Proceeding of the Electrical Engineering Computer Science and Informatics
Vol 4: EECSI 2017

Makassar Smart City Operation Center Priority Optimization Using Fuzzy Multi-Criteria Decision- Making

Fachrul Kurniawan (Institut Teknologi Sepuluh Nopember (ITS), Maulana Malik Ibrahim Malang Islamic State University of Malang)
Aji Prasetya Wibawa (Universitas Negeri Malang)
Munir Munir (Universitas Pendidikan Indonesia)
Supeno Mardi Susiki Nugroho (Institut Teknologi Sepuluh Nopember (ITS),)
Mochamad Hariadi (Institut Teknologi Sepuluh Nopember (ITS),)



Article Info

Publish Date
01 Nov 2017

Abstract

The development of smart city operation room of Makassar possesses several equally important stages which are equally important. There are four stages of development that are 1) data center construction, 2) camera distribution around the city , 3) wall room monitoring construction, and 4) smart operation room architecture construction. Since the time and cost are limited, it forces the project manager to be able to manage and  control the  priority in  conducting the  project. There are several usable criteria to determine the priority in conducting the project development through criteria consideration of the entire project stages. Project priority optimization system aims at making every single project activity effective including its evaluation process. It also exposes a ranking illustration of foremost project priority by providing cost preference of the entire development stages. Fuzzy Multi-Criteria Decision-Making is used to illustrate the project priority rank and further to determine the alternative optimal option in conducting the project. This enforces particular project to  allocate its  cost to  the  project  with  a higher level of cost necessity. The company, therefore, enables to make effective funding for the entire project based on the level of importance and time achievement and subsequently it promotes  accessible  technology integration.  The  conducted experiment suggests that the first construction of the project is data center construction followed by wall room construction and  CCTV  distribution. This  is  relevant  with  optimization value result of data center 0,405 higher than A2 0,42 for wall room construction and A3 CCTV distribution 0,24.

Copyrights © 2017






Journal Info

Abbrev

EECSI

Publisher

Subject

Computer Science & IT Electrical & Electronics Engineering

Description

Proceeding of the Electrical Engineering Computer Science and Informatics publishes papers of the "International Conference on Electrical Engineering Computer Science and Informatics (EECSI)" Series in high technical standard. The Proceeding is aimed to bring researchers, academicians, scientists, ...