KAJIAN FAKTOR PENYEBAB KENDALA IMPLEMENTASI KONSEP GREEN CONSTRUCTION PADA GEDUNG PASAR GIANYAR NI LUH MADE AYU MIRAYANI PRADNYADARI; TJOKORDA ISTRI PRAGANINGRUM
GANEC SWARA Vol 17, No 2 (2023): Juni 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i2.469

Abstract

Ongoing construction projects using material resources and equipment can harm environmental conditions. Thus, it requires high awareness and willingness to maintain the environment in construction project management. Green construction is explained as an effort or strategy for managing construction activities, including the use of resources that are efficient and environmentally friendly so that they can support a sustainable movement. This research aims to discover the causes of obstacles in implementing green construction in the Gianyar Market development project. The method used is qualitative, with interviews with 28 respondents involved in the construction process of the Gianyar Market development. From the results of the study, it was found that the constraints experienced by contractors in the implementation of Greem construction included (1) Human Resources, (2) Materials or Material Resources, (3) Facilities and Infrastructure, and (4) Costs. These constraints are caused by several factors, namely (1) Lack of understanding, (2) Requiring particular experts, (3) Need to improve the quality of facilities and infrastructure, and (4) Readiness of the budget. From these results, it is possible to evaluate and increase the quantity and quality of the facilities and infrastructure owned to support the implementation of green construction, as well as coordinate with Experts who understand green construction well.
KEANDALAN BANGUNAN GEDUNG PASAR RAKYAT TEMATIK WISATA UBUD TJOKORDA ISTRI PRAGANINGRUM; NI LUH MADE AYU MIRAYANI PRADNYADARI; NI NYOMAN INTAN SAWITRI SARASWATI
GANEC SWARA Vol 17, No 4 (2023): Desember 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i4.650

Abstract

Implementing building reliability is necessary to ensure the safety of all elements in the building. The Ubud Tourism Thematic People's Market is a 2-story building equipped with a basement. Located on Jl. Raya Ubud Nomer. 35, Ubud District, Gianyar, with a building area of 8,253 m2. This research aims to determine the level of reliability of the Ubud Thematic Tourism People's Market building. This research uses quantitative descriptive research methods. Data was obtained from a questionnaire guided by Minister of Public Works Regulation No. 29/PRT/M/2006 and Gianyar Regent Regulation Number 7 of 2023. Data analysis in this research was carried out using interview method and questionnaires. The interview method used purposive sampling with a sample of parties involved in the construction of the Ubud Thematic Tourism People's Market building, with a total of 26 respondents. The results obtained by the level of reliability of the Ubud Thematic Tourism People's Market building were divided into five, namely architectural reliability of 96.08% including reliable (95 - 100%), structural reliability of 95.92% including reliable (95 - 100%), reliability of utilities and fire protection is 96.25% including reliable (95 – 100%), reliability of accessibility is 95.76% including reliable (95 – 100%), and reliability of building layout and environment is 95.4% including reliable (95 – 100% ). The total reliability value of the Ubud Thematic Tourism People's Market building is 96.80%, including reliability (95 – 100%).