Hendry Hendry
Fak Teknik, Unika Santo Thomas

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Perencanaan Hidrolis Pintu Pada Bangunan Pengambilan Air (Intake) Binsar Silitonga; Hendry Hendry
Jurnal Rekayasa Konstruksi Mekanika Sipil Vol 1 No 2 (2018): Volume 1 Nomor 2 Tahun 2018
Publisher : Fakultas Teknik Universitas Katolik Santo Thomas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (897.154 KB) | DOI: 10.54367/jrkms.v1i2.282

Abstract

The planning process of an intake water building must be conducted properly, such by considering several aspects namely topography, hydro-climatology, and also hydraulic condition of existing stream. In the planning of intake water building, the dimensions of water gate are based on the existing weir building. The Existing Dam building in this study is Sei Bingei weir. This weir was constructed to detain the flow of Bingei River. The weir is used to collect water to fill the demand of water company (PAM) Tirta Sari Binjai City.