Claim Missing Document
Check
Articles

Found 6 Documents
Search

UJI PEMADATAN STANDAR DAN UJI PEMADATAN MODIFIED TERHADAP TANAH YANG DICAMPUR KAPUR Nurmaidah Nurmaidah; Suranto Suranto
JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION Vol 6, No 1 (2022): JCEBT MARET
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jcebt.v6i1.6828

Abstract

Compaction in the laboratory produces the maximum dry volume weight achieved at a certain water content. Compaction test is very dependent on the type of soil, water content and effort given during compaction. The effort given (compaction energy) is very dependent on the number of layer collisions, number of layers, pounder weight, pounder fall height and mold volume. The higher the effort given, the higher the volume of dry volume achieved. In laboratory mechanics soil compaction can be done by two methods, namely compaction with Standard Proctor and Modified Proctor. This study aims to obtain comparison results of the value of maximum dry density and optimum moisture content by using the Standard Proctor and Modified Proctor methods on land from Jalan Pertahanan - Patumbak mixed with Lime. The results of the analysis of the experiments obtained from the Road of Pertahanan - Patumbak soil by passing No. 200 loss 40.06%, Liquid Limit (LL) 31.60%, Plastic Limit (PL) 16.87%, Plastic Index (PI) 14, 73%. According to the Unified Soil Classification (USCS) this land  is  included  in  the  CL-an  organic  symbol  with  low  to  moderate  plasticity,  while  according  to  the Association of State Highway and Transportation Officials (AASHTO) this land is classified into group A-6 where  this  land  is  widely  available  and  is  often  used  as  embankment  material.  Results  of  compaction experiments using the ASTM D-698 Standard Proctor AASHTO T-99 test obtained maximum dry density of 1.931 gr / cm3, optimum moisture content of 11.90%. whereas, with the testing of Modified Proctor ASTM D-1557 AASHTO T-180, the maximum dry density was 1.946 gr / cm3, the optimum moisture content was 12.1%. The values obtained show that the use of the ASTM D-1557 AASHTO T-180 Modified Proctor method is higher than the ASTM D-698 AASHTO T-99 Standard Proctor method
KAJIAN PERENCANAAN RUTE PADA PROYEK PEMBANGUNAN LRT (LIGHT RAIL TRANSIT) MEDAN Suranto Suranto; Melloukey Ardan; Tika Ermita Wulandari; Samsul A Rahman Sidik Hasibuan
JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION Vol. 6 No. 2 (2022): JCEBT SEPTEMBER
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jcebt.v6i2.7526

Abstract

Masalah kemacetan lalu lintas di kota Medan merupakan masalah yang umum terjadi saat ini. Untuk mengatasi permasalahan tersebut, salah satu alternatif solusi yang dapat dilakukan adalah dengan merancang konsep pembangunan berbasis transit seperti yang telah diterapkan di beberapa negara maju yang dikenal dengan transit-based regional development atau Transit-Oriented Development (TOD), dengan fasilitas yang direkomendasikan menjadi LRT (Light Rail Transit). Dalam perencanaan LRT Medan perlu mempelajari perencanaan rute proyek pembangunan LRT Medan sebagai bahan pertimbangan dalam perencanaan pembangunan agar proyek LRT Medan menjadi efisien. Studi ini bertujuan untuk mendapatkan konsep jaringan koridor LRT yang ideal dan mencari peluang penggunaan LRT di Kota Medan. Sampel yang digunakan dalam studi ini adalah responden masyarakat di wilayah Kota Medan yang berjumlah 100 responden. Hasil studi menunjukkan bahwa perencanaan rute pada proyek pembangunan LRT Medan layak untuk dibangun sesuai koridor yang direncanakan, dan peluang penggunaan LRT di Kota Medan adalah banyaknya masyarakat yang akan menggunakan transportasi LRT.
Kajian Kinerja Lalu Lintas Akibat Rencana Pembangunan LRT di Kota Medan Suranto
Jurnal Perencanaan Wilayah dan Kota Vol. 17 No. 2 (2022)
Publisher : Program Studi Perencanaan Wilayah dan Kota, UPT Publikasi Publikasi Ilmiah UNISBA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/jpwk.v17i2.1625

Abstract

Pembangunan LRT dipercaya sebagai solusi untuk mengurai kemacetan di Kota Medan. Tujuan penelitian ini untuk mengetahui kinerja arus lalu lintas di sepanjang area proyek pembangunan LRT Medan salah satunya adalah perencanaan rute LRT di Jalan Gatot Subroto (Simpang Jalan Iskandar Muda – Simpang Jalan Ayahanda) yang terjadi penyempitan akibat rencana pembangunan LRT di Kota Medan. Koridor LRT yang direncanakan total panjang jalur adalah 53,76 Km. Panjang bentang jalur Penelitian yang diambil adalah ± 1 km, dengan populasi penduduk kota Medan setiap tahun-nya bertambah 1,45%, data pada akhir tahun 2020 penduduk kota Medan berjumlah 2,435,252 orang. Penelitian ini menggunakan metode PKJI 2014. Kajian dilakukan dengan pengamatan selama 9 jam/hari, dibagi pada pukul 6:00-9:00, 11:00-14:00, dan 16:00-19.00. Hasil LHR penelitian pada hari Minggu 4488 skr/jam dan hari senin 3428,4 skr/jam. Hasil kinerja ruas jalan apabila rencana proyek LRT berlangsung adalah kapasitas 8962,27 skr/jam, derajat kejenuhan rata-rata 0,44, kecepatan arus bebas 52,57 Km/jam, kecepatan waktu tempuh rata-rata 71,90 detik , tingkat pelayanan di hari minggu B dan hari senin C. Hasil pengamatan langsung di lapangan mendekati dengan hasil penelitian yang berarti rencana pembangunan LRT Medan sudah layak untuk dilaksanakan.
AN IMPROVEMENT OF URBAN TRANSPORTATION SYSTEM USING TRANSIT ORIENTED DEVELOPMENT (TOD) METHODS Suranto Suranto
INFOKUM Vol. 10 No. 5 (2022): December, Computer and Communication
Publisher : Sean Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In Indonesia, there is a problem that always occurs where urban transportation in the Medan area is currently not optimally integrated with the urban transportation network which results in long, inconvenient passenger journeys and high transportation costs. so that in research it is necessary to have an integrated network of urban transportation infrastructure in the City of Medan. in this study using the method of analysis used is descriptive analysis. The current problem of urban transportation in the Medinding region is the absence of optimal integration in the urban transportation network which results in long, inconvenient passenger journeys and high transportation costs. This condition encourages people to use private vehicles
Analisis Rencana Anggaran Biaya Pelaksanaan Pembangunan Koperasi TKBM Pelabuhan Belawan Muhammad Sultan Hakim; Melloukey Ardan; Suranto; Nuril Mahda Rangkuti
Jurnal TESLINK : Teknik Sipil dan Lingkungan Vol 5 No 2 (2023): Next Issue on, September 2023
Publisher : Universitas Nusa Putra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52005/teslink.v5i2.278

Abstract

Dalam penelitian ini dilakukan analisis perbandingan harga antara Rencana Anggaran Biaya (RAB) dan Rencana Anggaran Pelaksanaan (RAP) terhadap SNI. Diadakan nya penelitian ini agar bermanfaat bagi pelaku jasa konstruksi maupun mahasiswa dalam merencanakan biaya dengan nilai ekonomis. Dengan perkembangan pembangunan infrastruktur di daerah Sumatera Utara yang cukup tinggi, Medan menjadi salah satu kota yang berpotensi akan pembangunannya. sehingga menyebabkan banyak nya para pengusaha developer memanfaatkan peluang ini. Penelitian ini juga bermanfaat untuk menemukan analisa perbandingan antara harga Rencana Anggaran Biaya, SNI dengan harga Rencana Anggaran Pelaksanaan (biaya nyata), yang nanti nya akan bermanfaat bagi pelaku jasa konstruksi sebagai bahan pertimbang untuk hasil estimasi biaya yang lebih ekonomis, mempermudah kontraktor dalam menentukan besar nya nilai tender. Penelitian ini bertujuan untuk mendapatkan nilai ekonomis berdasarkan hasil perbandingan antara harga Rencana Anggaran Biaya, SNI dengan harga Rencana Anggaran Pelaksanaan pada Pembangunan Koperasi TKBM Pelabuhan Belawan. Berdasarkan hasil analisa, diperoleh nilai akurasi RAB terhadap SNI sebesar 91.11%, dan RAP terhadap SNI sebesar 74.38 %. Dengan ini tingkat akurasi tebesar yaitu RAB terhadap SNI sebesar 91.11%.
Kajian Kinerja Lalu Lintas Akibat Rencana Pembangunan LRT di Kota Medan Suranto
Jurnal Perencanaan Wilayah dan Kota Vol. 17 No. 2 (2022)
Publisher : Program Studi Perencanaan Wilayah dan Kota, UPT Publikasi Publikasi Ilmiah UNISBA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/jpwk.v17i2.1625

Abstract

Pembangunan LRT dipercaya sebagai solusi untuk mengurai kemacetan di Kota Medan. Tujuan penelitian ini untuk mengetahui kinerja arus lalu lintas di sepanjang area proyek pembangunan LRT Medan salah satunya adalah perencanaan rute LRT di Jalan Gatot Subroto (Simpang Jalan Iskandar Muda – Simpang Jalan Ayahanda) yang terjadi penyempitan akibat rencana pembangunan LRT di Kota Medan. Koridor LRT yang direncanakan total panjang jalur adalah 53,76 Km. Panjang bentang jalur Penelitian yang diambil adalah ± 1 km, dengan populasi penduduk kota Medan setiap tahun-nya bertambah 1,45%, data pada akhir tahun 2020 penduduk kota Medan berjumlah 2,435,252 orang. Penelitian ini menggunakan metode PKJI 2014. Kajian dilakukan dengan pengamatan selama 9 jam/hari, dibagi pada pukul 6:00-9:00, 11:00-14:00, dan 16:00-19.00. Hasil LHR penelitian pada hari Minggu 4488 skr/jam dan hari senin 3428,4 skr/jam. Hasil kinerja ruas jalan apabila rencana proyek LRT berlangsung adalah kapasitas 8962,27 skr/jam, derajat kejenuhan rata-rata 0,44, kecepatan arus bebas 52,57 Km/jam, kecepatan waktu tempuh rata-rata 71,90 detik , tingkat pelayanan di hari minggu B dan hari senin C. Hasil pengamatan langsung di lapangan mendekati dengan hasil penelitian yang berarti rencana pembangunan LRT Medan sudah layak untuk dilaksanakan.