Claim Missing Document
Check
Articles

Found 2 Documents
Search

PERENCANAAN,PENGAWASAN DAN EVALUASI SISTEM KENDALI PELAKSANAAN PROYEK BERBASIS PROTOKOL KESEHATAN COVID-19 BAGI TENAGA PROYEK DI DESA MEDANG, TANGERANG Nadia Diandra; Mulyadi Sugih Dharsono; Stephen Valentino
Prosiding Konferensi Nasional Pengabdian Kepada Masyarakat dan Corporate Social Responsibility (PKM-CSR) Vol 5 (2022): PERAN PERGURUAN TINGGI DAN DUNIA USAHA DALAM AKSELERASI PEMULIHAN DAMPAK PANDEMI
Publisher : Asosiasi Sinergi Pengabdi dan Pemberdaya Indonesia (ASPPI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37695/pkmcsr.v5i0.1748

Abstract

COVID-19 is a disease caused by the severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). COVID-19 can cause respiratory system disorders, ranging from mild symptoms such as flu to lung infections, such as pneumonia. To find out about the implementation of the COVID-19 Health protocol-based project for project workers in Desa Medang, Curug, Tangerang, it is necessary to directly supervise project personnel. The method used in the implementation of this community service activity is to identify, observe and study the construction process and the interactions of construction workers during the construction process by interviewing workers, especially field supervisors in Desa Medang, Curug, Tangerang regarding the COVID-19 Health protocol. Where it is hoped that direct interaction with construction workers can improve the project implementation control system based on the COVID-19 health protocol for project workers sustainably. The result of Community Service activities is the increased awareness of project workers in implementing the COVID-19 Health protocol, as well as the implementation of comprehensive Health protocol activities under established regulations. Keywords: COVID-19, Labor, Health Protocol
Pemodelan Estimasi Biaya Elemen Struktur Bangunan Rumah Toko Dengan Variasi Lebar Bentang Nadia Diandra; Stephen Valentino; Billy Chandra; Vincentius Hartanto
JOURNAL OF CIVIL ENGINEERING BUILDING AND TRANSPORTATION Vol. 7 No. 1 (2023): JCEBT MARET
Publisher : Universitas Medan Area

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31289/jcebt.v7i1.8582

Abstract

The development of construction will affect work methods in construction, design and materials. Changes in design, materials and work methods in the construction of a construction project will affect the costs that must be incurred by the owner and the time required to construct a building. Conceptual cost estimation is needed as a reference or guide in determining the policies used to determine the amount of investment that must be implemented. Planning is the initial stage in construction development activities. Effective and efficient project planning is needed in carrying out a project. Along with the need for efficiency, the cost estimation model at the early stages of project planning must be accurate so that the results can be accounted for. This study aims to obtain an estimate of the structural cost of a shop house building with several span variations. Variations in the width of the shop house are 5 m, 6.67 m and 8 m. The research results obtained that the cost of the structure on the 8 m span is Rp. 2,352,485,387, the 8 m span is the span that has the largest cost compared to other spans. The difference between the span of 8 m and the span of 6.67 m and 5 m is Rp. 93,480,110 and Rp. 13,740,263, respectively. Based on these results it was concluded that the larger the span, the greater the costs required. This is influenced because there are differences in the dimensions and specifications of the structures used in each span.