p-Index From 2019 - 2024
0.408
P-Index
This Author published in this journals
All Journal U Karst
Rekso Ajiono
Fakultas Teknik Universitas Kadiri

Published : 6 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 6 Documents
Search

PENGENDALIAN BIAYA DAN JADUAL TERPADU PADA PROYEK KONSTRUKSI Ahmad Ridwan; Rekso Ajiono
U Karst Vol 1, No 1 (2017): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (482.575 KB) | DOI: 10.30737/ukarst.v1i1.84

Abstract

The main resources limited to the stage of implementing a construction project are cost, quality and time. Planning, scheduling and controlling are important steps to take in order to achieve the project's objectives with limited resources. The "Eaned Value" method is a method of control used to control project costs and schedules in an integrated manner. This method provides information on the status of project performance in a reporting period and provides information on the predicted costs required and time to complete all work based on performance indicators when reporting. In the Construction of the Hospital Medical Rehabilitation Installation Building. Overview of Kediri, the information obtained when reporting on the 91st day was Planed Value / PV = Rp 1.4325 billion, Earned Value / EV = Rp.1,3747 and Actual Cost / AC=Rp.1,3598 billion. At present the project performance in terms of cost is said to be profitable (Cost Variant / CV = + Rp. 0.01 billion and Cost Performed Index / CPI = 1.01> 1). From the schedule aspect, it is said that this project is experiencing delays (Schedule Variant / SV = -Rp.0.06 billion and Schedule Performance Index / SPI = 0.96 <1). The predicted cost needed to complete all work is Rp. 2.8683 billion, showing a profit (under a budget plan of Rp. 2.8998 billion). While the prediction schedule required 129 days, showed experiencing a delay of 2 days from the plan.AbstrakSumberdaya utama terbatas pada tahap pelaksanaan suatu proyek kostruksi adalah biaya, mutu dan waktu. Perencanaan, penjadualan dan pengendalian adalah langkah penting untuk dilakukan agar tujuan pelaksanaan proyek dengan sumberdaya terbatas ini tercapai. Metode ”Nilai Hasil” (Eaned Value) adalah sutau metode pengendalian yang digunakan untuk mengendalikan biaya dan jadual proyek secara terpadu. Metode ini memberikan informasi status kinerja proyek pada suatu periode pelaporan dan memberikan informasi prediksi biaya yang dibutuhkan dan waktu untuk penyelesaian seluruh pekerjaan berdasarkan indikator kinerja saat pelaporan. Pada Pembangunan Gedung Instalasi Rehabilitasi Medik RS. Gambiran Kediri, informasi yang didapat saat pelaporan pada hari ke-91 adalah Planed Value/ PV=Rp 1,4325 milyar, Earned Value/ EV=Rp.1,3747 dan Actual Cost /AC=Rp.1,3598 milyar. Pada saat ini kinerja proyek dari aspek biaya dikatakan untung (Cost Varian/ CV= + Rp. 0.01 milyar dan Cost Performed Index /CPI=1,01>1). Dari aspek jadual, dikatakan proyek ini mengalami keterlambatan (Schedule Varian /SV= -Rp.0,06 milyar dan Schedule Performance Indek/SPI=0,96 <1). Prediksi biaya yang diperlukan untuk menyelesaikan seluruh pekerjaan adalah Rp. 2,8683 milyar, menunjukkan mendapat keuntungan (dibawah rencana anggaran Rp. 2,8998 milyar). Sedangkan prediksi jadual yang diperlukan 129 hari, menunjukkan mengalami keterlambatan 2 hari dari rencana.
STABILITAS STRUKTUR TANAH JENIS EKSPANSIF MENGGUNAKAN KOMBINASI ABU DAUN Rekso Ajiono; Herlan Pratikto
U Karst Vol 3, No 2 (2019): NOVEMBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (7089.156 KB) | DOI: 10.30737/ukarst.v3i2.477

Abstract

In the field of land construction is a core foothold of a building. Soil structure which contains mostly clay in its components is Monmorillonite. The level of soil stability that is Montmorillonite is somewhat less good for the support of building infrastructure. The method for soil stability in the following research is to use leaf ash in addition to variations of 5%, 10%, 15%, and 20% by conducting a Water Content test and gradation test on the original soil structure used as a research sample. the beautiful town of Kediri which is Montmorillonite. The soil stability test is to use montmorillonite soil mix specimens with leaf ash by carrying out tests of Content Weight, Atterberg Limit and Proctor. The results of the original soil structure research were categorized momoroillonite and after adding coffee grounds in addition to the maximum variation of 20%, the Liquid Limit value increased to 43% and the Plastic Limit value increased to 31.64% so that the plastic index could increase to 11.36 %. When compaction test with perfect solid specimens, the original dry soil volume weight of 6.72 gr / cm3 and after adding leaf ash by 20% increased the dry volume weight to 10.56 gr / cm3.Keywords: Soil, Leaf Ash, Soil StabilityDi bidang konstruksi tanah adalah pijakan inti sebuah bangunan. Struktur tanah yang mengandung sebagian besar tanah liat dalam komponennya adalah Monmorillonit. Tingkat stabilitas tanah yaitu Montmorillonite agak kurang baik untuk mendukung pembangunan infrastruktur. Metode untuk stabilitas tanah dalam penelitian berikut adalah dengan menggunakan abu daun selain variasi 5%, 10%, 15%, dan 20% dengan melakukan tes Kadar Air dan uji gradasi pada struktur tanah asli yang digunakan sebagai sampel penelitian. . kota Kediri yang indah yaitu Montmorillonite. Uji stabilitas tanah menggunakan spesimen campuran tanah montmorillonit dengan abu daun dengan melakukan uji Berat Konten, Batas Atterberg dan Proctor. Hasil penelitian struktur tanah asli dikategorikan momoroillonit dan setelah menambahkan ampas kopi di samping variasi maksimum 20%, nilai Batas Cair meningkat menjadi 43% dan nilai Batas Plastik meningkat menjadi 31,64% sehingga indeks plastik dapat meningkat hingga 11,36%. Ketika pengujian pemadatan dengan spesimen padat sempurna, berat volume tanah kering asli 6,72 gr / cm3 dan setelah menambahkan abu daun sebesar 20% meningkatkan berat volume kering menjadi 10,56 gr / cm3.Kata Kunci: Tanah, Abu Daun, Stabilitas Tanah
ANALISIS FAKTOR RISIKO PENAWARAN DI BAWAH ESTIMASI TERHADAP KINERJA KUALITAS PROYEK KONSTRUKSI BANGUNAN DI KOTA TRENGGALEK JAWA TIMUR Rekso Ajiono; Heri Wahyudiono
U Karst Vol 2, No 2 (2018): NOVEMBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (280.469 KB) | DOI: 10.30737/ukarst.v2i2.373

Abstract

A plan  will correct delays in  planning and  control is  not  done properly. Various things can  occur in  a construction project that can lead to increased processing time so that the project becomes hampered. The purpose of the research is to discuss and classify the factors that cause delays in the implementation of development projects in the Trenggalek Regency and to accept factors of delay related to the use of costs. This data processing uses the SPSS (Statistical Product and Service Solution) computer program version 17.00. The data analysis technique uses validity, reliability, factor analysis, classical assumption and multiple linear regression.The results of the study are 3 new factors obtained from the extraction of factor analysis are: Changes in scope and employment documents (Xb1), Coordination and transportation of resources and expertise of manpower (Xb2), Evaluation and planning systems (Xb3) and produce one model of equation multiple linear to explain the relationship of the three factors above with costs. Keywords: Engineer, SPSS, Heteroscedasticity and Normality. Sebuah rencana akan memperbaiki keterlambatan dalam perencanaan dan kontrol tidak dilakukan dengan benar. Berbagai hal dapat terjadi dalam proyek konstruksi yang dapat menyebabkan peningkatan waktu pemrosesan sehingga proyek menjadi terhambat. Tujuan dari penelitian ini adalah untuk membahas dan mengklasifikasikan faktor-faktor yang menyebabkan keterlambatan dalam pelaksanaan proyek-proyek pembangunan di Kabupaten Trenggalek dan untuk menerima faktor keterlambatan terkait dengan penggunaan biaya. Pemrosesan data ini menggunakan program komputer SPSS (Produk Statistik dan Solusi Layanan) versi 17.00. Teknik analisis data menggunakan validitas, reliabilitas, analisis faktor, asumsi klasik, dan regresi linier berganda. Hasil penelitian ini adalah 3 faktor baru yang diperoleh dari ekstraksi analisis faktor yaitu: Perubahan ruang lingkup dan dokumen pekerjaan (Xb1), Koordinasi dan transportasi sumber daya dan keahlian tenaga kerja (Xb2), Evaluasi dan sistem perencanaan (Xb3) dan menghasilkan satu model persamaan linear berganda untuk menjelaskan hubungan ketiga faktor di atas dengan biaya. Kata Kunci: Insinyur, SPSS, Heteroskedastisitas dan Normalitas
PENGENDALIAN BIAYA DAN JADUAL TERPADU PADA PROYEK KONSTRUKSI Ahmad Ridwan; Rekso Ajiono
U Karst Vol. 1 No. 1 (2017): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v1i1.84

Abstract

The main resources limited to the stage of implementing a construction project are cost, quality and time. Planning, scheduling and controlling are important steps to take in order to achieve the project's objectives with limited resources. The "Eaned Value" method is a method of control used to control project costs and schedules in an integrated manner. This method provides information on the status of project performance in a reporting period and provides information on the predicted costs required and time to complete all work based on performance indicators when reporting. In the Construction of the Hospital Medical Rehabilitation Installation Building. Overview of Kediri, the information obtained when reporting on the 91st day was Planed Value / PV = Rp 1.4325 billion, Earned Value / EV = Rp.1,3747 and Actual Cost / AC=Rp.1,3598 billion. At present the project performance in terms of cost is said to be profitable (Cost Variant / CV = + Rp. 0.01 billion and Cost Performed Index / CPI = 1.01> 1). From the schedule aspect, it is said that this project is experiencing delays (Schedule Variant / SV = -Rp.0.06 billion and Schedule Performance Index / SPI = 0.96 <1). The predicted cost needed to complete all work is Rp. 2.8683 billion, showing a profit (under a budget plan of Rp. 2.8998 billion). While the prediction schedule required 129 days, showed experiencing a delay of 2 days from the plan.AbstrakSumberdaya utama terbatas pada tahap pelaksanaan suatu proyek kostruksi adalah biaya, mutu dan waktu. Perencanaan, penjadualan dan pengendalian adalah langkah penting untuk dilakukan agar tujuan pelaksanaan proyek dengan sumberdaya terbatas ini tercapai. Metode ”Nilai Hasil” (Eaned Value) adalah sutau metode pengendalian yang digunakan untuk mengendalikan biaya dan jadual proyek secara terpadu. Metode ini memberikan informasi status kinerja proyek pada suatu periode pelaporan dan memberikan informasi prediksi biaya yang dibutuhkan dan waktu untuk penyelesaian seluruh pekerjaan berdasarkan indikator kinerja saat pelaporan. Pada Pembangunan Gedung Instalasi Rehabilitasi Medik RS. Gambiran Kediri, informasi yang didapat saat pelaporan pada hari ke-91 adalah Planed Value/ PV=Rp 1,4325 milyar, Earned Value/ EV=Rp.1,3747 dan Actual Cost /AC=Rp.1,3598 milyar. Pada saat ini kinerja proyek dari aspek biaya dikatakan untung (Cost Varian/ CV= + Rp. 0.01 milyar dan Cost Performed Index /CPI=1,01>1). Dari aspek jadual, dikatakan proyek ini mengalami keterlambatan (Schedule Varian /SV= -Rp.0,06 milyar dan Schedule Performance Indek/SPI=0,96 <1). Prediksi biaya yang diperlukan untuk menyelesaikan seluruh pekerjaan adalah Rp. 2,8683 milyar, menunjukkan mendapat keuntungan (dibawah rencana anggaran Rp. 2,8998 milyar). Sedangkan prediksi jadual yang diperlukan 129 hari, menunjukkan mengalami keterlambatan 2 hari dari rencana.
ANALISIS FAKTOR RISIKO PENAWARAN DI BAWAH ESTIMASI TERHADAP KINERJA KUALITAS PROYEK KONSTRUKSI BANGUNAN DI KOTA TRENGGALEK JAWA TIMUR Rekso Ajiono; Heri Wahyudiono
U Karst Vol. 2 No. 2 (2018): NOVEMBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i2.373

Abstract

A plan  will correct delays in  planning and  control is  not  done properly. Various things can  occur in  a construction project that can lead to increased processing time so that the project becomes hampered. The purpose of the research is to discuss and classify the factors that cause delays in the implementation of development projects in the Trenggalek Regency and to accept factors of delay related to the use of costs. This data processing uses the SPSS (Statistical Product and Service Solution) computer program version 17.00. The data analysis technique uses validity, reliability, factor analysis, classical assumption and multiple linear regression.The results of the study are 3 new factors obtained from the extraction of factor analysis are: Changes in scope and employment documents (Xb1), Coordination and transportation of resources and expertise of manpower (Xb2), Evaluation and planning systems (Xb3) and produce one model of equation multiple linear to explain the relationship of the three factors above with costs. Keywords: Engineer, SPSS, Heteroscedasticity and Normality. Sebuah rencana akan memperbaiki keterlambatan dalam perencanaan dan kontrol tidak dilakukan dengan benar. Berbagai hal dapat terjadi dalam proyek konstruksi yang dapat menyebabkan peningkatan waktu pemrosesan sehingga proyek menjadi terhambat. Tujuan dari penelitian ini adalah untuk membahas dan mengklasifikasikan faktor-faktor yang menyebabkan keterlambatan dalam pelaksanaan proyek-proyek pembangunan di Kabupaten Trenggalek dan untuk menerima faktor keterlambatan terkait dengan penggunaan biaya. Pemrosesan data ini menggunakan program komputer SPSS (Produk Statistik dan Solusi Layanan) versi 17.00. Teknik analisis data menggunakan validitas, reliabilitas, analisis faktor, asumsi klasik, dan regresi linier berganda. Hasil penelitian ini adalah 3 faktor baru yang diperoleh dari ekstraksi analisis faktor yaitu: Perubahan ruang lingkup dan dokumen pekerjaan (Xb1), Koordinasi dan transportasi sumber daya dan keahlian tenaga kerja (Xb2), Evaluasi dan sistem perencanaan (Xb3) dan menghasilkan satu model persamaan linear berganda untuk menjelaskan hubungan ketiga faktor di atas dengan biaya. Kata Kunci: Insinyur, SPSS, Heteroskedastisitas dan Normalitas
STABILITAS STRUKTUR TANAH JENIS EKSPANSIF MENGGUNAKAN KOMBINASI ABU DAUN Rekso Ajiono; Herlan Pratikto
U Karst Vol. 3 No. 2 (2019): NOVEMBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v3i2.477

Abstract

In the field of land construction is a core foothold of a building. Soil structure which contains mostly clay in its components is Monmorillonite. The level of soil stability that is Montmorillonite is somewhat less good for the support of building infrastructure. The method for soil stability in the following research is to use leaf ash in addition to variations of 5%, 10%, 15%, and 20% by conducting a Water Content test and gradation test on the original soil structure used as a research sample. the beautiful town of Kediri which is Montmorillonite. The soil stability test is to use montmorillonite soil mix specimens with leaf ash by carrying out tests of Content Weight, Atterberg Limit and Proctor. The results of the original soil structure research were categorized momoroillonite and after adding coffee grounds in addition to the maximum variation of 20%, the Liquid Limit value increased to 43% and the Plastic Limit value increased to 31.64% so that the plastic index could increase to 11.36 %. When compaction test with perfect solid specimens, the original dry soil volume weight of 6.72 gr / cm3 and after adding leaf ash by 20% increased the dry volume weight to 10.56 gr / cm3.Keywords: Soil, Leaf Ash, Soil StabilityDi bidang konstruksi tanah adalah pijakan inti sebuah bangunan. Struktur tanah yang mengandung sebagian besar tanah liat dalam komponennya adalah Monmorillonit. Tingkat stabilitas tanah yaitu Montmorillonite agak kurang baik untuk mendukung pembangunan infrastruktur. Metode untuk stabilitas tanah dalam penelitian berikut adalah dengan menggunakan abu daun selain variasi 5%, 10%, 15%, dan 20% dengan melakukan tes Kadar Air dan uji gradasi pada struktur tanah asli yang digunakan sebagai sampel penelitian. . kota Kediri yang indah yaitu Montmorillonite. Uji stabilitas tanah menggunakan spesimen campuran tanah montmorillonit dengan abu daun dengan melakukan uji Berat Konten, Batas Atterberg dan Proctor. Hasil penelitian struktur tanah asli dikategorikan momoroillonit dan setelah menambahkan ampas kopi di samping variasi maksimum 20%, nilai Batas Cair meningkat menjadi 43% dan nilai Batas Plastik meningkat menjadi 31,64% sehingga indeks plastik dapat meningkat hingga 11,36%. Ketika pengujian pemadatan dengan spesimen padat sempurna, berat volume tanah kering asli 6,72 gr / cm3 dan setelah menambahkan abu daun sebesar 20% meningkatkan berat volume kering menjadi 10,56 gr / cm3.Kata Kunci: Tanah, Abu Daun, Stabilitas Tanah