cover
Contact Name
Syapril Janizar
Contact Email
jurnaltekniksipilcendekia@gmail.com
Phone
+6289602817819
Journal Mail Official
jurnaltekniksipilcendekia@gmail.com
Editorial Address
Jl. Pahlawan No.69, Sukaluyu, Kec. Cibeunying Kaler, Kota Bandung, Jawa Barat 64987
Location
Kab. sumedang,
Jawa barat
INDONESIA
Jurnal Teknik Sipil Cendekia (JTSC)
Core Subject : Engineering,
JTSC: Jurnal Teknik Sipil Cendekia is published by Civil Engineering Study Program, Faculty of Engineering, Planning and Architecture, University Winaya Mukti. This peer-reviewed journal is designated to publish articles that report the results of research in civil engineering science. JTSC: Jurnal Teknik Sipil Cendekia invites particularly manuscripts or research-based articles in the diverse topics include functional areas of Transportation Engineering, Structure, Design road and Bridge, Geotechnic, Management Project, Contruction Management, Hydrology and Water Resources, Information Civil Technology (ICT), Entrepreneurship Civil Engineering and Engineering Economics. The manuscripts or research-based articles that will be accepted are qualitative, quantitative research and mixed method written either in Bahasa or English. We are the editorial team, welcoming the papers submissions from various audiences or professions such as researchers, academicians, students, practitioners, regulators and others who interested in Civil Engineering studies.
Articles 4 Documents
Search results for , issue "Vol 2 No 2 (2021): Juli" : 4 Documents clear
ANALISA FAKTOR-FAKTOR YANG PALING DOMINAN PENYEBAB KETERLAMBATAN PROYEK Yontavinus V. Nabut; Sebastianus B. Henong; Agustinus H. Pattiraja
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 2 No 2 (2021): Juli
Publisher : Faculty of Engineering, Planning and Architecture, Winaya Mukti University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (353.553 KB) | DOI: 10.51988/jtsc.v2i2.33

Abstract

The construction of construction projects in Kupang district is currently experiencing a very rapid development, many buildings and roads were built to accommodate the needs of the community. This research focuses on the factors that cause delays that occur in the construction project of the Pancasila Flobamora Monument. This research was completed using a questionnaire distributed to parties directly involved in the process of building the Flobamora monument of the Pancasila house. The results of the study found 5 factors that have the highest importance index value, namely: lack of work experience of masons (68.41%), the influence of rainy weather (66.90%), late delivery of equipment to the project location (52.36%), lack of work experience. field supervisors (43.63%), late payments by the owner (32.29%). Recommendations given are based on the delay that occurred in the construction project of the Pancasila flobamora monument, namely the lack of work experience of masons, Increasing supervision of the masons by increasing the workforce of the head of workers and foremen. The influence of rainy weather, it is better if overtime hours are applied when the weather conditions are not raining so that reduced production due to rain can be overcome, the lack of work experience of field supervisors, providing assistance and direction for less experienced field supervisors.
PENGARUH PENAMBAHAN SIRTU TERHADAP NILAI CBR SUBGRADE RUAS JALAN KOYA TENGAH DISTRIK MUARA TAMI KOTA JAYAPURA (QUARRY SIRTU HARAPAN KABUPATEN JAYAPURA) Alfian Adie Chandra
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 2 No 2 (2021): Juli
Publisher : Faculty of Engineering, Planning and Architecture, Winaya Mukti University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (617.29 KB) | DOI: 10.51988/jtsc.v2i2.34

Abstract

The problem of the bearing capacity of the subgrade is one of the most important thingsconsidered in a planning and work of a civil building construction. This matterbecause the soil functions as a medium that withstands the load or action of the constructionbuilt on it. Changes in weather and temperature in the field are factors that makeunstable ground. Many stabilizations have been carried out using cement soil, howeverrequires no small cost and also the results of the implementation of the soil stabilizationrelatively short-lived. Therefore, this research was conducted using a mixture ofsirtu with mixed variations of 15%, 20% and 30%. More variety of mixThe added sirtu causes the water content to decrease which will make the power value decreasethe bearing capacity of the soil increases, the value of the plastic limit increases, while the value of the liquid limit and indexthe plasticity of the soil decreases.
ANALISIS PENEMPATAN DAN PENENTUAN JUMLAH TOWER CRANE (TC) Syapril Janizar; Eko Rizky Suprapto
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 2 No 2 (2021): Juli
Publisher : Faculty of Engineering, Planning and Architecture, Winaya Mukti University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (550.06 KB) | DOI: 10.51988/jtsc.v2i2.35

Abstract

In the construction of Cable Stayed Bridge, the use of heavy construction equipment is absolutely necessary, especially required for positioning and selecting the type of Tower Crane in order to improve construction performance. Therefore, human resources and heavy equipment used in the construction process will significantly affect the period of project implementation. Proper planning of the location for various construction equipment is believed to be the key of efficiency and productivity. Tower Crane as the target optimization is one of the equipment that has a big role in transporting the materials for the construction of a multi- storey building so that it requires proper planning to be able to serve all points of demand from its position.
KAJIAN KAPASITAS TAMPUNGAN KOLAM RETENSI DI PERUMAHAN SARIMAS, KELURAHAN SUKAMISKIN, KECAMATAN ARCAMANIK, KOTA BANDUNG Bima Lutfi Fuad; An An Anisarida
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 2 No 2 (2021): Juli
Publisher : Faculty of Engineering, Planning and Architecture, Winaya Mukti University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (831.336 KB) | DOI: 10.51988/jtsc.v2i2.36

Abstract

The flood was triggered by a decrease in absorption zones as population growth, activity and land requirements for housing or economic activities increased. To overcome the flood, Bandung City created a conservation pond as one of the flood prevention measures designated as one of the most frequent flood forest prevention measures in Sarimas. The purpose of this study is to assess of the capacity of the retention pool in Sarimas housing, Sukamiskin sub-district, Arcamanik subdistrict, Bandung city.Based on a runoff discharge analysis conducted with rain on the 10-year obtained a maximum of water runoff discharge using the method of synthetic hydrograph unit (HSS) Nakayasu of 20.52 m3. The traceability of the flow path carried out still leaves a significant volume of the water tank, with the capacity of the outlet remaining up to 5.01 m3/s capacity for the pump.

Page 1 of 1 | Total Record : 4