Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari Mustahyun, Al; Sunaryo, Sunaryo; Rahmat, La Ode Musa; Sufrianto, Sufrianto
Sultra Civil Engineering Journal Vol 2 No 1 (2021): Sultra Civil Engineering Journal (SCiEJ)
Publisher : Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (846.126 KB) | DOI: 10.54297/sciej.v2i1.166

Abstract

Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increased productivity will reduce work time, and will reduce costs, especially labor costs so that the minimum labor cost is obtained (labor costs) to get competitive prices both for auction and implementation. The purpose of this study is to analyze the labor productivity time in completing 1 m2 of masonry bricks and to analyze the productivity value of brick masons in completing work activities in the construction project of the Mandala Wangi 2 female dormitory. The results showed that the time required to complete 1 m2 of brick laying work was 41.13 minutes on average. The productivity of the artisans working on the 1st floor is an average of 1.45 m2/hr. Meanwhile, the productivity of craftsmen working on the 2nd floor is an average of 1.47 m2/hr.