Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perencanaan Tempat Pengolahan Sampah 3R (Reduce Reuse Recycle) di Kecamatan Kesamben Kabupaten Jombang Nanda Henik Pratiwi; Yayok Suryo Purnomo; Tuhu Agung Rachmanto; Naniek Ratni Juliardi A.R
Al-Ard: Jurnal Teknik Lingkungan Vol. 8 No. 1 (2022): September
Publisher : Department of Environmental engineering, Faculty of Science and Technology, Islamic State University Sunan Ampel Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29080/alard.v8i1.1513

Abstract

The increase in the amount of waste coupled with the lack of waste management facilities, as well as the lack of knowledge and public awareness in managing waste causes the accumulation of waste to have an impact on environmental pollution. In the Kesamben sub-district, Jombang, there is no waste management facility, so people choose to do open burning, throw garbage on the side of the road, and even throw garbage directly into the river. From these problems, a TPS 3R was planned in Kesamben District. In planning the TPS 3R, population data and population projections, waste generation data, waste composition, waste generation projections and local area HSPK are required. Data collection on waste generation and composition was carried out by sampling at residents' homes. The results of the sampling obtained the weight of waste generation of 0.1393 kg/person/day with a waste volume of 0.0022 m3/person/day. The composition of the waste consists of organic waste, plastic, paper, cloth/textile, glass, Styrofoam, and diapers. With the percentage of waste composition, respectively, namely 64.55%; 19.7%; 8.49%; 1.71%; 0.41%; 0.75%; and 4.38%. From this data, a TPS 3R building is planned which can process waste up to a volume of 164.55 m3/day. Consists of a reception room, sorting room, inorganic waste storage room, plastic waste processing unit, organic waste processing unit, liquid organic fertilizer storage room, residual waste storage room, and supporting facilities. From the planning that has been done, it takes a budget plan of Rp2.052.524.176,35.
Analisis Timbulan dan Komposisi Sampah Domestik di Kecamatan Kesamben Kabupaten Jombang sebagai Dasar Perencanaan TPS 3R Yayok Suryo Purnomo; Nanda Henik Pratiwi
Prosiding ESEC Vol. 3 No. 1 (2022): Seminar Nasional (ESEC) 2022
Publisher : Prosiding ESEC

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The lack of waste management facilities coupled with the amount of waste generation that continues to increase along with the increase in population causes the accumulation of waste at several points in Kesamben District. Most of the people throw their garbage on the side of the road, in the river, or by burning. For this reason, it is necessary to analyze the generation and composition of waste in Kesamben District so that a waste management system can be carried out in accordance with the rules. The research was conducted by measuring waste generation directly from 26 sampling points throughout the Kesamben District. The waste generation sampling procedure was carried out based on SNI 19-3964-1994. From the sampling activity that has been carried out, the resulting solid waste generation is 0.1393 kg/person/day. While the results of the analysis of the composition of the waste showed the types of organic waste, plastic, paper, cloth/textile, glass, Styrofoam, and diapers. With the percentage of waste composition, respectively, that is 64.55%; 19.7%; 8.49%; 1.71%; 0.41%; 0.75%; and 4.38%. From these results it can be concluded that the composition of household waste is dominated by organic waste. So that people should be able to take advantage of composting technology to manage waste in their homes and sort out plastic waste to reduce the amount of waste generated.