cover
Contact Name
urnal Industry Xplore
Contact Email
industry.xplore@ubpkarawang.ac.id
Phone
+6289630201167
Journal Mail Official
industry.xplore@ubpkarawang.ac.id
Editorial Address
Jl. HS Ronggowaluyo Telukjambe Timur, Karawang, Jawa Barat, Indonesia
Location
Kab. karawang,
Jawa barat
INDONESIA
Industry Xplore
ISSN : 25280821     EISSN : 25805479     DOI : 10.36805
Core Subject : Engineering,
Industry Xplore adalah Jurnal Ilmiah Teknik Industri, FTIK, Universitas Buana Perjuangan Karawang, sebagai wadah pengembangan bidang ilmu Teknik dan Manajemen Industri, berisi hasil kajian dan penelitian dari Dosen, Peneliti, serta Praktisi Industri. Jurnal ini dikelola oleh Program Studi Teknik Industri dan diterbitkan oleh Lembaga Penelitian dan Pengabdian pada Masyarakat. Industry Xplore mulai terbit pada tahun 2016 dan sampai tahun 2019 telah mencapai 4 volume.
Articles 8 Documents
Search results for , issue "Vol 8 No 2 (2023): Industry Xplore" : 8 Documents clear
ANALISA KETENTUAN KESELAMATAN KERJA PADA KONTRAK KONSTRUKSI FIDIC BUKU MERAH 2017 Gusman Simon
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5191

Abstract

Occupational accidents in the construction sector have a very significant contribution. One of the constructive efforts that can be carried out is to apply the Occupational Health and Safety provisions as stated in the construction contract. Among the various construction contract formats, the FIDIC Red Book 2017 contains several Occupational Health and Safety provisions in its clauses which can be used as a reference for Employers and Contractors in terms of risk sharing and scope of responsibility. The research aims to describe the Occupational Health and Safety provisions in the 2017 Red Book FIDIC construction contract format and compare them with applicable national regulations. From an analysis of the contents of sub-clauses that are relevant to Occupational Health and Safety and a comparison with the regulation of the Minister of PUPR Number 10 of 2021 concerning guidelines for construction safety management systems, an insight into the contents of the 2017 Red Book FIDIC sub-clauses regarding Occupational Health and Safety, in general, has been included in the regulation of the Minister of PUPR Number 10 of 2021. FIDIC itself prioritizes Contractor compliance with applicable national regulations. Among the provisions of Occupational Health and Safety in the FIDIC Red Book 2017 and the regulation of the Minister of PUPR Number 10 of 2021 are compatible and mutually reinforcing.Keywords: Comparison of Clauses; FIDIC; Occupational Health and Safety
ANALISIS PENERAPAN ISO 14001 UNTUK MENUNJANG KESELAMATAN KERJA PADA PT. UNITED STEEL CENTER MENGGUNAKAN METODE HAZARD IDENTIFICATION, RISK ASSESMENT AND RISK CONTROL (HIRARC) Naufal Fais Lazuardi
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5281

Abstract

PT. United Steel Center Indonesia-Karawang is a company engaged in manufacturing that focuses on blanking steel coins for automotive or non-automotive. The TKG and TWB departments were chosen to be the object of research based on data regarding the highest number of work accident incidents in 2021 and there are still manual processes involving humans. The method used is the HIRARC method, a method that combines hazard identification, risk assessment, and risk control to avoid or minimize work accidents. There are 3 problems that occur in the TKG department and 2 problems in the TWB department. Therefore, it is necessary to update the SOP, especially regarding the use of PPE, which replaces the safety hand and safety leg with a universal size so that it can adjust to the size of each employee's hands and feet, adding earmuff PPE for noisy work, wearing a Gas Respirator mask for anti-oiling work. rust, and the use of safety hands during the input welding process.Keywords: HIRARC; Work Accident ;PPE.
ANALISIS KUALITAS KINERJA PERUSAHAAN DENGAN METODE MANAGEMENT BY OBJECTIVES (MBO) PADA CV. WIDYA Muhammad Zidane; Ade Momon S
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5286

Abstract

The quality of employee performance can be generated by habits within the company. Various concept efforts are made to improve the quality of performance. Therefore, human resources need to be developed consistently to achieve the actual quality of performance. The purpose of this research is performance quality research at CV Widya based on employee performance appraisals from raw materials, production, packaging and distribution using the Management By Objectives (MBO) method which consists of Planning, Monitoring and Review. The results of the study are explained as a result of the analysis in the field during the research obtained suggestions including CV. Widya must maintain the quality of the company's performance, CV. Widya is expected to conduct regular evaluations, in the production and packaging processes. Based on the research results described earlier, as a result of the analysis of observations and interviews, it can be concluded that the quality of employee performance at CV Widya can be concluded to be effective based on employee performance appraisals using the Management By Objectives (MBO) method which consists of Planning, Monitoring and Review. Although there are some that must be corrected, it is quite mild to be corrected.Keywords: Management by objectives; Performance quality; Supply chain management
ANALISIS KEAKURATAN FORECAST RESIN ABS GRADE 500 322 MENGGUNAKAN PENDEKATAN MEAN ABSOLUTE PERCENTAGE ERROR (MAPE): STUDI KASUS INDUSTRI MANUFAKTUR PLASTIC COLORING DAN COMPOUNDING Dwi Irwati; Ade Nurul Hidayat
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5518

Abstract

The plastic resin coloring industry has a very important role in the molder supply chain. Materials must be imported from abroad with a long enough lead time, so material purchases are made based on the forecast provided by the molder. The constraints that occur are forecast inaccuracies which result in an increase in inventory level of material and a potential shortage of material at the customer. This research is a descriptive research with a quantitative approach, where the research method is carried out by interviews and literature studies. This research is aimed at measuring the extent to which forecast accuracy is carried out by molders using the MAPE (Mean Absolute Percentage Error) method, the results of the study show whether or not a forecast is feasible. The results of this study show an average MAPE of 36.5% so that it can be categorized as feasible. Even though the forecast is categorized as feasible, PT X must respond properly to this forecasting inaccuracy so that the supply to the molder is not disrupted. In this study, PT X had to make adjustments to the material arrival planaccording to the current month's material needs. On the other hand, it is no less important to carry out active communication and provide education to molders about the importance of forecast accuracy, so that it can provide benefits for the company itself and the molder.Keywords: Forecasting; MAPE; Molder
ANALISIS BEBAN KERJA MENTAL PADA DEPARTEMEN PRODUKSI DI PT. JAYA PRAKARSA MENGGUNAKAN METODE NASA-TLX Rafif Ghanduur Refanza; Kusnadi
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5560

Abstract

PT. Jaya Prakarsa is a manufacturing company that focuses on making packaging. Every day there are many custom orders by customers which result in many differences in the production process. This causes employees to have additional mental pressure and can result in stress at work. This study aims to reduce employee stress by using the NASA-TLX method and provide improvement solutions based on that method. NASA-TLX is a method of measuring mental workload by taking a questionnaire approach that will be distributed to employees in the Production Department. The figure obtained from the calculation results is 65.4 which is in the high category. After making observations using the results of the questionnaire, it is known that the factors that influence work pressure are the lack of work facilities, the minimum rest time obtained by employees, and the least motivation to work. The suggestions for reducing mental workload include adding facilities in the work area, increasing rest time, and providing activities that increase motivation for workers.Keywords: NASA-TLX, Mental Workload
LOAD PROFILE OF WORKFORCE USING WESTINGHOUSE METHOD IN WAREHOUSE WORK SYSTEM Sonny Aji; Aina Nindiani
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5603

Abstract

Workers play a crucial role in a company, and their workload significantly influences productivity. This research was conducted in a manufacturing company, specifically in the Warehouse Department (storage section), due to indications of low productivity. The research objective was to analyze the workload profiles of workers in the storage section of the manufacturing company’s warehouse. The analysis was conducted using the Westinghouse method, which considers skill, effort, condition, and consistency in analyzing work time. Cycle time to standard time was calculated considering rating factors and allowances. The research results revealed that the four workers in this section experienced workload levels of 68% for Worker 1, 28% for Worker 2, 57% for Worker 3, and 50% for Worker 4. Overall, the workers exhibited an underloaded workload profile. The highest underload was observed in Worker 2, indicating the lowest productivity among the four workers. Based on these findings, it is recommended to enrich the job tasks for workers in the warehouse or consider transferring them to other departments that require additional workforce to improve the current work system in the warehouse. Keywords: load profile; warehouse; Westinghouse; workload; work system
PERANCANGAN ALAT BANTU SCREEN SABLON YANG ERGONOMIS PADA AKTIVITAS WINDOW PATCING UNTUK MENGURANGI KELUHAN MOSCULETAL DISORDER DI PT. XYZ Sukma Kus Adhiyana Adhi; Afif Fawa Idul Fata; Rikzan Bachrul Ulum
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5633

Abstract

Work aids are tools used to make it easier for workers to carry out their daily activities to lighten a job. At PT XYZ found several complaints of muscle pain in several parts of the worker's body in the window patching section. To reduce the complaints experienced by window patching operators, the method used is the Standard Nordic Questionnaire and Ergonomics. This method is used to identify the source of the cause of muscle fatigue at work while ergonomics is used to determine the dimensions of the assistive devices to be designed according to human anthropometry. Calculation of the overall percentage of each of the questionnaire questions, obtained an average of the largest complaints on the body of the right upper arm by 68.8%, right elbow by 87.5%, right forearm by 81.3%, and wrist right hand by 87.5%. The results of making a manual window patching tool using the 50th percentile with a table height tool size of 88 cm, a tool width of 38 cm, a tool length of 43 cm, a beam width of 18 cm, and a pushing distance of 71 cm.Keywords: Tool Design; Window patching; SNQ; Ergonomics; Anthropometry
PENENTUAN RUTE TERBAIK PENDISTRIBUSIAN DENGAN METODE ANT COLONY OPTIMIZATION (STUDI KASUS PERUSAHAAN JASA PERGUDANGAN SPAREPART JAWA BARAT) Annisa Indah Pratiwi; Sri Sustariyah; Akda Zahrotul Wathoni; Sobar Pazri; Dimas Cheli Ahsanunadia
Industry Xplore Vol 8 No 2 (2023): Industry Xplore
Publisher : Lembaga Penelitian dan Pengabdian pada Masyarakat, Universitas Buana Perjuangan Karawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36805/teknikindustri.v8i2.5644

Abstract

This study aims to determine the best route for spare part product distribution. This research was conducted in one of the companies engaged in the production of spare parts, where in the company there is a Logistics department that functions to handle the product distribution process. In the process of distributing goods, costs are required. In addition, the trucks used in the process of distributing goods to each distributor go through different routes, so this research also aims to determine the best route based on the distance between locations. In order to obtain the best route, this research offers a solution using the Ant Colony Optimization (ACO) method by determining the route to be taken by the truck. The best route selection using the ACO algorithm uses the Traveling Salesman Problem (TSP) where one location point can only be made one visit. the best route results while the first cycle results are depots located in the area in the area of the best route V0-V4-V6-V2-V5-V7-V1-V8-V3-V0. That is the depot located in the Karawang area (V0) to MPP (V4), then to DAS (V6), then to KKI (V2), then to TBB (V5), then to MTN (V7), then to DYH (V1), then to MMH (V8), then to MSS (V3), and back to the depot (V0). The route covers a distance of 83 km. The route covers a distance of 255.5 km.Keywords: Ant Colony Optimization (ACO); Goods Distribution; Best Route

Page 1 of 1 | Total Record : 8