Asesmen Struktur Gedung Kantor Camat Nongsa Batam Murni, Cahaya; Rahmadi, Agus Parwito; syafii, syafii
Jurnal Teknik Sipil Vol 2, No 2 (2014): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kondisi bangunan gedung Kantor Camat Nongsa Batam mengalami retak struktur yang menyebar pada beberapa bagian struktur bangunan. Retak tersebut secara visual terlihat adanya lendutan pada balok struktur, hal ini dikhawatirkan bangunan sudah tidak aman lagi sesuai fungsinya. Tesis ini bertujuan untuk mengetahui kekuatan pada komponen struktur bangunan serta mengetahui tingkat keamanan struktur pada kondisi eksisting bangunan. Tahapan asesmen yang digunakan yaitu tahapan asesmen awal dan asesmen detail. Tahapan analisis dilakukan terhadap kondisi kekuatan komponen struktur. Proses asesmen dilakukan melalui pengujian lapangan. Pengujian di lapangan menggunakan peralatan Schmidt Rebound Hammer Test untuk mengetahui kuat tekan beton dan mutu beton, Waterpass, Theodolite, , dan meteran untuk pengukuran geometris bangunan. Analisis data menggunakan ETABS V9.7.2. Hasil penelitian yang dilakukan dilapangan menunjukkan bahwa kualitas beton pada bangunan gedung ini bervariasi pada kolom 21.71MPa, balok 29 MPa dan Plat 30.6 MPa. Pada balok lantai dua ( 87%) dan balok lantai tiga (84%) mengalami lendutan yang sudah melebihi nilai batas lendutan yang diijinkan sesuai ketentuan di dalam peraturan yang ada. Nilai interstory drift terbesar 18.637 mm. Perlunya rehabilitasi pada komponen struktur sehingga direkomendasikan adanya perkuatan struktur pada komponen struktur. Kata Kunci : asesmen, pengujian, defleksi, interstory drift, analisis data, komponen struktur, perkuatan.
PARAMETRIC STUDY FACTORS AFFECTING PROJECT MANAGEMANT OF CONSTRUCTION IN SOUTH LIBYA Mohamed, Alsadik; Astuti, Winny; Rahmadi, Agus Parwito
Jurnal Teknik Sipil Vol 2, No 2 (2014): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract Unexpected delays in construction projects are caused by owner,contractor, or a third party in which several types of delays may occurconcurrently. The effect of delays does not only influence the construction industry but the overall economy as well. As such, the objectives of the presented research in this paper are to identify, study, the factors that caused the delay in project duration. Simulation-based Analytic Hierarchy Process (AHP). Were collected the data from owner and companies in Ghat, Libya. The model is implemented to the collected data, which show robust results. Based upon collected the data for the project of 3000 Houses in Ghat. The priorities according to the analysis of hierarchical (AHP) are from the questioners, the most important in this problem of project is Management conditions ranked first at 0.470. The next is Project conditions ranked 0.370 the last Environmental conditions ranked at 0.160.This result is to the real case study of project. In management the result problem, payment delay and Time to make Decision and productivity uncertainty of labor is big problem from management condition. The Project conditions are the second problem from the project. In project conditions the result problem, material availability is biggest problem from project condition. The environmental condition is the third problem from the project. In environmental conditions the result problem, labor strike and shortage of human resources is largest problem from environmental conditions. Keywords: Factors, Delays, construction,  AHP, Libya. 
EXPERIMENTAL INVESTIGATION ON THE ABSORPTION CHARACTERISTIC OF CONCRETE PATCH REPAIR MATERIALS Ashlembo, Nassr Omer Shahat; Kristiawan, Stefanus Adi; Rahmadi, Agus Parwito
Jurnal Teknik Sipil Vol 3, No 1 (2015): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRACTStudying absorption of concrete patch repair material is very important for determining its durability and compatibility with concrete being repaired. The objectives of this research were: to determine the absorption of various repair materials and to assess the compatibility of these repair materials with concrete based on the absorption measurement. Absorption rate was determined based on ASTM C 1585-04. The result showed that unsaturated polyester resin-mortar (UPR-M) had the lowest rate of absorption measurement indicating that it is sufficient protection. The highest measurement values for rate of absorption was found for concrete with normal mortar repair material (NM) indicating that it did not provide sufficient protection. Keywords: absorption rate, concrete, patch repair materials
ASESMEN STRUKTUR GEDUNG KANTOR CAMAT NONGSA BATAM Murni, Cahaya; Rahmadi, Agus Parwito
Jurnal Teknik Sipil Vol 2, No 2 (2014): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstrak  Kondisi bangunan gedung Kantor Camat Nongsa Batam mengalami retak struktur yang menyebar pada beberapa bagian struktur bangunan. Retak tersebut secara visual terlihat adanya lendutan pada balok struktur, hal ini dikhawatirkan bangunan sudah tidak aman lagi sesuai fungsinya. Tesis ini bertujuan untuk mengetahui kekuatan pada komponen struktur bangunan serta mengetahui tingkat keamanan struktur pada kondisi eksisting bangunan.Tahapan asesmen yang digunakan yaitu tahapan asesmen awal dan asesmen detail. Tahapan analisis  dilakukan terhadap kondisi kekuatan komponen struktur. Proses asesmen dilakukan melalui pengujian lapangan. Pengujian di lapangan menggunakan peralatan Schmidt Rebound Hammer Test untuk mengetahui kuat tekan beton dan mutu beton, Waterpass, Theodolite, , dan meteran untuk pengukuran geometris bangunan. Analisis data menggunakan ETABS V9.7.2.Hasil penelitian yang dilakukan dilapangan menunjukkan bahwa  kualitas beton pada bangunan gedung ini bervariasi pada kolom 21.71MPa, balok 29 MPa dan Plat 30.6 MPa. Pada balok lantai dua( 87%) dan balok lantai tiga  (84%) mengalami lendutan yang sudah melebihi nilai batas lendutan yang diijinkan sesuai ketentuan di dalam  peraturan yang ada. Nilai interstory drift terbesar 18.637 mm. Perlunya rehabilitasi pada komponen struktur sehingga direkomendasikan adanya perkuatan struktur pada komponen struktur.
PERKUATAN STRUKTUR ATASJEMBATAN KOMPOSITDENGAN METODE PRATEGANG EKSTERNAL Wakid, Muktar; Kristiawan, Stefanus Adi; Rahmadi, Agus Parwito
Jurnal Teknik Sipil Vol 2, No 1 (2014): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakJembataan Gandong yang dibangun jaman Belanda tahun 1895 dan direhabilitasi bangunan atasnya pada tahun 1975, yang berlokasi di Kabupaten Magetan, jembatan tersebut saat ini mengalami defleksi 5 cm. Asesmen terhadap jembatan ini memberikan rekomendasi untuk dilakukan perkuatan dengan sistem Prategang Eksternal.Jembatan Gandong berada di pusat kota magetan, mempunyai 3 bentang dengan panjang setiap bentang 12 m, lebar 12 m dengan spesifikasi beban jalan raya BM 100. Analisis  struktur jembatan menggunakan formula "Rating Equation" (Dong-Ho Choi, Yong-Sik Kim and Hoon Yoo, 2003)Hasil perkuatan ini memberikan hasil gaya prategang (T) =  23.000 kN, spesivikasi tendon menggunakan VSL Ø 13 mm, defleksi desain = 6,31 cm telah memenuhi syarat ijin. Kata kunci:  Perkuatan , Prategang Eksternal, Increment (?T), Lendutan, Tegangan.