cover
Contact Name
Aminullah
Contact Email
aminullahmtk@gmail.com
Phone
-
Journal Mail Official
aminullahmtk@gmail.com
Editorial Address
-
Location
Kota denpasar,
Bali
INDONESIA
GANEC SWARA
ISSN : 19780125     EISSN : 26158116     DOI : 10.35327
Ganec Swara merupakan wadah untuk hasil penelitian dan ulasan ilmiah pada bidang-bidang ilmu seperti Ilmu Sosial, Pertanian, Ekonomi, Teknik, Hukum, Kependidikan dan Humanior.
Arjuna Subject : -
Articles 32 Documents
Search results for , issue "Vol 16, No 2 (2022): September 2022" : 32 Documents clear
ANALISIS METODE PELAKSANAAN PEMBANGUNAN BANGUNAN BAMBU REGENERATIVE FARMING LEARNING CENTER (RFLC) SUBAK UMA LAMBING SIBANGKAJA TJOKORDA ISTRI PRAGANINGRUM; I GEDE ANGGA DIPUTERA; WAYAN GDE ADI ANANTAWIJAYA
GANEC SWARA Vol 16, No 2 (2022): September 2022
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v16i2.320

Abstract

Overall development continues from time to time. Bali as a tourist destination also always strives to improve its quality by carrying out various developments, especially in fields that support tourism activities. Bali with its natural wealth uses bamboo as the basis for buildings. Apart from being a natural material, it also has a high aesthetic value. However, it must be realized that the use of bamboo material requires special skills and methods that are different from the use of other materials. One of the buildings that uses bamboo is the Regenerative Farming Learning Center (RLFC) Subak Uma Lambing Sibangkaja. This study aims to determine in detail how the construction method for buildings with bamboo material is and how it relates to costs and implementation time. The method used is descriptive with qualitative and quantitative approaches. The author makes observations to observe the stages of activities, material specifications and workmanship techniques during the construction process. Based on the results of the analysis obtained a description of the stages of each work starting from foundation work to finishing. It is known that the cost of constructing the RLFC building is Rp. 241,054.000,00 and the processing time required in the manufacture of this RFLC bamboo building is 7 weeks or 49 days
PARADOKS PEMEKARAN WILAYAH (STUDI PEMEKARAN DESA DALAM KONTEKS UU DESA DI KABUPATEN LOMBOK TIMUR) LALU MUH. KABUL
GANEC SWARA Vol 16, No 2 (2022): September 2022
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v16i2.336

Abstract

The previous studies on regional fragmentation showed that the condition of new region is not better than old one. This study described paradox of regional fragmentation (village) compared to the previous studies. The study method used is mixed methods, namely quantitative and qualitative. The result of study showed that based on “Status IDM” in context of Village Law it is found three village categories in East Lombok District, namely developing village, advanced village, and self reliance village. In the context of regional fragmentation, it is more new village that experienced “Status IDM” increased than old one. Meanwhile, that result of study showed the paradox, it meant that condition of new village is better than old one

Page 4 of 4 | Total Record : 32