ANALISIS PERBANDINGAN PENYEDIAAN BAHAN MATERIAL STRUKTUR LANTAI 2 DENGAN METODE MATERIAL REQUIREMENT PLANNING (MRP) (STUDI KASUS: PROYEK GEDUNG GUEST HOUSE V HOTEL) Sopiyah, Yayah; Pramono, Didiek
Prosiding PESAT Vol 5 (2013)
Publisher : Prosiding PESAT

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Material merupakan komponen yang sangat penting dalam sebuah proyek konstruksi,karena itu persediaan material merupakan hal yang sangat penting juga dalammenunjang kelancaran seluruh aktifitas pelaksanaan pekerjaan suatu proyek konstruksi.Perencanaan yang kurang baik dalam merencanakan persediaan material dapatmenyebabkan keterlambatan dan kehabisan persediaan yang mengakibatkan pekerjaantertunda dan secara tidak langsung akan mempengaruhi waktu pelaksanaan dan biayaproyek. Tujuan penelitian ini adalah untuk memperoleh teknik yang tepat dari teknik lotsizing yang dibandingkan dan untuk mendapatkan total biaya persediaan materialstruktur lantai 2 yang paling minimum. Perencanaan persediaan material menggunakanmetode Material Requirement Planning (MRP) dengan teknik Lot Sizing yang terdiri dari4 (empat) teknik, yaitu Lot For Lot, Economic Order Quantity (EOQ), Period OrderQuantity (POQ), dan Part Period Balancing (PPB). Dari hasil analisis denganmenggunakan metode Material Requirement Planning, yaitu dengan menggunakan teknikLot Sizing didapatkan hasil bahwa teknik Lot Sizing yang membentuk biaya persediaanyang minimum untuk kebutuhan material multipleks 9 mm, kayu 5/7, kayu 8/12, besi D12, dan besi d 13 adalah teknik Part Period Balancing. Untuk material multipleks 12 mm,besi D 10, besi D 16, dan besi D 19 menggunakan teknik Period Order Quantity. Untukmaterial besi D 22 menggunakan teknik Lot For Lot. Untuk material beton K-300menggunakan teknik Lot For Lot, Period Order Quantity, dan teknik Part PeriodBalancing. Sedangkan untuk material beton K-400 menggunakan teknik Period OrderQuantity, dan teknik Part Period Balancing.
ANALISIS DAN RESPON RISIKO PADA PROYEK KONSTRUKSI GEDUNG Sopiyah, Yayah; Salimah, A’isyah
Construction and Material Journal Vol 2, No 1 (2020): CONSTRUCTION AND MATERIAL JOURNAL VOL. 2 NO. 1 MARET 2020
Publisher : Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract  High-rise Building construction projects can be said as high-risk projects, this is based on the construction process which usually takes a long time and is complex, so that it can cause uncertainties that create various risks. Risk is a combination of the probability of an event and the impact of that event. The impact of risks can affect productivity, quality and project cost budgets. The purpose of this study is to identify the risks that occur in the magnitude of the influence on building construction projects and analyze the risk responses that occur at building construction projects. In this research, risk analysis, risk identification and risk response carried out at two different building construction projects with two different contractors. Risk identification carried out by conducting a literature study, assessing the frequency / probability of risk and assessing the impact of risks using the Severity Index, identifying risks using the Probability Impact Matrix. From the results of the analysis it has been concluded that there is one risk variable that is included in the large category, the risk variable is the "estimated time error". The risk response discussed is to the estimated time error, design changes and changes in the schedule of work implementation. Large percentage of risk variables, which affect the performance or implementation of construction projects is the estimated time error of 67.8%, a change in design: of 23.9% and changes in the work implementation schedule of : 8.3%.Keywords : risk, risk response, building construction projectsAbstrak Proyek konstruksi gedung bertingkat dapat dikatakan sebagai proyek yang berisiko tinggi, hal ini didasari pada proses konstruksi yang biasanya memakan waktu cukup lama dan kompleks sehingga dapat menimbulkan ketidakpastian yang memunculkan berbagai risiko. Risiko merupakan kombinasi dari probabilitas suatu kejadian dan dampak dari kejadian tersebut. Dampak risiko dapat mempengaruhi produktivitas, kualitas dan anggaran biaya proyek. Tujuan penelitian ini adalah mengidentifikasi risiko-risiko yang terjadi dan besarnya pengaruh pada proyek konstruksi gedung dan menganalisis respon risiko yang terjadi pada proyek konstruksi gedung. Pada penelitian ini akan dilakukan analisis risiko, identifikasi risiko dan respon risiko pada dua proyek konstruksi gedung yang berbeda dengan dua kontraktor yang berbeda. Identifikasi risiko yang dilakukan adalah dengan melakukan studi literatur, penilaian frekuensi/probabilitas risiko dan penilaian dampak risiko menggunakan Severity Index sedangkan untuk identifikasi risiko menggunakan Probability Impact Matrix. Dari hasil analisis yang telah dilakukan diperoleh kesimpulan bahwa terdapat satu variabel risiko yang termasuk kategori besar, variabel risiko itu adalah “kesalahan estimasi waktu”. Respon risiko yang dibahas adalah kepada kesalahan estimasi waktu, adanya perubahan desain dan perubahan jadwal pelaksanaan pekerjaan. Besar presentase variabel risiko, yang berpengaruh terhadap kinerja atau pelaksanaan proyek konstruksi adalah kesalahan estimasi waktu sebesar 67.8%, adanya perubahan desain: 23.9% dan perubahan jadwal pelaksanaan pekerjaan: 8.3%Kata kunci  : analisis risiko, respon risiko, proyek konstruksi gedung