Estimasi Kelayakan Penambangan Bijih Timah Blok Kemingking, Desa Kemingking, Kecamatan Sungai Selan PT Mitra Stania Prima Yuli Daryono; Mardiah Mardiah; Janiar Pitulima
MINERAL Vol 1 No 1 (2016): Mineral
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (364.326 KB) | DOI: 10.33019/mineral.v1i1.1602

Abstract

The mining industry is in need of a good planning so that the planned production targets can beachieved at minimum cost and revenue optimally, and can generate cash flow that will maximizerevenue each year over the life of the mine took place. Tin ore mining economic studies based onthe technical design data, so that the determination of the cost will be considered by the company.Components of the economic study of tin ore mining in terms of costing, revenue from the sale ofproducts, the calculation of cash flow, net present value, internal rate of return, payback period,sensitive analysis. Based on the results of studies on tin ore mine PT Mitra Stania Prima BlockKemingking acquired total reserves of tin ore amounted to 2.801,531 tons, by applying the method ofmining Open Pit Mining. From the economic feasibility calculations assuming the bank rate of 12%was obtained net present value of Rp 11.810.941.184.00, internal rate of return of 19.04%, and apayback period of 4.78 months for 2 years. Based on these results the project of PT Mitra StaniaPrima Block Kemingking feasible to continue.
Kajian Teknis Sistem Penerisan Tambang Di Front 2 TB 2.2 Tempilang Bangka Mitra PT Timah (Persero) Tbk Ines Yuana; E.P.S.B Taman Tono; Janiar Pitulima
MINERAL Vol 1 No 1 (2016): Mineral
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (454.242 KB) | DOI: 10.33019/mineral.v1i1.1603

Abstract

Tin ore mining activities in Front 2 of 2.2 Tempilang Large Mine was operated by business partnerof PT Timah (Persero) Tbk, PT Bahtera Sarindo Utama used Open Pit Mining Method with mechanicalsystems. Open Pit Mining Method would eventually form a large basin, so that would become a placefor air accumulation at the base of mine site, applied drainage system used Repressive KuruativeDrainage System by allowing water to pour into the mine and then concentrated on the front sump andthey would be removed from the mine using pumping systems. Rainfall data used included amaximum rainfall data with period of 2005-2014, the calculation of rainfall plans used Gumbeldistribution and calculation of rainfall intensity with Mononobe Equation, but for the period of rain istaken with the 2-year period. From the research, the existing sump had capability to retain water with avolume of 79.5 m3 and existing pumps had the capacity of 86.4 m3/h, while the total water poured inthe mine was 2172.588 m3/day with total of catchman area was 64085.442 m2. To improve drainagesystem performance on Front 2 of 2.2 Tempilang Large Mine, dimensional sump need to be repairedwith a capacity of 1267.336 m3 to bring outwater volume plan outside of work time (14 hours) and analternative pump was add 1 unit of recommendation pump with the same type such as Mitshubisi6D16 gravel pump (engine) with a pump capacity of 154.8 m3/h, but the actual pump was still beingused so that with the use of two unit pump acquired total pump capacity was 241.2 m3/h with thelifetime of pumping was 9 hours to remove the water 2172.588 m3/per day.
EVALUASI KEMAMPUAN PRODUKSI ALAT GALI-MUAT DAN ALAT ANGKUT GUNA MENCAPAI TARGET PRODUKSI BATUBARA 180.000 TON BULAN OKTOBER 2015 DI PIT LIMOA TAMBANG AIR LAYA EXTENTIONTIMUR PT BUKIT ASAM (PERSERO)TBK UPTE Maria Jeane Inggrid; E.P.S.B Taman Tono; Janiar Pitulima
MINERAL Vol 1 No 1 (2016): Mineral
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (460.47 KB) | DOI: 10.33019/mineral.v1i1.1609

Abstract

Eastern Extension of Pit Air Laya Limoa Mine was one of Air Laya Mine site that has coal miningbusiness license owned by PT Bukit Asam (Persero) Tbk. Excavator and truck method were applied inthat mine site. Mechanical equipments used in this site were 1 unit of Komatsu PC 800 SE Excavatorand 6 units of HINO LM 500 Dump Truck. Coal production target in Eastern Extension of Pit Air LayaLimoa Mine in October 2015 was 180.000 ton, but the production capacity of load haul equipment was157.179,39 ton with the work time efficiency at 14,07 hour/day and load haul equipment productiononly 129.245,20 ton with the work time efficiency at 13,97 hour/day. Therefore, evaluation wasnecessary throughout factors affecting working performance of mechanical equipment to achieve thetarget. Evaluation in achieving the target of coal production was conducted by calculating theproductivity, work efficiency and match factor. The data required to obtain these values includedequipment cycle time, the effective work time effeciency, the amount of bucket loading, density andcoal swell factor. Then the data was processed by using formula of mechanical soil removal andanalyzed based on literature related to the issue. After the evaluation of factors affectingperformance of mechanical equipments then work time effeciency corrected to be 15,61 hours/dayand additional of 6 to 7 unit of conveyance. There were changes in work time effeciency between loadhaul equipments and conveyance from 0,83 to 0,97. Production capabilities generated load haulequipment after being evaluated was 192.291,14 tons and production capabilities of conveyances,after the evaluation amounted to 188.236,03 tons.
Analisis Pengaruh Perubahan Nilai Total Moisture Dan Ash Content Terhadap Nilai Kalori Batubara Di Unit Pelabuhan Pt Bukit Asam Tbk Tarahan Bandar Lampung Alldino Hernanto; Janiar Pitulima; Delita Ega Andini
MINERAL Vol 5 No 1 (2020): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (722.586 KB) | DOI: 10.33019/mineral.v5i1.3053

Abstract

The coal industry emphasizes the quality of coal because quality will always be directly related to consumers and the company's revenue because the higher the quality of coal, the more expensive the selling price of coal, therefore this research was conducted to determine the difference in coal quality in railroad cars (demolition) and when analyzing for stockpile, the effect of total moisture and ash content on coal calories and the factors causing these changes. In this study, qualitative and quantitative methods were used where the steps taken in this research were sampling in the railroad car and in the stockpile and then using the proximate analysis and analysis of coal calories from the analysis and correlation and regression analysis to determine the effect of total moisture and ash content. against coal calories. The proximate analysis of the coal samples is disassembly total moisture which is 8.49% ar, in the stockpile, which is 10.32 % ar ash content demolition which is 5.37, in the stockpile which is 8.62 % ar and the calorific value of demolition is 7181 cal/gr, in the stockpile that is 6800 kal / gr so that each of the total moisture parameters, ash content and calorific value changes by 1.40 % ar, at 3.25 % ar, and by 400 Kal / gr. Based on the regression results, the total effect of total moisture and ash content on the first calorie each increase of 1 % ar the total moisture value will reduce calories by 123.36 cal/gr, each increase of 1 % ar the value of ash content will reduce coal calorific value by 78.76 cal/gr. The change in value is due to the occurrence of contamination in the stockpile area, the occurrence of swabakar in the stockpile, and the influence of high rainfall on coal
Kajian Teknis dan Biaya Kegiatan Rehandling Batubara PT Bukit Asam Tbk Tanjung Enim Sumatera Selatan Rahmad Tanjung; Janiar Pitulima; Delita Ega Andini
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (649.221 KB) | DOI: 10.33019/mineral.v6i1.3080

Abstract

The East Block Muara Tiga Besar Utara mining system uses Shovel and Trucks where the digging stage uses excavators and bulldozers and the transport stage uses a dump truck. Coal production target of Muara Tiga Besar Utara Block Timur in July is 300,000 tons and August is 294,000 tons. The method used in this research is quantitative data analysis method by calculating the productivity of digging and transporting tools, analyzing the technical implementation of coal rehandling activities and analyzing the cost of coal production and rehandling activities. The results of this study obtained the productivity of PC 400 Lc excavator304.35 tons/hour, bulldozer D 375A of 674.61 tons/hour and Hino FM 320FI dump truck equipment of 37.06 tons/hour, the cost of coal production in July is IDR 13,772,009,648.00, in August IDR 13,495,592,315.10 and the cost of coal rehandling activities is IDR 160,685,158.30/month. Based on the cost of coal production and the cost of coal rehandling activities, it can be analyzed that there was a decrease in production costs between July and August due to a decrease in mining production targets in anticipation of coal rehandling activities.
Evaluasi Geometri Jalan Tambang Di PT Vitrama Properti Desa Air Mesu Kabupaten Bangka Tengah Selvira Oktaviani; Janiar Pitulima; Haslen Oktarianty
MINERAL Vol 6 No 2 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (492.561 KB) | DOI: 10.33019/mineral.v6i2.3089

Abstract

PT Vitrama Properti is a company engaged in mining sector that utilizes natural resources of granite. The condition of mine road at PT Vitrama Properti is not good, causing the lack of transportation productivity in the transportation process. This study aims to evaluate the geometry of the mine road. The method is terrestrial method. Data that obtained are data on straight road width, road width at bends, height differences and bend radius to evaluated with AASHTO. The smallest of road width is 4.67 m, the road width on the smallest bend is 5.8 m, the smallest height difference value is 0.9 m and the smallest radius of bend is 7.695 m. The evaluation results are the width of the haul road on a straight single lane minimum is 6.6 m, the width of the haul road on a straight two-lane minimum is 11.55 m, the width of haul road in two lines minimum bend is 16.485 m, the maximum slope of road is 10%, the superelevation is 4%, and the cross slope is 33 cm.
Kajian Perolehan Hasil Bijih Timah Berdasarkan Ukuran Butir Terhadap Variabel Magnetic Separator Skala Laboratorium Muhammad Rizki Pratama; Janiar Pitulima; E.P.S.B Taman Tono
MINERAL Vol 6 No 2 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (311.37 KB) | DOI: 10.33019/mineral.v6i2.3093

Abstract

Industrial-scale Magnetic Separator is used to process tin ore by separating magnetic and nonmagnetic minerals using a belt conveyor speed and splitter opening only one variation. Based on this, this research is intended to obtain a more varied and optimal combination of variable settings in the recovery of tin ore yields. The method used is quantitative data analysis method by obtaining nonmagnetic minerals using a combination of splitter openings and belt conveyor speed based on grain size, calculating the content of tin ore in non-magnetic minerals using the Grain Counting Analysis method and calculating the composition of tin ore recovery. The research was conducted based on grain sizes of 60 mesh, 80 mesh, and 120 mesh using a combination of splitter opening sizes of 0.2 cm, 0.4 cm, and 0.6 cm and using a belt conveyor speed of 27.12 cm/s, 28.15 cm/s, and 28.40 cm/s. The sample used for each grain size is 9,000 grams with repetition for each combination of variables, namely 30 times. The results of this study obtained the highest yield of tin ore at grain size of 80 mesh as much as 1,753.7 grams in 8,920.3 grams of non-magnetic minerals with tin ore grades of 19.66% using a combination of speed 27.12 cm/s and splitter opening 0.2 cm. Based on the results of the study, the tin ore contained in the non-magnetic material processed by the Magnetic Separator, the grain size of 80 mesh is higher than that contained in the grain size of 60 mesh, while the grain size is finer than 80 mesh, the lower the recovery of tin ore contained in the non-magnetic material. Meanwhile, the larger the splitter opening and the speed of the conveyor belt, the higher the nonmagnetic minerals obtained.
Kajian Teknis Pengaruh Variabel Shaking Table Terhadap Peningkatan Kadar dan Recovery Pencucian Bijih Timah Unit di Unit Metalurgi PT Timah Tbk Novrida Siregar; Janiar Pitulima; Haslen Oktarianty
MINERAL Vol 7 No 1 (2022): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v7i1.3332

Abstract

The Mineral Processing Sector (BPM) is a place for processing precious tin minerals with other associated minerals. This research was conducted because the tin content in table water as feed in processing is still quite economical, namely 9.64% Sn and the minimum level that must be achieved as smelting feed is >60% Sn. The data collection method was carried out by conducting feed analysis with the GCA test to determine the levels and distribution of minerals in the feed. Furthermore, the shake table tool variations are adjusted such as stroke lengths of 15 mm, 22 mm, 10 mm with a sample result of 9 samples and the speed of air flow over the table is carried out as many as 3 variations, namely 0.025 m/s, 0.011 m/s, 0.014 m/s with results of 9 samples. Then the combination of the two variables was carried out with the results of 27 samples. The results of the GCA analysis were carried out to see the effect on levels and recovery. The results of the combination of stroke length and water flow velocity were the most optimal in combination with a stroke length of 15 mm and a water flow velocity of 0.025 m/s resulting in a concentrate of 58.44% Sn, moderately 6.26% Sn, and tailings 2.72% Sn as well as recovery. by 58.49%.
Potensial Mineral Kasiterit Pada Tailing Penambangan Timah Daerah Parit Tiga Kabupaten Bangka Selatan Rezky Dwi Aditya; Irvani Irvani; Janiar Pitulima
MINERAL Vol 7 No 1 (2022): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v7i1.3334

Abstract

Unconventional tin mining in Parit Tiga Village, Toboali District, South Bangka Regency is one of the mining sites that is rampantly carried out by the community. The problems that arise from the activities carried out by the community indicate that tin minerals in that location still have the potential to be mined at the conventional mining scale, this condition makes researchers want to study how much potential Sn levels are still contained even though the location is in the form of tailings. Data collection was 16 points at the first tailings location with an area of 160.000 m2 and 15 points at the second tailings location with an area of 150.000 m2. The samples were taken regularly with a distance between samples of 100 meters with a depth of 1,5 meters. Tailings samples were then tested using a microscope overview analysis method to obtain cassiterite levels. The results showed that the study area had 201.15 tons of Cassiterite potential at the first location and 300 tons at the second location to be studied further in terms of its economics.
Penilaian Tingkat Kestabilan Lereng De ngan Metode Slope Mass Rating (SMR) pada Bench S dan J PT Tanjung Bukit Nunggal Kabupaten Bangka Tengah Evrantino Insani Sitohang; Janiar Pitulima; Haslen Oktarianty
MINERAL Vol 7 No 1 (2022): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v7i1.3335

Abstract

Excavation activities on mining activities cause tension changes on the ground that trigger the occurrence of deformation then followed by changes in slope stability. If slope stability is impaired then it will lead to the possibility of an avalanche, this will certainly result in the disruption of mining activities that endanger workers who are on the slope area with potential for avalanches. This study aims to find out parameters of basic RMR and deflection values of basic RMR at bench S and J, find out the values of slope stability using SMR at bench S and J, and cope with slope instability based on SMR values. The methods used in this study are quantitative and qualitative methods namely scanline sampling and rock physical test that is Uniaxial Compressive Strenght (UCS) tests, and Rock Quality Designation (RQD) measurements. The results of this study show that the rock conditions at the bench S and J are still good with RMR values of approximately 71 ± 73, the probability of avalanche occurrence is very low as SMR values range 71 ± 73, but still it needs to be carried out cutting on blocks indicated to ruins.