This Author published in this journals
All Journal Jurnal Titra
Renny Olivia Sia
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perancangan Sistem Perencanaan dan Penjadwalan Produksi di PT. Bondi Syad Mulia Sia, Renny Olivia; Widyadana, I Gede Agus
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This research is a case study conducted at PT. Bondi Syad Mulia, which is a galvanishing services company. Production planning at PT. Bondi Syad Mulia combined with production department, so that the work does not focus and cause some problems in production planning. The proposed planning system is set up the PPIC department, so that production planning does not interfere with affairs that must be done by the production department. Another issue that arises is the production delays because there is do not have a good system of production scheduling. Determine the right scheduling for a company is very important, but not easy, especially for a service company that manufactures a wide range of products. This thesis aims to get the system scheduling to minimize makespan, thus increasing the amount of output produced. The method used to achieve these criteria is Algorithm Campbell, Dudek, and Smith (CDS) and Shortest Processing Time method (SPT). CDS scheduling algorithm results provide several alternative job sequences that generate makespan value is almost the same, but there is a job sequence that produces the smallest makespan value compared to other alternative job sequences.
Perancangan Sistem Perencanaan dan Penjadwalan Produksi di PT. Bondi Syad Mulia Renny Olivia Sia; I Gede Agus Widyadana
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (197.17 KB)

Abstract

This research is a case study conducted at PT. Bondi Syad Mulia, which is a galvanishing services company. Production planning at PT. Bondi Syad Mulia combined with production department, so that the work does not focus and cause some problems in production planning. The proposed planning system is set up the PPIC department, so that production planning does not interfere with affairs that must be done by the production department. Another issue that arises is the production delays because there is do not have a good system of production scheduling. Determine the right scheduling for a company is very important, but not easy, especially for a service company that manufactures a wide range of products. This thesis aims to get the system scheduling to minimize makespan, thus increasing the amount of output produced. The method used to achieve these criteria is Algorithm Campbell, Dudek, and Smith (CDS) and Shortest Processing Time method (SPT). CDS scheduling algorithm results provide several alternative job sequences that generate makespan value is almost the same, but there is a job sequence that produces the smallest makespan value compared to other alternative job sequences.