Dian Mardi Safitri
Industrial Engineering Departement Trisakti University Jl. Kyai Tapa no 1 Jakarta, 11440

Published : 5 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Rekayasa Sistem Industri

Human Reliability Assessment dengan Metode Human Error Assessment and Reduction Technique pada Operator Stasiun Shroud PT. X Safitri, Dian Mardi; Astriaty, Ayu Rachma; Rizani, Nataya C.
Jurnal Rekayasa Sistem Industri Vol 4, No 1 (2015)
Publisher : Jurnal Rekayasa Sistem Industri

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (142.904 KB)

Abstract

Human realibility is a big tricky problem. Human failure rates depend on three main factors, namelyintrinsic, work environment, and stress. PT. X is a supplier for PT. LG Indonesia manufacturing productsmade from plastics. Human Realibility Assesment is conducted using HEART methods (Human ErrorAssessment and Reduction Technique). In the first phase, task analysis on operators’ activities is done usingHierarchical Task Analysis (HTA). The largest Human Error Probability was found when Operator No. 1did not insert the flash side carefully. The value of this probability is 0.53424. This factor is concluded as themain cause to shroud defectives, which results in customer penalyzing the company.
Human Reliability Assessment dengan Metode Human Error Assessment and Reduction Technique pada Operator Stasiun Shroud PT. X Safitri, Dian Mardi; Astriaty, Ayu Rachma; Rizani, Nataya C.
Jurnal Rekayasa Sistem Industri Vol 4, No 1 (2015): Jurnal Rekayasa Sistem Industri
Publisher : Universitas Katolik Parahyangan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (142.904 KB) | DOI: 10.26593/jrsi.v4i1.1388.1-7

Abstract

Human realibility is a big tricky problem. Human failure rates depend on three main factors, namelyintrinsic, work environment, and stress. PT. X is a supplier for PT. LG Indonesia manufacturing productsmade from plastics. Human Realibility Assesment is conducted using HEART methods (Human ErrorAssessment and Reduction Technique). In the first phase, task analysis on operators’ activities is done usingHierarchical Task Analysis (HTA). The largest Human Error Probability was found when Operator No. 1did not insert the flash side carefully. The value of this probability is 0.53424. This factor is concluded as themain cause to shroud defectives, which results in customer penalyzing the company.