JURNAL KAJIAN TEKNIK MESIN
Vol 8, No 2 (2023): Jurnal Kajian Teknik Mesin

Perancangan Mesin Conveyor Untuk Peningkatan Efisiensi Produksi di PT. XYZ

Novi Misgi Prabowo Adi (Politeknik ATMI Surakarta)
Pangedi Winata (Politeknik ATMI Surakarta)
Aditya Nugraha (Politeknik ATMI Surakarta)
Adhi Satya Hutama (Politeknik ATMI Surakarta)



Article Info

Publish Date
04 May 2023

Abstract

AbstrakDepartemen Handspray adalah bagian yang bertugas untuk pewarnaan produk di PT. XYZ. Proses produksi initerdiri dari dua kegiatan yaitu pengecatan dan inspeksi. Proses pengambilan box dari lini produksi pengecatan keproses inspeksi masih dilakukan secara manual yang menyebabkan penambahan operator pada lini produksi.Karena kurangnya mesin yang memadai proses menyebabkan menambahnya operator untuk produksi yangmenyebabkan tidak efisiennya waktu produksi karena banyak proses yang dikerjakan operator. Berdasarkanlatar berlakang permasalahan tersebut diketahui bahwa diperlukan usulan perancangan mesin untuk prosesperpindahan box dari line pengecatan ke proses inspeksi. Proses perancangan dilakukan menggunakan metodeVDI 2222, dengan membuat daftar permintaan maka dapat dibuat beberapa alternatif solusi dari mesin. Hasilperancangan mesin dibuat untuk memberikan alternatif mesin untuk membantu pada proses produksi.Rancangan dibuat dengan memperhatikan standard proses produksi di Departemen Handspray. Berdasarkanhasil penilaian alternatif maka didapatkan rancangan mesin yang dapat mengganti kegiatan manual operatoruntuk pengambilan box sehingga dapat meningkatkan efisiensi dalam segi jumlah produk sebesar 14,35% dandalam segi jumlah operator sebesar 12,71%.Kata Kunci: Perancangan, Conveyor, Efisiensi, VDI 2222.AbstractThe Handspray Department is the part in charge of product coloring at PT. XYZ. This production processconsists of two activities, that is painting and inspection. The process of taking boxes from the paintingproduction line to the inspection process is still done manually which causes the addition of operators to theproduction line. Due to the lack of adequate machines, the process causes the addition of operators forproduction which causes inef icient production time because many processes are carried out by operators.Based on the background of these problems, it is known that a machine design proposal is needed for theprocess of moving boxes from the painting line to the inspection process. The design process is carried out usingthe VDI 2222 method, by making a request list, several alternative solutions can be made from the machine. Theresults of the machine design are made to provide alternative machines to assist in the production process. Thedesign is made by taking into account the production process standards in the Handspray Department. Based onthe results of the alternative assessment, a machine design is obtained that can replace the manual operatoractivities for box picking so that it can increase ef iciency in terms of the number of products by 14.35% and interms of the number of operators by 12.71%.Keywords: Design, Conveyor, Ef iciency, VDI 22221.PENDAHULUANLangkah efisiensi produksi dilakukanPT. XYZ untuk meningkatkan kualitasproduksi pada bagian produksi Departemen

Copyrights © 2023