cover
Contact Name
Muhammad Taufiq Fathaddin
Contact Email
muh.taufiq@trisakti.ac.id
Phone
+6285770946165
Journal Mail Official
jeeset_mtp@trisakti.ac.id
Editorial Address
Program Studi Magister Teknik Perminyakan (Master of Petroleum Engineering) Fakultas Teknologi Kebumian dan Energi Universitas Trisakti Gedung D Lantai 5 Universitas Trisakti, Jalan Kyai Tapa No.1 Grogol, Jakarta Barat, 11440, Indonesia.
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
Journal of Earth Energy Science, Engineering, and Technology
Published by Universitas Trisakti
ISSN : 26153653     EISSN : 26140268     DOI : https://doi.org/10.25105/jeeset.v1i1
Core Subject : Science,
This journal intends to be of interest and utility to researchers and practitioners in the academic, industrial, and governmental institutions.
Articles 6 Documents
Search results for , issue "Vol. 1 No. 1 (2018): JEESET-VOL.1-NO.1-2018" : 6 Documents clear
Well Test and Short Term Multiple Rate Flow Tests Analyses to Successfully Hydraulic Fracturing Program of Block X Muhammad Dimas Adiguna; Muhammad Taufiq Fathaddin; Hari Karyadi Oetomo
Journal of Earth Energy Science, Engineering, and Technology Vol. 1 No. 1 (2018): JEESET-VOL.1-NO.1-2018
Publisher : Penerbitan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (331.859 KB) | DOI: 10.25105/jeeset.v1i1.3032

Abstract

Well test analysis was conducted to determine the characteristics of reservoir rocks. From the well test analysis it is obtained information such as permeability and skin factor. The skin factor is a quantity indicating the presence of disturbance in the formation as a result of drilling operations, production operations, perforating casing, gravel pack installation, remedial well work, acidizing operation, and hydraulic fracture operation. The objective of this research is to determine the relationship of multi rate test method of Jones, Blount, and Glaze and the comparison result among pressure buildup test and pressure drawdown test analyses, using Kappa software or manually calculation. Therefore, in this paper will study the method of Jones, Blount, and Glaze and the well test analyses to determine further work of the wells on block X. The data used in this paper is secondary data, namely the results of well test from three wells.Applying drawdown test analysis of A, Y, and Z wells yield skin factor values of 3.37; 27.10; and -1.39. Where in buildup pressure Horner method analysis of A, Y, and Z wells yield skin factor values of 16.10; 11.18; and -2.07. In the method of type curve derivatives the drawdown analysis of A, Y, and Z wells yield skin factor values of 7.04; 11.18; and 4.20. The analysis of pressure buildup, of A, Y, and Z wells yield skin factor value of 25.11; 14.47; and 1.93. In the analysis using Kappa software of A, Y, and Z wells yield skin factor values of 5.56; 10.2; and 2.00. The skin results of these wells indicate the formation damages. The Short Term Multiple Rate Flow Tests analysis using Jones, Blount, and Glaze method from the plots of Δp/q versus oil flow rate (q) are b’ high and b’/b low. These indicate that the three wells are encountering formation damages. The Jones, Blount, and Glaze method as well as the pressure buildup and pressure drawdown test analyses in block X indicate that these wells require to be stimulated.
Engineered Fiber Based Lost Circulation Pill to Abridge Lost Circulation of Geothermal Well Apriyansah Toni; Astra Agus Pramana; Bambang Kustono
Journal of Earth Energy Science, Engineering, and Technology Vol. 1 No. 1 (2018): JEESET-VOL.1-NO.1-2018
Publisher : Penerbitan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (285.627 KB) | DOI: 10.25105/jeeset.v1i1.3033

Abstract

Loss circulation is a major problem and known as the biggest challenge during drilling and well construction.This can leadsto various consequences,such as stuck pipe, loss of material and time to combat the losses, and even losing the well itself. Severe loss circulation conditions are often met while drilling geothermal wells in Indonesia. Partial to total losses have start experienced since drilling the surface section. Cement plugs is one of the conventional methods to cure losses. Number of cement plugs differ from one well to another well. Even in some wells, number of cement plugs performed for loss circulation plug can be over 30 times with total of more than 4,000 barrels of cement slurry pumped. Solution other than basic loss circulation material and cement plug must be developed to optimize curing loss time. Engineered fiber base concentration which is include; Base Fluid, LCM and Solid Package was obtained from simulation, then trial and error in laboratory was conducted. Based on the final recipe, the control pill was able to hold pressure and not leaking, even when using 5 mm grid clearance. Additional combined stiff fiber and flexible fiber with concentration of 6 lbs/bbl sufficient to hold exessive loss circulation.
Optimization of Oil Production by Gas Lift Macaroni in “X” Field Chrismon Chrismon; R.S. Trijana Kartoatmodjo; Dwi Atty Mardiana
Journal of Earth Energy Science, Engineering, and Technology Vol. 1 No. 1 (2018): JEESET-VOL.1-NO.1-2018
Publisher : Penerbitan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (655.593 KB) | DOI: 10.25105/jeeset.v1i1.3034

Abstract

The background of this research was that in X Field many gas wells have stopped flowing years ago and not economical production anymore. Therefore the company has decided to use gas lift which is proper to the sandy oil reservoir characteristic. The tubing of the well has no gas lift mandrel completion as the well was a gas producer. The objectives of this research was that to design gas lift macaroni (GLM) to optimize oil production rate. The design of this  research was  that  the  new  slim tubing 1.315  inch, called as macaroni tubing, was installed inside  the existing 3. 5inch  tubing. The gas lift valves are installed inside macaroni tubing. The data collection consists of reservoir data, surface data, and well diagram.The result of this research was that the gas lift macaroni installation can generate oil production rate of 425 STB/day of the three wells. Gas lift valves of well A is four valves, well B is five valves, and well C is three valves. The deviation of software and manual calculation of valves depth is less than 1%. The cost saving by installing gas lift macaroni instead of workover operation to change the existing tubing with new tubing equipped with gas lift valves is USD 5,620,955 of three wells.
Effect of Conductive Minerals in the Determination of Water Saturation in “Y” Field Panduwinata Arifin; Ratnayu Sitaresmi; Benyamin Benyamin
Journal of Earth Energy Science, Engineering, and Technology Vol. 1 No. 1 (2018): JEESET-VOL.1-NO.1-2018
Publisher : Penerbitan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (409.535 KB) | DOI: 10.25105/jeeset.v1i1.3035

Abstract

Formation evaluation is a part of petroleum engineering to study reservoir characteristics as well as issues related to success in the discovery of hydrocarbon reserves. Hydrocarbon reserves are influenced by reservoir rock characteristics consisting of porosity (f), water saturation (Sw), and permeability (k.) In low resistivity regions are often found abnormalities in formation evaluation. The abnormality is a low resistivity value produced so that an inaccurate value obtained when water saturation is calculated. In this study, an evaluation process of the abnormality phenomena was performed on low resistivity areas. The evaluation is done by analyzing both log and core data. Evaluation in low resistivity areas aims to obtain a correction factor of the abnormality that occurs. Abnormalities in the calculation of resistivity values caused by the existence of conductive minerals which resulting in a decrease of the resistivity value of the formation. This correction factor can be used in Archie to calculate water saturations, therefore more accurate values of saturation were found.
Well Test Analysis Using Pressure Derivative Method at Gas Well X-1 Muhammad Handis Maulana; Muhammad Taufiq Fathaddin; Hari Karyadi Oetomo
Journal of Earth Energy Science, Engineering, and Technology Vol. 1 No. 1 (2018): JEESET-VOL.1-NO.1-2018
Publisher : Penerbitan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (659.233 KB) | DOI: 10.25105/jeeset.v1i1.3036

Abstract

Wells X-1 is a gas condensate well which located in lapangan X, Sulawesi Island. At well X-1 well test was conducted using pressure build up, where the analysis was conducted with objective to determine the reservoir characteristic of X-1 wells such as permeability, skin, flow efficiency and investigation radius. In the pressure build up test, the horner plot and derivation analysis using pseudo pressure and P2 approaches were applied with the gas well X-1 has a reservoir pressure of 2555 psia. The analysis is done using saphir 3.20 and Ms.Excel software where the results of the counsel to see if there is any possibility of formation damage. X-1 is also known as homogeneous with a fault boundary present in the fault located at a certain distance from the well X-1 in which the fault is only one direction from the reservoir. The pressure derivative plot analysis was conducted with two methods such as two-point method and three-point method, where the result of the overlay of the derivative curve corresponds to the deviation of the calculation result method which is less than 10%. The horner plot analysis is also done with the ψ(P) pseudo pressure and P2 approach which is the result of horner plot analysis using pseudo pressure ψ(P) pseudo pressure in saphir 3.20 obtained the slope (m), permeability, and skin values respectively were 3.22432E + 5 psi2/cp, 132 mD, and 21.6, whereas Ms.Excel results obtained the price of slope (m), permeability, and skin respectively were 320890.61 psi2/cp, 134.83 mD, and 21.1. To analyze the horner plot using the P2 approach at saphir 3.20 the value of slope (m), permeability, and skins values respectively were 5495.07 psi2/cp, 125 mD, and 21.3 and for the results of Ms. Excel the price of slope (m), permeability, and skin respectively were 5451.66 psi2/cp, 147,29 mD, and 20,1. Positive skin results in both methods of horner plot and derivative plot indicate the well is damaged and need to be stimulated.
Benefit-Cost Analysis in Infrastructure Development of Coal Railway Transportation in East Kalimantan Province Mustamina Maulani; Dinda Annissa Larasati; Yanif Dwi Kuntjoro
Journal of Earth Energy Science, Engineering, and Technology Vol. 1 No. 1 (2018): JEESET-VOL.1-NO.1-2018
Publisher : Penerbitan Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (754.984 KB) | DOI: 10.25105/jeeset.v1i1.3037

Abstract

Benefit-Cost Analysis (BCA) is an analysis of the calculation of benefits and cost of development plans that are used to make public decisions that will impact on the welfare of society. East Kalimantan provincial government is building railway infrastructure in cooperation with PT. Railway Borneo (PT KAB) representative for Indonesia from Russian Railways (RZhD) to transport coal. This study analyzed the benefits and costs derived from the construction of the railway was based on economical factors. Is expected to enhance regional energy security. And cost benefit analysis used to evaluate the use of economic resources so that scarce resources can be used efficiently, because the government has many programs or projects to be implemented while the costs are very limited. Benefits to the railway infrastructure development projects for the coal sector in the province of East Kalimantan, among others, have environmentally friendly energy infrastructure in the context of national development in accordance with RPJMN. Increase national income for central and local governments due to the stimulation of high import. Increased foreign or local investors to be able to invest in Indonesia. Coal transportation cost savings, time savings and ease of delivery of coal, and create new jobs that can impact on people's welfare. Costs arising from the construction of the railway to the coal sector by, among others, the cost of investment incurred for the construction consisting of maintenance costs, costs of operations and so forth, open land, government regulations overlap, the surrounding environment. and maintenance costs and provide guidance on the surrounding community.

Page 1 of 1 | Total Record : 6