Claim Missing Document
Check
Articles

Found 3 Documents
Search

PERFORMANCE ANALYSIS OF THE ELECTRIC TROLLEY OF OXYGEN CYLINDERS BASED ON THE ROAD SLOPE Costantinus Oei; Maran Gultom; Obet Takke Ranteallo; Thobby Wakarmamu; Marthen Liga; Endang Hartiningsih; Johni Jonatan Numberi; Akbar Silo
ROTOR Vol 16 No 1 (2023)
Publisher : Jurusan Teknik Mesin Fakultas Teknik Universitas Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.19184/rotor.v16i1.40522

Abstract

The demand for efficient distribution of oxygen cylinders at Abepura Regional General Hospital (RSUD Abepura) has been steadily increasing due to the growing needs of staff members and patients who expect high-quality service within the hospital premises. In response to this demand, this study aims to propose a transportation system that is not only automated but also time-saving, with the ultimate goal of enhancing medical services in a more efficient, eco-friendly, and safe manner. One of the main challenges faced in the distribution process is the hilly terrain surrounding RSUD Abepura. The presence of these hills makes it difficult to manually distribute the heavy 72 kg gas cylinders, which is the current method employed at the hospital. To overcome this challenge, this research suggests implementing an innovative solution—an electric trolley—that can effectively facilitate the distribution and flow of oxygen cylinders at RSUD Abepura. The findings of this study conclusively demonstrate that the electric trolley is not only a suitable but also a convenient solution for the operators and medical staff involved in the distribution process. By utilizing the electric trolley, they can distribute oxygen cylinders without facing any hindrances posed by the uphill roads, ultimately resulting in significantly improved time efficiency and service effectiveness at RSUD Abepura.
Desain Turbin Pelton Kapasitas 26 kW pada Pembangkit Listrik Tenaga Mikrohidro (Studi Kasus: Kampung Nehibe) Evenly Evenly; Pither Palamba; Marthen Liga; Johni Jonatan Numberi; Endang Hartiningsih; Thobby Wakarmamu; Tiper K. M. Uniplaita
Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa dan Inovasi Volume 5 Nomor 2 Tahun 2023
Publisher : Fakultas Teknik Universitas Pancasila

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/asiimetrik.v5i2.5126

Abstract

The need for electrical energy in Nehibe village is currently increasing along with the increase in population and new households. The demand for electricity in this village reaches 18 kW, with an average power per household of 450 VA. The problem is that Hachakwa Nehibe Micro Hydro Power Plant (PLTMH), which is very close to the village, has a capacity of only 10 kW. Based on that problem, this study aims to design a peltor turbine with two nozzles for the new 26 kW PLTMH. This power plant uses the water from the Tena Mroway and Yora Mroway rivers, which are located 2 km from the end of the village, as a new source of energy. This design of the turbine is based on the mathematical equations, measurement data of the head, and the flow of the rivers. This research shows that the Pelton turbine with two nozzles (nj), 0.032 meters of jet diameter (Dj), 0.330 meters of runner diameter (Dr), 0.096 meters of bucket diameter, and 21 buckets can produce 26 kW of power with 60 ltr/sec of river flow and 77 meters of head height. This specialization can be used to develop the new PLTMH in Nahibe Village.
Analisis Konsumsi Listrik di Provinsi Papua terhadap Pengaruh Investasi, Belanja Pengeluaran Daerah, Indeks Pembangunan Manusia dan Jumlah Penduduk Yosef Lefaan; Edwin Ginting; Johni Jonatan Numberi; Endang Hartiningsih; Maran Gultom; Thobby Wakarmamu; Tiper K. M. Uniplaita
Jurnal Asiimetrik: Jurnal Ilmiah Rekayasa dan Inovasi Volume 5 Nomor 2 Tahun 2023
Publisher : Fakultas Teknik Universitas Pancasila

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/asiimetrik.v5i2.5189

Abstract

Electricity consumption is an important factor in driving economic growth. Increasing economic growth will increase electricity consumption, and vice versa. The effect of the growth of electricity consumption on economic growth in Papua Province is a goal to be known through this research. To achieve this goal, secondary data for 2012–2022, sourced from the Central Bureau of Statistics for Papua Province and PT. PLN (Persero) Papua and West Papua regions, are processed using a quantitative approach and multiple regression analysis model. This secondary data includes investment value, regional expenditure, the human development index, and population, which is an independent variable. While the electricity consumption data is a dependent variable. The results of the study show that simultaneously, all independent variables have a significant effect on the dependent variable. The value of investment, regional expenditures, and the human development index have a positive but not significant effect on increasing electricity consumption. While the population has a positive and significant influence on increasing electricity consumption.