Jurnal Rekayasa dan Manajemen Sistem Industri
Vol 4, No 7 (2016)

PENERAPAN METODE AGE REPLACEMENT PADA KOMPONEN KRITIS MESIN GARRANT UNTUK MENETAPKAN INTERVAL PERAWATAN

Raynar, Wishnu (Unknown)
Novareza, Oyong (Unknown)
Rahman, Arif (Unknown)



Article Info

Publish Date
11 Aug 2016

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui email wishnu.raynar@gmail.com, novareza15@ub.ac.id, posku@ub.ac.id Terima kasih    

Copyrights © 2016