environment, community social environment, environmental health. To overcome the problems that arise, recommendations are given for the water that will be used for factory operations by making a storage pond to accommodate rainwater and treated water from the WWTP so that it can be processed into clean water in the RWTP unit and management is carried out on all components of activities that have an impact. As a result, the pharmaceutical factory can be constructed according to plan.
KINERJA EKSPERIMEN KOLEKTOR SURYA DENGAN MEDIA TRANSFER PANAS BATU GRANIT DAN MINYAK KELAPA SAWIT Mustaqim; Ahmad Farid; Hadi Wibowo; Muhamad Yusuf; Najarudin; Winarno; Arfian
Prosiding Seminar Nasional Teknoka Vol 4 (2019): Prosiding Seminar Nasional Teknoka
Publisher : Fakultas Teknik, Universitas Muhammadiyah Prof. Dr. Hamka, Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (448.294 KB) | DOI: 10.22236/teknoka.v4i0.4289

Abstract

Telah dilakukan penelitian kinerja kolektor panas matahari dengan media penyerap panas batu granit sebagai upaya memanfaatkan sumber daya alam Indonesia. Ukuran kolektor panas matahari adalah 100 cm x 60 cm x 5 cm. Digunakan media penyerap panas matahari adalah udara, batu granit ukuran butiran 1 mm, dan batu granit ukuran butiran 3 mm. Fluida kerja penyerap panas kolektor adalah minyak kelapa sawit dengan laju aliran 1,5 LPM. Kemiringan kolektor terhadap cahaya datang matahari 30° menghadap utara. Pertumbuhan temperature fluida kerja diukur setiap 30 menit selama 6 jam yaitu dari pukul 09.00 WIB sampai 15.00 WIB. Analisis energy dilakukan untuk mengetahui perbandingan kinerja media penyerap panas yang digunakan tersebut. Hasil penelitian menunjukan bahwa beda temperatur fluida kerja masuk dan keluar kolektor tertinggi dicapai antara jam 09.30 sd. Jam 12.00. Kinerja effisiensi kolektor dengan media batu granit butiran 3 mm lebih baik dibanding dengan menggunakan media udara dan media batu granit butiran 1 mm.
Evaluasi Penerapan Keselamatan dan Kesehatan Kerja (K3) Konstruksi Pada Proyek Pembangunan Rumah Sakit Mitra Siaga 2 Tarub Kabupaten Tegal isradias mirajhusnita; Teguh Haris santoso; Muhamad Yusuf; Muhamad Fajar sidiq; Hadi Wibowo
Engineering : Jurnal Bidang Teknik Vol 13 No 2 (2022): Oktober 2022
Publisher : Universitas Pancasakti Tegal

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24905/eng.v13i2.2057

Abstract

Keselamatan kerja adalah hak dasar bagi tenaga kerja pada proyek konstruksi yang bertujuan untuk menghindari terjadinya kecelakaan kerja (Prabowo, 2019). Mengacu pada Pasal 2 Undang-undang Jasa Konstruksi tentang penyelenggaraan jasa konstruksi yang berlandaskan pada keamanan dan keselamatan, maka penulis melakukan penelitan terhadap penerapan Keselamatan Kesehatan Kerja (K3) Konstruksi pada Pembangunan Rumah Sakit Mitra Siaga 2 Tarub. Dalam penelitian ini penulis menggunakan metode analisa deskiptif dibantu dengan software SPSS dalam pengujian hasil analisisnya. Hasil penelitian menunjukan bahwa jawaban reponden dari kuesioner tentang pelaksanaan K3 adalah sebesar 0% responden menjawab pilihan 1, sebesar 3% responden menjawab pilihan 2, sebesar 17,3% responden menjawab pilihan 3, sebesar 33% responden menjawab pilihan 4, dan 46% responden menjawab pilihan 5. Sehingga dapat disimpulkan bahwa prosedur K3 konstruksi pada proyek Pembangunan Rumah Sakit Mitra Siaga 2 Tarub telah diterapkan dengan baik.