Fachrul Kurniawan
Institut Teknologi Sepuluh Nopember (ITS), Maulana Malik Ibrahim Malang Islamic State University of Malang

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Makassar Smart City Operation Center Priority Optimization Using Fuzzy Multi-Criteria Decision- Making Fachrul Kurniawan; Aji Prasetya Wibawa; Munir Munir; Supeno Mardi Susiki Nugroho; Mochamad Hariadi
Proceeding of the Electrical Engineering Computer Science and Informatics Vol 4: EECSI 2017
Publisher : IAES Indonesia Section

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (383.284 KB) | DOI: 10.11591/eecsi.v4.1010

Abstract

The development of smart city operation room of Makassar possesses several equally important stages which are equally important. There are four stages of development that are 1) data center construction, 2) camera distribution around the city , 3) wall room monitoring construction, and 4) smart operation room architecture construction. Since the time and cost are limited, it forces the project manager to be able to manage and  control the  priority in  conducting the  project. There are several usable criteria to determine the priority in conducting the project development through criteria consideration of the entire project stages. Project priority optimization system aims at making every single project activity effective including its evaluation process. It also exposes a ranking illustration of foremost project priority by providing cost preference of the entire development stages. Fuzzy Multi-Criteria Decision-Making is used to illustrate the project priority rank and further to determine the alternative optimal option in conducting the project. This enforces particular project to  allocate its  cost to  the  project  with  a higher level of cost necessity. The company, therefore, enables to make effective funding for the entire project based on the level of importance and time achievement and subsequently it promotes  accessible  technology integration.  The  conducted experiment suggests that the first construction of the project is data center construction followed by wall room construction and  CCTV  distribution. This  is  relevant  with  optimization value result of data center 0,405 higher than A2 0,42 for wall room construction and A3 CCTV distribution 0,24.