Analysis of Operational Delay and Additional Investment Costs, As An Investment Consideration Dina Yunanda; Christiono Utomo; Maranatha Wijayaningtyas
IJEBD (International Journal of Entrepreneurship and Business Development) Vol 3 No 2 (2020): March 2020
Publisher : LPPM of NAROTAMA UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (489.786 KB) | DOI: 10.29138/ijebd.v3i02.1007

Abstract

Purpose: This paper aims to Analysis of Operational Delay and Additional Investment Costs, As an Investment Consideration: Case in Malang Pandaan Toll Road. Design/methodology/approach: The method used is statistic-descriptive and the design used is cross sectional. Findings: 2 hypotheses are while the other is accepted. Research limitations/implications: Variables considered in this study are electronic word of mouth, brand image, brand trust, and interest in saving. The scope of work of the Pandaan Malang Toll Road project has a length of 38 + 488 km, passing through two regions in Figure 1. Practical implications: Results show that from the 2 hypotheses proposed. Originality/value: This paper is original. Paper type: This paper can be categorized as a case study.