Jurnal Teknik Industri
Vol. 5 No. 2 (2003): DECEMBER 2003

A MODIFIED GIFFLER AND THOMPSON ALGORITHM COMBINED WITH DYNAMIC SLACK TIME FOR SOLVING DYNAMIC SCHEDULE PROBLEMS

Tanti Octavia (Faculty of Industrial Technology, Petra Christian University)



Article Info

Publish Date
13 Jul 2004

Abstract

A Modified Giffler and Thompson algorithm combined with dynamic slack time is used to allocate machines resources in dynamic nature. It was compared with a Real Time Order Promising (RTP) algorithm. The performance of modified Giffler and Thompson and RTP algorithms are measured by mean tardiness. The result shows that modified Giffler and Thompson algorithm combined with dynamic slack time provides significantly better result compared with RTP algorithm in terms of mean tardiness.

Copyrights © 2003






Journal Info

Abbrev

ind

Publisher

Subject

Industrial & Manufacturing Engineering

Description

Jurnal Teknik Industri aims to: Promote a comprehensive approach to the application of industrial engineering in industries as well as incorporating viewpoints of different disciplines in industrial engineering. Strengthen academic exchange with other institutions. Encourage scientist, practicing ...