Claim Missing Document
Check
Articles

Found 8 Documents
Search

The Weights Detection of Multi-criteria by using Solver Fachrurrazi Fachrurrazi; Yuwaldi Away; Saiful Husin
International Journal of Electrical and Computer Engineering (IJECE) Vol 7, No 2: April 2017
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (887.636 KB) | DOI: 10.11591/ijece.v7i2.pp858-868

Abstract

Multi criteria, which are generally used for decision analysis, have certain characteristics that relate to the purpose of the decision. Multi criteria have complex structures and have different weights depending upon the consideration of assessors and the purpose of the decision also. Expert’s judgment will be used to detect the criteria weights that applied by assessors. The aim of this study is a model to detect the criteria weights and biases on the subcontractor selection and detecting the significant weights, as decisive criteria. A method, which is used to modeling the weights detection, is the Solver Application. Data, totaling 40 sets, has been collected that consist of the assessor’s assessment and the expert’s judgment. The result is a pattern of weights and biases detection. The proposed model have been able to detect of 20 criteria weights and biases, that consist of 4 criteria in  the total weights of 60% (as decisive criteria) and 16 criteria in the total weights of 40%. A model has been built by training process performed by the Solver, which the result for MSE training is 9.73711e-08 and for MSE validation is 0.00900528. Novelty in the study is a model to detect pattern of weights criteria and biases on subcontractor selection by transferring the expert's judgment using Solver Application.
KEPENTINGAN RELATIF FAKTOR-FAKTOR INTEGRASI MANAJEMEN KOMUNIKASI PADA PROYEK KONSTRUKSI DI BANDA ACEH Dinda Rizka Ibdayanti; Cut Zukhrina Oktavani; Saiful Husin
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i1.20781

Abstract

Ineffective communication can lead to work delays, quality discrepancies, and cost overruns. Thus, effective communication is needed to support the success of construction projects. Poor communication is one of the causes of project failure with a percentage of 56%. On the other hand, effective communication is considered to increase the suitability of the plan in project completion by up to 17%. Communication is a core competency that must be implemented properly in order to achieve the same strategy, goals, and actions. The purpose of this study was to determine the relative importance of communication management integration factors in construction projects based on the Relative Importance Index (RII) analysis. RII analysis will sort the importance of factors based on the highest to lowest RII values. Data was collected by distributing questionnaires to project managers from large and medium qualified contractors in Banda Aceh City. The results of data analysis obtained 3 important factors to integrate communication management in construction projects, i.e.: competence (0.938); management (0.922); and strategy (0.911). If viewed from the sub-factors, there was 5 important sub-factors to integrate communication management in construction projects, i.e.: skill (0.958); attitude (0.950); task clarity (0.942); stakeholder involvement (0.933); and knowledge (0.925). Abstrak Komunikasi yang tidak efektif dapat menyebabkan keterlambatan pekerjaan, ketidaksesuaian mutu, dan kelebihan biaya. Sehingga, diperlukan komunikasi yang efektif sebagai penunjang keberhasilan proyek konstruksi. Komunikasi yang buruk menjadi salah satu penyebab kegagalan proyek dengan persentase sebesar 56%. Sebaliknya, komunikasi yang efektif dinilai dapat meningkatkan kesesuaian rencana dalam penyelesaian proyek hingga 17%. Komunikasi menjadi kompetensi inti yang harus dilaksanakan dengan baik agar dapat mencapai strategi, tujuan, dan tindakan yang sama. Tujuan dari penelitian ini adalah mengetahui kepentingan relatif faktor -faktor integrasi manajemen komunikasi pada proyek konstruksi berdasarkan analisis Relative Importance Index (RII). Analisis RII akan mengurutkan kepentingan faktor berdasarkan nilai RII tertinggi sampai terendah. Pengumpulan data dilakukan dengan penyebaran kuesioner kepada manajer proyek dari kontraktor kualifikasi besar dan menengah di Kota Banda Aceh. Hasil analisis data diperoleh 3 faktor penting untuk mengintegrasikan manajemen komunikasi pada proyek konstruksi, yaitu: kompetensi (0,938); manajemen (0,922); dan strategi (0,911). Jika ditinjau dari subfaktor terdapat 5 subfaktor penting untuk mengintegrasikan manajemen komunikasi pada proyek konstruksi, yaitu: skill (0,958); attitude (0,950); kejelasan tugas (0,942); keterlibatan stakeholders (0,933); dan knowledge (0,925).
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality Saiful Husin; Mubarak Mubarak; Fachrurrazi Fachrurrazi
Aceh International Journal of Science and Technology Vol 8, No 2 (2019): August 2019
Publisher : Graduate Program of Syiah Kuala University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (429.322 KB) | DOI: 10.13170/aijst.8.2.13281

Abstract

The construction involves a series of activities that possibly face problems or risks. The risk probability is an uncertain condition that results in a negative impact on the project objectives. Threats can come from the resources factor in a construction project, such as labour, materials, and equipment. The handling of risks in construction work needs to be further reviewed. It is to find risk factors and risk variables contributing to high risk to achieve the quality objectives of construction implementation. The purpose of this study was to analyze the most significant risk towards the quality of construction associated with the condition of the Province of Aceh during 2000-2015. The situation is classified in three periods, namely political conflict (2000-2004 as Period I), rehabilitation and reconstruction (2005-2009 as Period II), and post-rehabilitation and reconstruction (2010-2015 as Period III). Dataset is collected using questionnaires to 15 large qualified contractor companies to capture construction quality information. The risk significance identified based on Risk Importance Index (RII) for frequency and severity of factors and variables. There are 7 variables for labour resources, 10 variables for material resources, and 17 variables for equipment resources. The quality of construction mostly affected by the labour resources factors in Period I and Period III. The risk comes from the variable discipline of workers who are not good (A3). For Period II, the lack of labour capacity (A2) variable become as the most significant risk.
KAJIAN RESIKO PADA TAHAP PRA BENCANA UNTUK PENENTUAN PRIORITAS PROYEK KONSTRUKSI Saiful Husin; Nurul Malahayati; Aldalina Anggraini
JURNAL TEKNIK SIPIL Vol 2, No 1 (2012): Volume 2, Nomor 1, September 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: This study aims to assess the impact of disaster risk in Ie Pasee, Mireuk Lamreudeup Village, Baitussalam subdistrict, Aceh Besar district, so as to obtain a conclusion that the project fits in the implementation of mitigation. The expected benefits of this study are that it can be used as a model example of strategies used for disaster management. The scope of research includes the study of the impact of disaster risks can be determined so that the appropriate priority construction projects. Planned management of the project only at the stage of preparation and planning cycle and process Engineering System for implementation of disaster mitigation. The data required for this research was primary and secondary form of data, obtained from the Village Apparatus and discussions with the community. The results of studies that influence the risk of disasters: the tsunami and earthquake, earthquakes, inundation, fire, drought, dengue fever, and pest plants. Disasters are a priority to be addressed is a pool with a probability level value of 4 (four) namely:  high possibility (60-80% for next year, or once every 10 years), and the risk level value of 4 (four), namely: Severe (60-80% area destroyed). In a disaster of catastrophic risk assessment results can be concluded that the Beneficiaries needs: the construction of drainage, planting tree, litter shelters, disaster preparedness training, mutual cooperation and socialization and that the priority is the construction of drainage with the results of pair wise ranking methods - charting obtain the largest number is: 105 votes.Keywords : Risk, Disaster, Project, ConstructionAbstrak: Penelitian ini bertujuan untuk mengkaji risiko bencana yang berpengaruh di Dusun Ie Pasee, Desa Mireuk Lamreudeup, Kecamatan Baitussalam, Kabupaten Aceh Besar, sehingga memperoleh suatu kesimpulan proyek yang cocok dalam pelaksanaan mitigasi. Adapun manfaat yang diharapkan dari kajian ini adalah dapat dijadikan suatu contoh model strategi yang digunakan untuk penanggulangan bencana. Ruang lingkup penelitian mencakup kajian risiko bencana yang berpengaruh sehingga dapat ditentukan prioritas proyek konstruksi yang sesuai. Direncanakan manajemen proyek hanya pada tahap persiapan dan perencanaan dalam siklus dan proses Engineering System untuk pelaksanaan mitigasi bencana. Data–data yang diperlukan untuk penelitian ini adalah berupa data Primer dan Skunder, diperoleh dari Aparatur Desa dan juga hasil diskusi bersama masyarakat. Hasil dari kajian risiko bencana yang berpengaruh adalah: tsunami dan gempa bumi, gempa bumi, genangan, kebakaran, kemarau, demam berdarah, dan hama tanaman. Bencana yang menjadi prioritas untuk ditangani adalah genangan dengan tingkat probabilitas bernilai 4 (empat) yaitu: kemungkinan besar (60 – 80% terjadi tahun depan, atau sekali dalam 10 tahun mendatang), dan tingkat bahaya bernilai 4 (empat) yaitu: Parah (60 – 80% wilayah hancur). Dalam penanggulangan bencana dari hasil penilaian risiko bencana dapat disimpulkan bahwa masyarakat memerlukan pembangunan drainase, penanaman pohon, tempat penampungan sampah, pelatihan kesiapsiagaan bencana, gotong royong dan sosialisasi, dan yang menjadi prioritas adalah pembangunan drainase dengan hasil metode pairwise ranking – charting memperoleh angka terbesar yaitu: 105 suara.Kata kunci : Risiko, Bencana,  Proyek, Konstruksi.
Analisis Frekuensi Risiko Proyek Konstruksi Gedung Pada Faktor – Faktor Sumber Daya Tri Yolanda Ariska; Mubarak Mubarak; Saiful Husin
Journal of The Civil Engineering Student Vol 4, No 2 (2022): Volume 4 Nomor 2 September 2022
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/journalces.v4i2.20828

Abstract

Proyek konstruksi gedung melibatkan alokasi sumber daya yang bertujuan mencapai hasil akhir pekerjaan yang ditentukan kesesuaian biaya, waktu dan kualitas. Untuk risiko dapat diidentifikasi berdasarkan sumber risiko yang tekena dampak ketidakpastian. Ditambah adanya peningkatan pandemi yang terus membuat munculnya risiko pembengkakan biaya, terlambatnya waktu penyelesaian pekerjaan, serta ketidaktepatan kualitas. Tujuan penelitian ini untuk mengetahui faktor-faktor risiko yang terjadi pada pelaksanaan proyek konstruksi gedung dan melihat potensi kemunculan risiko yang terjadi. Metode penelitian yang digunakan dengan sumber data primer diperoleh dari jawaban responden pada kuesioner, dan data sekunder diperoleh dari hasil studi literature yang telah dikumpulkan. Teknik analisis data akan diawali dengan uji validitas dan reliabilitas pada variabel penelitian, analisa deskriptif, dan analisis Frequency Index (FI). Hasil menjelaskan faktor risiko sumber daya ditemui dan mempengaruhi selama pelaksanaan proyek, serta penilaian atau kriteria frekuensi risiko yang didapatkan berbeda-beda yaitu pada faktor risiko material, risiko peralatan, risiko metode konstruksi, dan risiko tenaga kerja.
Identifikasi Faktor-Faktor Risiko Bagi Kontraktor di Kabupaten Aceh Utara Menggunakan Analisa Deskriptif, Frequency Index, dan Anova aufa aufa ghufran; Febriyanti Maulina; Saiful Husin
Journal of The Civil Engineering Student Vol 1, No 2 (2019): Volume 1, Nomor 2, Agustus 2019
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Risiko suatu proyek kontruksi dapat berbeda-beda terutama pada periode yang berbeda seperti halnya di Kabupaten Aceh Utara. Tujuan dari penelitian ini adalah untuk mengetahui variabel dari masing-masing risiko yang dominan dalam proyek konstruksi serta menganalisis perbedaan rata-rata frekuensi terjadinya variabel risiko pada tiga periode. Metode yang digunakan adalah dengan melakukan survey kuesioner pada 32 perusahaan kontraktor kualifikasi kecil dan menengah. Instrumen diuji menggunakan  uji validitas dan uji reliabilitas dengan hasil keduanya menunjukkan valid dan reliabel. Pengolahan data dilakukan menggunakan perhitungan analisis deskriptif. Hasil analisis deskriptif  menujukkan bahwa pada fase konflik frekuensi kejadian paling tinggi yaitu variabel keterlambatan pengiriman material, pada fase rehabilitasi rekonstruksi ialah kenaikan harga BBM, dan fase pasca rehabilitasi rekonstruksi yaitu keadaan cuaca tidak menentu.  Analisis frequency index (FI) yang paling dominan ialah keterlambatan pengiriman material pada fase konflik, selanjutnya kenaikan harga BBM pada fase rehabilitasi dan keadaan cuaca tidak menentu pada fase pasca rehabilitasi rekonstruksi. Perhitungan analysis of variance (Anova) menunjukkan terdapat pengaruh dengan adanya perbedaan nyata atau signifikan.
Identifikasi Kemungkinan Terjadinya Risiko Pada Kontraktor Kualifikasi Kecil dan Menengah di Kabupaten Aceh Barat Menggunakan Analysis Frequency Index Yanang Prastikniya Armis; Nurisra Nurisra; Saiful Husin
Journal of The Civil Engineering Student Vol 1, No 2 (2019): Volume 1, Nomor 2, Agustus 2019
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kabupaten Aceh Barat pernah mengalami beberapa periode yaitu konflik bersenjata, serta bencana gempa bumi dan tsunami yang melanda daerah tersebut. Kota Meulaboh merupakan salah satu daerah terparah yang terkena dampak gempa bumi dan tsunami pada tahun 2004 silam. Tujuan dari penelitian ini adalah untuk mengetahui variabel risiko yang dominan terjadi pada perusaahan penyedia jasa konstruksi yang telah melalui tiga periode. Penelitian dilakukan pada kontraktor kualifikasi kecil dan menengah di Kabupaten Aceh Barat yang sudah berdiri sebelum tahun 2005 dengan jumlah 43 perusahaan dari 73 populasi kontraktor. Pengujian instrumen dilakukan dengan menggunakan uji validitas dan reliabilitas. Hasil penelitian yang diperoleh bahwa variabel peperangan (H4) dan kenaikan harga material (A1) dari aspek material merupakan risiko yang dominan terjadi pada periode konflik. Sementara variabel masalah sosial (lingkungan sekitar) (H1) merupakan risiko yang dominan terjadi pada periode rehabilitasi dan rekonstruksi serta pada periode pasca rehabilitasi dan rekonstruksi. 
Model Time-Cost Trade Off untuk Pekerjaan Kolom Utama di Kabupaten Aceh Selatan Isra Isra; Saiful Husin; Fachrurrazi Fachrurrazi
Journal of The Civil Engineering Student Vol 1, No 3 (2019): Volume 1, Nomor 3, Desember 2019
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pada pelaksanaan proyek konstruksi kadang kala kontraktor sering melakukan percepatan penyelesaian proyek. Salah satu alasan kontraktor mempercepat pelaksanaan proyek adalah karena adanya permintaan secara khusus dari pihak owner. Percepatan dilakukan dengan tetap memperhatikan faktor biaya sehingga dilakukan dengan biaya paling minimum. Penelitian ini bertujuan untuk memodelkan time-cost trade-off (TCTO) pada pekerjaan kolom utama di Kabupaten Aceh Selatan. Model TCTO akan dikembangkan dari data penyebaran kuisioner langsung kepada direktur, manajer, estimator proyek yang berdomisili di Kabupaten Aceh Selatan. Selain kuisioner, penelitian ini juga menggunakan data sekunder yaitu rencana anggaran biaya (RAB) yang diperoleh dari responden. Analisa yang digunakan dalam penelitian ini adalah analisa regresi linear sederhana. Model TCTO yang dihasilkan untuk masing-masing pekerjaan adalah pekerjaan pengecoran kolom utama: C = 93.145.319,13 – 2.322.866,34D dan pada pekerjaan pembesian kolom utama: C = 83.811.240,95 – 1.700.177,42D dengan D berkisar dari 10 sampai 4 hari. Pekerjaan bekisting kolom utama: C = 181.963.494,91 – 4.638.756,24D dengan D berkisar dari 10 sampai 3 hari.Dari hasil analisis data menunjukkan bahwa menurut 50 responden yang diteliti, percepatan durasi mengakibatkan terjadinya peningkatan biaya pelaksanaan pekerjaan secara linear.