Claim Missing Document
Check
Articles

Found 2 Documents
Search

Identifikasi Waste pada Proses Remanufaktur Blade Lift Cylinder D-8R dengan Pendekatan Lean Manufacturing Darma Catur Kurniawan; Muqimuddin; Muhamad Imron Zamzani
JURNAL TEKNIK INDUSTRI Vol. 12 No. 2 (2022): VOLUME 12 NO 2 JULI 2022
Publisher : Jurusan Teknik Industri, Fakultas Teknologi Indusri Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/jti.v12i2.15641

Abstract

Intisari— Blade Lift Cylinder D-8R merupakan salah satu komponen hidrolik alat berat. Dampak dari banyaknya remanufaktur terhadap komponen blade lift cylinder D-8R ini menyebabkan leadtime pengiriman ke pelanggan menjadi lama. Hal ini akhirnya merugikan perusahaan dan juga pelanggan secara tidak langsung. Kajian awal mengungkapkan bahwa leadtime disebabkan oleh jumlah pemborosan (waste) pada proses produksi komponen blade lift cylinderD-8R. Adapun anlaisis terhadap pemborosan pada proses remanufaktur blade lift cylinder D-8R dapat menjadi strategi pilihan. Pada penelitian ini menggunakan lean manufacturing sebagai pendekatan analisis 7 pemborosan. Hasil penelitian menunjukan nilai Process Cycle Efficiency (PCE) Current Value Stream Mapping (CVSM) sebesar 30,4%, kemudian nilai PCE pada kondisi perbaikan Future Stream Mapping (FVSM) meningkat menjadi 84,6%. Dari hasil ini dapat diketahui adanya kenaikan sebesar 54,2%. Penurunan leadtime remanufaktur blade lift cylinder D-8R sekitar 10406 menit atau sekitar 63,9%. Dengan demikian, Pemborosan pada proses remanufaktur komponen blade lift cylinder D-8R dengan pendekatan Lean Manufacturing dapat diidentifikasi dan leadtime menurun lebih dari separuh leadtime pada kondisi awal. Abstract— Blade Lift Cylinder D-8R is one of the hydraulic components of heavy equipment. The impact of the many remanufacturing of the blade lift cylinder components of the D-8R causes long lead times for delivery to customers. This ultimately harms the company and also the customers indirectly. Preliminary studies reveal that leadtime is caused by the amount of waste in the production process of the blade lift cylinderD-8R component. The analysis of waste in the remanufacturing process of the D-8R blade lift cylinder can be the strategy of choice. In this study, lean manufacturing is used as a waste analysis approach. The results showed that the Process Cycle Efficiency (PCE) Current Value Stream Mapping (CVSM) was 30.4%, then the PCE value in the improved condition of Future Stream Mapping (FVSM) increased to 84.6%. From these results, it can be seen that there was an increase of 54.2%. The decrease in leadtime for remanufacturing the blade lift cylinder of the D-8R is about 10406 ​​minutes or about 63.9%. Thus, waste in the remanufacturing process of the blade lift cylinder component of the D-8R with the Lean Manufacturing approach can be identified and leadtime is reduced by more than half of the leadtime in the initial condition.
SAFE (SMART AND FUN EDUCATION) Aziza Nurul Izza; Budiani Fitria Endrawati; Darma Catur Kurniawan; Dhea Arfiria Dhayanty; Febriana Lepong Pabatek
Jurnal Pengabdian Kepada Masyarakat ITK (PIKAT) Vol. 1 No. 1 (2020): Jurnal Pengabdian Kepada Masyarakat
Publisher : LPPM Institut Teknologi Kalimantan

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (815.07 KB) | DOI: 10.35718/pikat.v1i1.292

Abstract

Pendidikan Bahasa Inggris perlu dipelajari sejak usia dini oleh anak-anak, karena anak-anak akan lebih cepat mengingat dan memahaminya. Tetapi anak-anak akan cenderung bosan jika sang guru menyampaikan materi pembelajaran dengan tidak menarik, sehingga anak-anak akan kesusahan dalam belajar. Dari kejadia tersebut maka dilakukan kegiatan pengajaran Bahasa Inggris dengan konsep Smart And Fun Education. Tujuan dari kegiatan ini selain memberikan motovasi kepada adik-adik yang berada di panti asuhan tersebut untuk semangat belajar Bahasa Inggris, juga sebagai bentuk kepedulian terhadap sesama manusia dengan memberikan donasi kepada pihak pengelola panti, serta mempererat tali persaudaraan. Metode yang digunakan ialah Membaca dan Games. Kegiatan pengabdian masyarakat dilaksanakan di Panti Asuhan Ummi Zahro pada tanggal 30 November 2019. Kegiatan ini dihadiri oleh kurang lebih 30 anak panti. Adapun hasil kegiatan pengabdian masyarakat tersebut dapat dijabarkan dengan analisis SWOT.Dengan analisis SWOT pada hasil kegiatan pengabdian di Panti Asuhan Ummi Zahro adalah sebagai alat strategi pengembangan bagi panti asuhan tersebut. Pada pelaksanaan anak-anak di Panti Asuhan Ummi Zahro berantusisas dengan metode ini sehingga mereka dapat Memahami dengan baik edukasi yang diberikan para pemateri.