OPTIMASI PENDANAAN PROYEK PEMBANGUNAN GEDUNG VELODROME DENGAN TEKNIK PEMROGRAMAN LINIER Arifin, Muhammad Faizal Ardhiansyah
Jurnal Teknik Sipil dan Perencanaan Vol 18, No 1 (2016): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The main resource in the execution of project to ensure the project goes according to the plan is the availability of funds that must be possessed by providers. The contract form and manner of payments made between service users and service providers during the implementation of the project would bring a significant impact for service providers to prepare a specific fun. Where funds provided will be used to maintain the condition projects cash flows remain positive or avoid a deficit. This study aims to inform the provider of construction services in the calculation of the most favorable providing funds where the payment method that is observed is a payment method payment stage. Sumber daya utama di dalam pelaksanaan proyek untuk menjamin proyek tersebut berjalan sesuai rencana adalah ketersediaan dana yang harus dimiliki oleh penyedia jasa. Bentuk kontrak dan cara pembayaran yang dilakukan antara pengguna jasa dan penyedia jasa pada saat pelaksanaan proyek akan membawa dampak yang cukup signifikan bagi penyedia jasa untuk menyiapkan sejumlah dana tertentu. Dimana dana yang disediakan tersebut akan dipergunakan untuk menjaga kondisi arus kas proyek tetap positif atau terhindar dari kondisi defisit. Penelitian ini bertujuan untuk memberi masukan bagi penyedia jasa konstruksi dalam melakukan perhitungan penyediaan dana yang paling menguntungkan dimana metode pembayaran yang diamati adalah metode pembayaran stage payment.
OPTIMASI PENDANAAN PROYEK PEMBANGUNAN GEDUNG VELODROME DENGAN TEKNIK PEMROGRAMAN LINIER Arifin, Muhammad Faizal Ardhiansyah
Jurnal Teknik Sipil dan Perencanaan Vol 18, No 1 (2016): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/jtsp.v18i1.6688

Abstract

The main resource in the execution of project to ensure the project goes according to the plan is the availability of funds that must be possessed by providers. The contract form and manner of payments made between service users and service providers during the implementation of the project would bring a significant impact for service providers to prepare a specific fun. Where funds provided will be used to maintain the condition project's cash flows remain positive or avoid a deficit. This study aims to inform the provider of construction services in the calculation of the most favorable providing funds where the payment method that is observed is a payment method payment stage. Sumber daya utama di dalam pelaksanaan proyek untuk menjamin proyek tersebut berjalan sesuai rencana adalah ketersediaan dana yang harus dimiliki oleh penyedia jasa. Bentuk kontrak dan cara pembayaran yang dilakukan antara pengguna jasa dan penyedia jasa pada saat pelaksanaan proyek akan membawa dampak yang cukup signifikan bagi penyedia jasa untuk menyiapkan sejumlah dana tertentu. Dimana dana yang disediakan tersebut akan dipergunakan untuk menjaga kondisi arus kas proyek tetap positif atau terhindar dari kondisi defisit. Penelitian ini bertujuan untuk memberi masukan bagi penyedia jasa konstruksi dalam melakukan perhitungan penyediaan dana yang paling menguntungkan dimana metode pembayaran yang diamati adalah metode pembayaran stage payment.
OPTIMASI PENDANAAN PROYEK PEMBANGUNAN GEDUNG VELODROME DENGAN TEKNIK PEMROGRAMAN LINIER Arifin, Muhammad Faizal Ardhiansyah
Jurnal Teknik Sipil dan Perencanaan Vol 18, No 1 (2016): Jurnal Teknik Sipil & Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/jtsp.v18i1.6688

Abstract

The main resource in the execution of project to ensure the project goes according to the plan is the availability of funds that must be possessed by providers. The contract form and manner of payments made between service users and service providers during the implementation of the project would bring a significant impact for service providers to prepare a specific fun. Where funds provided will be used to maintain the condition project's cash flows remain positive or avoid a deficit. This study aims to inform the provider of construction services in the calculation of the most favorable providing funds where the payment method that is observed is a payment method payment stage. Sumber daya utama di dalam pelaksanaan proyek untuk menjamin proyek tersebut berjalan sesuai rencana adalah ketersediaan dana yang harus dimiliki oleh penyedia jasa. Bentuk kontrak dan cara pembayaran yang dilakukan antara pengguna jasa dan penyedia jasa pada saat pelaksanaan proyek akan membawa dampak yang cukup signifikan bagi penyedia jasa untuk menyiapkan sejumlah dana tertentu. Dimana dana yang disediakan tersebut akan dipergunakan untuk menjaga kondisi arus kas proyek tetap positif atau terhindar dari kondisi defisit. Penelitian ini bertujuan untuk memberi masukan bagi penyedia jasa konstruksi dalam melakukan perhitungan penyediaan dana yang paling menguntungkan dimana metode pembayaran yang diamati adalah metode pembayaran stage payment.
Education Building Maintenance Priority Strategy Consider Safety Condition Using Analytical Hierarchy Process (AHP) Arifin, Muhammad Faizal Ardhiansyah; Aditya, Yoga; Budiwirawan, Agung; Sutarto, Agung; Taveriyanto, Arie
Jurnal Teknik Sipil dan Perencanaan Vol 24, No 1 (2022): Jurnal Teknik Sipil dan Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/jtsp.v24i1.35980

Abstract

Abstract. Buildings with component degradation are a common challenge for all construction companies across the world. There are various building's components that it is challenging for construction companies to manage them all at once. It was not considered that the building agency is responsible for more than one building at a time. These issues have gotten more complicated as a result of the building agencies' limited financial resources for building maintenance. This study attempts to provide a visible solution to manage the building maintenance strategy based on complex building maintenance problems. The Analytical Hierarchy Process was used to give a complete way for assessing the building's condition (AHP). This method developed in this study was applied to define the building condition and followed by determining the building priority to be maintained. The building component in this study was specified into three specific components such as interior, exterior, and building utility. To complete this method, a three-level priority factor was determined with consideration from the safety factor follow by the functionality factor, dan the last is an esthetic factor. The developed model shows a proper and reliable solution related to the degradation of building components and their functionalities.