Amril Ma’ruf Siregar
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Lampung, Bandar Lampung, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Investment Analysis of New Port Development Project As a Solution to Overload Problems in Long Ports Pandi Aditiya; ahmad herison; Ika Kustiani; Amril Ma’ruf Siregar
SPATIAL: Wahana Komunikasi dan Informasi Geografi Vol 19 No 2 (2019): Spatial : Wahana Komunikasi dan Informasi Geografi
Publisher : Department Geography Education Faculty of Social Science - Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (280.843 KB) | DOI: 10.21009/spatial.192.7

Abstract

The increasing demand for port services at the Panjang port causes high levels of ship queues. The solution to overcome this problem is to build a new port. However, this new port construction project has not yet conducted a feasibility study. The purpose of this study is to assess the feasibility of port development in the Panjang district of Bandar Lampung in terms of investment or financial aspects. The methods are Benefit-Cost Ratio, Net Present Value, Payback Period, and Internal Rate of Return. The results of the feasibility study of the most profitable investment are in the seventh scenario, the Net Present Value (NPV) of Rp. 463,292,122,605.34, the BCR result of 1.2959, the IRR yield of 12.11% and the Payback Period (PP) occur in the year to thirty-seventh with an economic age of 60 years. The conclusion is that the construction of a new port can be a solution to overcome the overload of Panjang port.