Montreano, Donny
Department of Industrial Engineering, Universitas Pembangunan Nasional “Veteran” Jakarta

Published : 5 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 5 Documents
Search

Pemberdayaan Masyarakat Pesantren tentang Sel Surya untuk Fasilitas Listrik di Desa Sekarwangi, Cibadak, Sukabumi Jawa Barat Montreano, Donny; Waluyo, Mohammad Rachman; Rizal, Reda
International Journal of Community Service Learning Vol 2, No 4 (2018): November 2018
Publisher : Universitas Pendidikan Ganesha

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (503.298 KB) | DOI: 10.23887/ijcsl.v2i4.16244

Abstract

Pemerintah menargetkan 10.300 desa teraliri listrik pada 2019. Pada 2019, peningkatan rasio elektrifikasi nasional ditargetkan menjadi 97 persen. Melalui Kementerian Energi dan Sumber Daya Mineral (ESDM), meluncurkan Program Indonesia Terang (PIT) dalam rangka memenuhi target peningkatan rasio elektrifikasi nasional dari 85 persen pada tahun 2015 menjadi 97 persen di tahun 2019. PIT juga menjadi bagian dari target pemerintah yang menyediakan akses penerangan bagi masyarakat Indonesia secara merata melalui pembangunan pembangkit 35.000 MW. Dalam rilis pers Kementerian ESDM pada 28 Februari 2016, disebutkan bahwa hingga saat ini, masih ada 12.659 desa tertinggal yang belum memperoleh akses listrik dari jaringan Perusahaan Listrik Negara (PLN), bahkan 2.519 desa diantaranya belum terlistriki sama sekali. Desa-desa ini sebagian besar tersebar di Provinsi Papua dan di kawasan Indonesia Timur lainnya. Populasi penduduk rata-rata sedikit dengan tingkat kepadatan yang rendah, akibatnya membangun jaringan listrik menjadi sangat mahal dan membuat hitung-hitungan ekonomi menjadi rugi. Pemerintah perlu memberikan perhatian lebih khusus kepada masyarakat di desa-desa tertinggal ini supaya mereka dapat segera terlayani listrik, tanpa kebijakan dan aksi yang berpihak, desa-desa tersebut mustahil bisa mengakses listrik sesuai target yang telah dicanangkan.
PERANCANGAN SISTEM INFORMASI PKL DAN SKRIPSI YANG MAMPU MENGUKUR WAKTU PENYELESAIAN PENGAJUAN SURAT TUGAS PEMBIMBING Montreano, Donny
Bina Teknika Vol 12, No 2 (2016): Bina Teknika
Publisher : Fakultas Teknik UPN "Veteran" Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (617.105 KB)

Abstract

Computerized information system is neededs to help the Dikjar Unit to ease business processes at Faculty of Engineering, Universitas Pembangunan Nasional "Veteran" Jakarta to input data. Therefore, it is necessary to design information systems that can support the process. As for tools and construction techniques used in this design, such as flowchart, data flow diagram (DFD) and Entity Relationship Diagram (ERD). And use of software, such as Microsoft Visual Basic 2013 as a tool for designing programs based on web, Microsoft Excel 2013 as the database that will connect with the program designed. This research was limited to only discussing about the design and internal running test. The real appliying on the Dikjar Unit will be discuss on next period of this jurnal. The end result of this research is a web-based application program that used to perform data entry preceptor of thesis and work practice, which are able to assess the performance of the Dikjar's Unit completion time.
ANALISIS PERBANDINGAN SIFAT ALIRAN PADA MODEL 2D AXISYMMETRIC DENGAN MODEL 3D DENGAN METODE NUMERIK Hendrarsakti, Jooned; Prakoso, A. D.; Montreano, Donny
Bina Teknika Vol 12, No 2 (2016): Bina Teknika
Publisher : Fakultas Teknik UPN "Veteran" Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (520.974 KB)

Abstract

Many previous studies of ejector have been conducted to understand and maximize the ejector performance. The study can be in form of experiments, analytical, and numerical simulation. The numerical simulation looks for the most effective and efficient effort and time in modeling flow process inside the ejector. Model simplification becomes one of solution in conducting simulation effectively. Three dimensional models in general are applied to an ejector that would be analyzed. These models can be compared to the simpler model, namely axisymmetric 2D model. The current study investigated the comparison between 3D and 2D models using numerical solution. Three types of ejectors from different application were used as the objects of the study. The analysis was conducted by comparing the qualitative and quantitative results. The results show that qualitatively the 2D axisymmetric model has good comparison to the 3D model. Quantitatively, 2D axisymmetric model has good similarity to 3D model for ejector performance parameters, such as entrainment ratio and Mach number with biggest difference of 5.7%. However, the velocity and pressure distribution have bigger discrepancies at both axial and radial directions at the area with extreme change, such as at throat nozzle. It can be concluded that the 2D axisymmetric model can be used as substitution of 3D model when the objective is only to obtain ejector performance and qualitative study.
USULAN PENGHEMATAN DAYA LAMPU PADA RUANGAN LABORATORIUM KOMPUTASI FAKULTAS TEKNIK DAN RUANGAN SEJENISNYA DI UNIVERSITAS PEMBANGUNAN NASIONAL “VETERAN” JAKARTA Montreano, Donny; Faradisti, Ghea
Bina Teknika Vol 11, No 2 (2015): Bina Teknika
Publisher : Fakultas Teknik UPN "Veteran" Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (684.623 KB)

Abstract

The light in the workspace should be set for a comfortable and healthy employees. If possible energy saving will be even better. In this research, the object of the case study is Computer Laboratory Room in the Faculty of Engineering UPN “Veteran” Jakarta. Problems were found in Computer Laboratory Room is a waste of energy if the lamp position higher than the lamp that hung using a rope. The electricity wastage would be better if it can be minimized, so that the university can take advantage of the budget is wasted on inefficient lighting for research activities and improvement of facilities in the university environment. So that savings can be achieved then the first step is to determine the formulation of the relationship between the intensity of light, lamp power and distance can use Multiple Linear Regression and Poisson regression methods. After processing the data and analysis can be seen equation fluorescent light: Lux Neon = exp (Y '), Y' = 4.248 + 0.04698 Watt Neon - 0.007542 Distance, and spiral lamps equation: Lux Spiral = exp (Y ') , Y '= 3.385 + 0.06330 Watt Spiral - 0.005169 Distance.
Pengendalian Tangan Robot Perakit Pada Disain Computer Integrated Manufacturing Berbiaya Rendah (CIM) Menggunakan Visual Basic Dan Arduino Montreano, Donny; Pradana, Sigit
Bina Teknika Vol 14, No 2 (2018): Bina Teknika
Publisher : Fakultas Teknik UPN "Veteran" Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1147.777 KB)

Abstract

Computer Integrated Manufacturing (CIM) merupakan suatu teknologi fabrikasi gabungan yang unit-unit prosesnya dikendalikan oleh satu komputer. CIM merek Intelitek sudah terkenal dan meskipun sangat mahal namun tetap menjadi acuan untuk pembelajaran bidang manufaktur khusunya teknik industri karena kecanggihan software simulasi dan modul praktikumnya berbasis website. Tujuan jangka panjang dari penelitian ini adalah membangun CIM alternatif yang murah, tanpa menyertakan software simulasi, dengan menggunakan microcontroler Arduino Due 32-bit agar menciptakan produk pesaing yang meskipun jauh lebih murah dari merek Intelitek, namun tetap dapat mengantarkan esensi pembelajaran CIM pada level dasar. Penelitian ini bermaksud membangun 4 Robotic Arm untuk stasiun perakitan yang dahulu secara tradisinya hanya untuk kebutuhan material handling atau dengan istilah loading unloading. Benda yang dirakit pada penelitian ini adalah Satu Balok Tetris 4 Susun. Hasil penelitian menunjukkan terjadi 50% kegagalan rakit disebabkan konstruksi Robotic Arm yang suaian antar komponennya terlalu longgar meski sudah dikencangkan