ANALISIS INSTALASI LISTRIK MENGGUNAKAN PEMBANGKIT LISTRIK SURYA SKALA RUMAH TANGGA Retno Aita Diantari; Sofitri Rahayu; Rudina Okvasari
Sutet Vol 8 No 2 (2018): JURNAL ILMIAH SUTET
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Indonesia is an archipelago and is located in the tropics. One of the disadvantages of an archipelagic country is that it is difficult to distribute electricity systems centrally, so an easier system needs to be used by utilizing easily available energy sources. Because Indonesia is in the tropics, the source of solar energy is the most appropriate. The purpose of this study is to analysis the electric power generation systems of household as an alternative to meeting electricity needs. From the results of the study, it can be concluded that in the design of a household scale solar power plant it is necessary to calculate solar module capacity, battery capacity, solar charge controller and inverter. Weather and load factors are very influential on the length of a household scale solar power plant operating. The intensity of sunlight received by household scale solar power plant will be high when the sky is clear, and the intensity will decrease if it is in cloudy sky. If the load used is high, the household scale solar power plant will not be able to operate long enough to supply electricity to the load, if the load used is low then the household scale solar power plant can operate relatively longer in supplying electricity to the load.
Penerapan Sistem Daya Cadangan Untuk Lemari Vaksin Menggunakan PLTS Pada Puskesmas Sindangbarang Bogor Hasna Satya Dini; Muhamamd Imbarothur Mowaviq; Sugeng Purwanto; Andi Junaidi; Pawenary Pawenary; Sofitri Rahayu
Terang Vol 4 No 1 (2021): TERANG : Jurnal Pengabdian Pada Masyarakat Menerangi Negeri
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33322/terang.v4i1.1373

Abstract

The temperature stability of the vaccine needs to be designed in such a way as to maintain its quality. Where vaccines are generally placed in a special refrigerator with an internal temperature of around +20C - +80C. The condition of the electricity network in the Bogor area, which sometimes goes out for a long time can cause electricity to not be supplied for vaccine refrigerators. For a long period of time, this condition can cause damage to the vaccine so that it cannot be given to toddlers. This activity is the application of technology that is very useful for the people of the Bogor, especially for the Sindangbarang Health Center in Bogor related to the design of power reserves, especially for vaccine refrigerators. This power backup system uses various equipment with appropriate technology such as Automatic Transfer Switch (ATS), solar panels, inverters, batteries, solar charge controllers and other supporting equipment. This PKM program has a focus on managing backup power systems in vaccine cabinets using solar power plants