Cut Zukhrina Oktavani
Program Studi Teknik Sipil, Universitas Syiah Kuala

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

KEPENTINGAN RELATIF FAKTOR-FAKTOR INTEGRASI MANAJEMEN KOMUNIKASI PADA PROYEK KONSTRUKSI DI BANDA ACEH Dinda Rizka Ibdayanti; Cut Zukhrina Oktavani; Saiful Husin
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.20781

Abstract

Ineffective communication can lead to work delays, quality discrepancies, and cost overruns. Thus, effective communication is needed to support the success of construction projects. Poor communication is one of the causes of project failure with a percentage of 56%. On the other hand, effective communication is considered to increase the suitability of the plan in project completion by up to 17%. Communication is a core competency that must be implemented properly in order to achieve the same strategy, goals, and actions. The purpose of this study was to determine the relative importance of communication management integration factors in construction projects based on the Relative Importance Index (RII) analysis. RII analysis will sort the importance of factors based on the highest to lowest RII values. Data was collected by distributing questionnaires to project managers from large and medium qualified contractors in Banda Aceh City. The results of data analysis obtained 3 important factors to integrate communication management in construction projects, i.e.: competence (0.938); management (0.922); and strategy (0.911). If viewed from the sub-factors, there was 5 important sub-factors to integrate communication management in construction projects, i.e.: skill (0.958); attitude (0.950); task clarity (0.942); stakeholder involvement (0.933); and knowledge (0.925). Abstrak Komunikasi yang tidak efektif dapat menyebabkan keterlambatan pekerjaan, ketidaksesuaian mutu, dan kelebihan biaya. Sehingga, diperlukan komunikasi yang efektif sebagai penunjang keberhasilan proyek konstruksi. Komunikasi yang buruk menjadi salah satu penyebab kegagalan proyek dengan persentase sebesar 56%. Sebaliknya, komunikasi yang efektif dinilai dapat meningkatkan kesesuaian rencana dalam penyelesaian proyek hingga 17%. Komunikasi menjadi kompetensi inti yang harus dilaksanakan dengan baik agar dapat mencapai strategi, tujuan, dan tindakan yang sama. Tujuan dari penelitian ini adalah mengetahui kepentingan relatif faktor -faktor integrasi manajemen komunikasi pada proyek konstruksi berdasarkan analisis Relative Importance Index (RII). Analisis RII akan mengurutkan kepentingan faktor berdasarkan nilai RII tertinggi sampai terendah. Pengumpulan data dilakukan dengan penyebaran kuesioner kepada manajer proyek dari kontraktor kualifikasi besar dan menengah di Kota Banda Aceh. Hasil analisis data diperoleh 3 faktor penting untuk mengintegrasikan manajemen komunikasi pada proyek konstruksi, yaitu: kompetensi (0,938); manajemen (0,922); dan strategi (0,911). Jika ditinjau dari subfaktor terdapat 5 subfaktor penting untuk mengintegrasikan manajemen komunikasi pada proyek konstruksi, yaitu: skill (0,958); attitude (0,950); kejelasan tugas (0,942); keterlibatan stakeholders (0,933); dan knowledge (0,925).
ANALISIS INDIKATOR PENILAIAN PRODUKTIVITAS TENAGA KERJA KONSTRUKSI GEDUNG DI KOTA BANDA ACEH Malia Urrahmi; Cut Zukhrina Oktavani; Mubarak
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.20803

Abstract

The implementation of construction projects is required to produce good quality with the planned time. Thus, high productivity is needed so that construction projects do not experience delays. One of the resources defined as input in productivity and very influential in the project is labor, which is one of the important factors in supporting the quality and success of a construction project. The purpose of this study to identify indicators that affect labor productivity in building construction projects. This research uses mixed methods (mixed methods). The data collection method used is the distribution of questionnaires. The data obtained were analyzed using the Relative Importance Index (RII) method. The results of the RII obtained 12 (twelve) main indicators of labor productivity in building construction projects in Banda Aceh City, namely, clear duties and authorities (0.975); effective communication in the field (0.950); availability of tools (0.942); stress (0.933); briefing before doing work (0.925); clear and concise instructions (0.917); material availability (0.917); rework (0.908); body temperature (0.908); work accidents (0.908); work-to-work relations (0.908); and experience (0.908). Meanwhile, the main variables on labor productivity in building construction projects in Banda Aceh City are communication (0.947); worker management (0.903); technical (0.893); physiology (0.890); and the application of K3 (0.886). Abstrak Pelaksanaan proyek konstruksi dituntut untuk menghasilkan kualitas yang baik dengan waktu yang telah direncanakan. Sehingga, diperlukan produktivitas yang tinggi agar proyek konstruksi tidak mengalami keterlambatan. Salah satu sumber daya yang diartikan sebagai input dalam produktivitas dan sangat berpengaruh besar dalam proyek adalah tenaga kerja, dimana menjadi salah satu faktor penting dalam menunjang kualitas dan keberhasilan suatu proyek konstruksi. Tujuan dari penelitian ini untuk mengidentifikasi indikator-indikator yang mempengaruhi produktivitas tenaga kerja proyek konstruksi gedung.  Penelitian ini menggunakan metode campuran (mixed methods). Metode pengumpulan data yang digunakan adalah penyebaran kuesioner. Data yang diperoleh dianalisis dengan metode Relative Importance Index (RII). Hasil RII didapatkan 12 (dua belas)  indikator utama terhadap produktivitas tenaga kerja pada proyek konstruksi gedung di Kota Banda Aceh yaitu, tugas dan wewenang yang jelas (0,975); komunikasi efektif di lapangan (0,950); ketersediaan alat (0,942); stress (0,933); pengarahan sebelum melakukan pekerjaan (0,925); instruksi padat dan jelas (0,917); ketersediaan material (0,917); adanya pekerjaan ulang (0,908); suhu tubuh (0,908); adanya kecelakaan kerja (0,908); hubungan antar kerja (0,908); dan pengalaman (0,908). Sedangkan untuk variabel utama terhadap produktivitas tenaga kerja pada proyek konstruksi gedung di Kota Banda Aceh yaitu komunikasi (0,947); manajemen pekerja (0,903); teknis (0,893); fisiologi (0,890); dan penerapan k3 (0,886).