Model Hubungan Pertukaran Waktu dan Biaya pada Pekerjaan Rangka Atap di Kabupaten Pidie

Rita Zahara (Unknown)
Nurul Malahayati (Syiah Kuala University)
Fachrurrazi Fachrurrazi (Syiah Kuala University)



Article Info

Publish Date
08 Aug 2020

Abstract

At the time of construction work, things that can lead to the outcome of the project, such as building, design and giving birth to mobilization. To overcome the necessary acceleration of construction projects. This study examines a large number of additional acceleration costs per day, aimed at creating Time Cost Trade off (TCTO) models in Pidie District. The time trade cost off model will be developed from questionnaire distribution data to directors, managers, project estimators domiciled in Pidie District. In addition to questionnaires, this study also uses secondary data that is cost budget plan (RAB) obtained from respondents. The analysis used in this research is simple linear regression analysis. The resulting model for lightweight steel roof truss work is c = 35.170.497,87-640.612,35d with and duration of accident (Dc) is 4 days. Therefore, the maximum acceleration that can be made is 6 days (60% of the normal duration) and the maximum additional charge of 9.33% of the normal cost with an additional cost per day (slope) is 2.33% of the normal cost.

Copyrights © 2020






Journal Info

Abbrev

CES

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Engineering Transportation

Description

Journal of The Civil Engineering Student (JOCES) adalah jurnal ilmiah yang diterbitkan secara berkala oleh Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala. Jurnal ini memuat artikel dari hasil tugas akhir mahasiswa/i di Jurusan Teknik Sipil untuk dipublikasikan, baik dari Universitas ...