cover
Contact Name
Muhammad Fahmi Hakim
Contact Email
fahmi@polinema.ac.id
Phone
+62341-440424
Journal Mail Official
elposys@polinema.ac.id
Editorial Address
UPT-P2M Politeknik Negeri Malang Gedung Graha Polinema Jalan Soekarno - Hatta No. 9 Malang, 65141
Location
Kota malang,
Jawa timur
INDONESIA
ELPOSYS: Jurnal Sistem Kelistrikan
ISSN : 2407232X     EISSN : 24072338     DOI : https://doi.org/10.33795
ELPOSYS adalah jurnal nasional yang menyediakan sumber informasi ilmiah bagi peneliti dan akademisi, lembaga penelitian, lembaga pemerintah, dan industri. Kami menerbitkan research papers, review articles, dan case studies yang berfokus pada bidang ketenagalistrikan serta topik yang terkait. Semua makalah di-review oleh setidaknya dua reviewer. ELPOSYS diterbitkan oleh UPT – P2M Politeknik Negeri Malang dan diterbitkan tiga kali setiap tahun, yaitu Bulan Februari, Juni, dan Oktober. Artikel yang dipublikasikan bidang ilmunya sesuai atau relevan dengan topik-topik Jurnal ELPOSYS yang meliputi bidang (namun tidak terbatas pada): - Pembangkit, - Distribusi dan Transmisi Daya, -Konversi Daya, - Sistem Proteksi, - Transformator, - Teknologi Instalasi Listrik, - Kualitas Daya, - Aplikasi Teknologi Informasi pada Sistem Daya, - Aplikasi Kontrol Cerdas pada Sistem Daya, - Teknologi Pembangkitan berbasis Energi Terbarukan, - Mesin-mesin Listrik, - Pemodelan dan Simulasi Sistem Daya, - Elektronika Daya, - Pengukuran Besaran Listrik, - Kestabilan Sistem Daya, - Topik lain yang terkait.
Articles 112 Documents
Metode Jaya Sebagai Penentuan Posisi dan Ukuran Besaran Kapasitas Distribution Generation Pada 117 Bus Mas Ahmad Baihaqi; Eva Kurnia Yulyawan
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 1 (2022): ELPOSYS vol.9 no.1 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (518.819 KB) | DOI: 10.33795/elposys.v9i1.604

Abstract

Penggunaan Metode JAYA ini merupakan usulan pada penelitian yang di lakukan, sebagai pilihan metode untuk optimasi penentuan dimana nantinya Distributed Generation (DG) di letakkan selain penentuan lokasi juga akan di tentukan besarannya juga, pengaplikasian ini dipakai untuk sistem distribusi 20kV 117 bus dengan saluran sepanjang 59,65 km, bertujuan untuk mengurangi rugi rugi daya juga sebagai penentuan besarnya kapasitas Distributed Generation (DG) yang akan dipasang nantinya. Algoritma ini telah berhasil menentukan besar kapasitas Distributed Generation (DG) dan pada titik dimana posisi paling tepat pada 117 bus di penyulang pujon.
Uji Kemampuan RPM Motor DC Permanen Baldor dengan Sumber Daya Solar Cell Monocristallin 50WP Mas Ahmad Baihaqi; Eva Kurnia Yulyawan
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 1 (2022): ELPOSYS vol.9 no.1 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (561.653 KB) | DOI: 10.33795/elposys.v9i1.605

Abstract

Memanfaatkan energi alternatif cahaya matahari sebagai salah satu solusi untuk mengurangi pemakaian energi fosil yang tidak bisa di perbarui, Solar cell 50 wp sebagai sumber daya untuk menguji kecepatan serta kekuatan motor DC magnet permanen baldor, pengujian dilakukan dengan metode memberi beban semakin bertambah, dengan pengujian ini di harapkan RPM sebelum ada beban maupun semakin bertambah beban kekuatan motor dc permanen baldor tidak mengalami drop RPM, dengan harapan hasil uji nanti bisa dimanfaatkan untuk pengembangan penelitian selanjutnya pada pengembangan transportasi yakni mobil listrik tenaga surya dengan modul photovoltaic, motor dc magnet permanen baldor.
Perancangan Mesin Bor Otomatis Menggunakan PPI 8255A Sebagai Interface Mas Ahmad Baihaqi; Eva Kurnia Yulyawan
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 1 (2022): ELPOSYS vol.9 no.1 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (462.506 KB) | DOI: 10.33795/elposys.v9i1.606

Abstract

Stepper motor adalah salah satu yang sesuai dengan permintaan/permintaan diatas, karena stepper motor memungkinkan sinyal digital dikonversikan secara langsung kedalam suatu gerakan posisi (perubahan sudut).Dalam Penelitian ini dilakukan pengontrolan untuk stepper motor dengan menggunakan Personal Computer sebagai pengontrol yang di interfacekan dengan menggunakan PPI 8255A pada sistem penggerak mesin bor PCB. PPI 8255A dalam sistem ini dibantu oleh beberapa komponen tambahan yaitu beberapa driver dan celenoid. Pada peralatan pengebor PCB ini terdapat 3 arah gerakan yaitu x,y,dan z. Gerakan x dilakukan oleh motor stepper I, gerakan y dilakukan oleh motor stepper II,sedangkan gerakan z dilakukan oleh selenoid, dengan hal-hal tersebut sehingga peralatan pengebor ini bisa bekerja.
Studi Evaluasi Pengetanahan Gardu Induk Dengan Adanya Perubahan Tegangan Sistem Dari 70 kV Menjadi 150 kV Eva Kurnia Yulyawan; Mas Ahmad Baihaqi
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 1 (2022): ELPOSYS vol.9 no.1 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (360.498 KB) | DOI: 10.33795/elposys.v9i1.607

Abstract

Pengetanahan peralatan pada Gardu Induk mempunyai peranan yang sangat penting karena menyangkut keamanan manusia dan peralatan. Salah satu peristiwa yang sering terjadi di Gardu Induk yaitu gangguan fasa ke tanah yang akan menyebabkan mengalirnya arus gangguan pada bagian peralatan dan ke piranti pentanahan. Hal ini akan menimbulkan gradien tegangan antara peralatan dengan peralatan, peralatan dengan tanah dan gradien tegangan pada permukaan tanah itu sendiri yang berbahaya bagi keselamatan manusia yang berada di area Gardu Induk. Sistem pengetanahan ini diharapkan akan memperoleh gradien tegangan yang merata (uniform) dalam semua bagian struktur dan peralatan, dan juga agar manusia yang berada di daerah instalasi itu berada pada potensial yang sama dan tidak berbahaya setiap waktu. Dengan adanya rencana perubahan kapasitas Transformator daya di Gardu Induk dari Transformator sistem 70 kV menjadi 150 kV, maka perlu adanya evaluasi kembali terhadap sistem pengetanahan peralatannya apakah masih memenuhi syarat-syarat teknis yaitu tingkat keamanan yang sesuai atau yang diizinkan bagi manusia ataupun peralatan di dalam suatu Gardu Induk.
Profil Tegangan Surja Petir pada Generator Impuls RLC Sebagai Simulasi Tegangan Lebih Kumala Mahda Habsari; Hanifiyah Darna Fidya Amaral; Hafizh Farhan
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 1 (2022): ELPOSYS vol.9 no.1 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (428.955 KB) | DOI: 10.33795/elposys.v9i1.608

Abstract

Gangguan tegangan lebih pada jaringan listrik umumnya disebabkan oleh dua macam tegangan transient yang berasal dari luar atau dari dalam sistem itu sendiri. Jenis gangguan dari luar ini biasanya disebabkan oleh sambaran petir. Gangguan tegangan lebih yang berasal dari petir dapat menjadi ancaman berbahaya bagi jaringan listrik, instalasi listrik dan peralatan listrik.. Tegangan impuls yang dibawa oleh petir memiliki amplitudo sangat besar. Pada skala laboratorium, tegangan impuls dapat dibangkitkan hingga 1000 kV. Gelombang tegangan tinggi impuls yang dihasilkan oleh generator impuls memiliki karakteristik durasi yang pendek antara mikro detik hingga beberapa puluh mikro detik. Perancangan simulasi pembangkitan tegangan tinggi impuls dengan rangkaian generator impuls RLC dilakukan dengan tujuan untuk menyimulasikan tegangan lebih yang berasal dari surja petir. Profil tegangan yang dihasilkan diamati dan dianalisa. Rangkaian generator impuls RLC disimulasikan dengan dua variasi tegangan keluaran yang berbeda, yaitu 1 kV dan 10 kV. Profil tegangan yang dihasilkan oleh generator impuls RLC dengan tegangan keluaran 1kV dan 10 kV memiliki bentuk yang mirip dengan profil tegangan generator impuls RLC yang ada pada standar IEC 61000-4-5. Hal ini menunjukkan bahwa rangkaian generator impuls RLC yang disimulasikan berhasil dijalankan sesuai standar.
Rancang Bangun Alat Deteksi Sag Tegangan Menggunakan Sistem Data Logger Arizal Maulana Pratama; Ferdian Ronilaya; Ajeng Bening Kusumaningtyas; Sapto Wibowo
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 1 (2021): ELPOSYS vol.8 no.1 (2021)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (657.677 KB) | DOI: 10.33795/elposys.v8i1.609

Abstract

-This research discusses the design and manufacture of a voltage sag detection device using a data logger system. Voltage sag detection device to detect the presence of voltage sag which is one of the power quality problems in industrial electrical systems. Voltage sag can cause disturbances in electronic components that are sensitive to changes in voltage values. In this device, the voltage sag is detected using a voltage sensor by reading the RMS voltage from the PLN 220V AC source, then it is converted into a digital signal. The digital signal is sent to the ESP32 module to be processed and outputs a voltage value which is then displayed on the LCD Display. The voltage value data collection is carried out every <10ms and the data taken is the voltage value <90% of the rms voltage. The data taken is then saved to a micro SD card and displayed on the LCD Display. Several tests were carried out to ensure the performance of the voltage sag detector as designed. By switching the 110 / 220VAC transformer connected to the voltage sensor for 10 seconds, 12 seconds and 17 seconds. Based on these tests, the voltage sag detector can read and store the voltage sag data when the voltage read is below 90% of the rms voltage.
Studi Penambahan OCR dan GFR Gardu Hubung Gondol untuk Mengurangi Gangguan Meluas Penyulang Banyupoh Asfari Hariz Santoso; Masramdhani Saputra; Rachmat Sutjipto
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 2 (2022): ELPOSYS Vol. 9 No. 2 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (726.906 KB) | DOI: 10.33795/elposys.v9i2.612

Abstract

At the Banyupoh Feeder there is a Gondol Hubung Substation, which has 2 outgoings, the first line goes to the Banyuwedang Feeder and the second line goes to Penyabangan. However, because there is no protection on the outgoing side, if there is a disturbance in the first section on one of the outgoing sides, it will cause 1 feeder with a total of 49 transformers to experience a blackout. To overcome this condition, it is necessary to add relays at the substation. After the addition of relays at the substation, the impedance and short-circuit current are recalculated which can be used to determine the timing of the OCR and GFR relays at the new substation for each outgoing. The calculation results are then converted into a curve to determine the coordination of the protection with the existing protection relays on incoming, outgoing and recloser in anticipating disturbances in the first section at the Banyupoh Feeding Substation. After setting the protection relay on the outgoing side of the substation, the outage area due to interference can be minimized. When section 1 of the Banyuwedang Feeder is disturbed, the relay on the outgoing Gondol Substation will work so that the Energy Not Served (ENS) which was previously 40.008 kWh becomes 20.511 kWh. If section 1 of the Feeding Feeder is disturbed, then the relay on the outgoing Substation Hubung Gondol will work so that the ENS which was previously 40.008 kWh becomes 19,497 kWh, so that the amount of energy that is not channeled is reduced by 50% and this makes the service better.
Otomatisasi Mesin Gergaji Kayu Berbasis PLC Tresna Umar Syamsuri; Mohammad Noor Hidayat; Harrij Mukti K.; Rohmanita Duanaputri
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 2 (2022): ELPOSYS Vol. 9 No. 2 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (768.974 KB) | DOI: 10.33795/elposys.v9i2.613

Abstract

The timber industry in the process of cutting is done several types of sawing machine that has been designed in accordance with the needs of use facilitatein the process of cutting. Besides the saw machine simplifythe work given the limited ability of the power human beings either in the form of materials to be cut and safety work of employees. If the company is just a racket manpower is very limited, so to increase that efficiency desirable will be difficult to achieve, therefore required appropriate technology to help improve the eficiency. Technology that can help is to use shawmill machine automatically. In the process of sawing there are several types of sawmill such as: disc saw, bandsaw, in this case the writer uses bandsaw, adjusted with observation data with the power of 22 Kw saws and at the train with power of 1.5Kw. In the manufacture of this control the autor uses the HMI program in the process of controlling the engine from a distance, and operates it. Inside the HMI can be seen on a running machine and a machine that is a trouble.
Analisis Pengaruh Harmonisa Terhadap Losses Transformator 500kVA Rachmat Sutjipto; Wijaya Kusuma; Kemal Zulfianta
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 2 (2022): ELPOSYS Vol. 9 No. 2 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (822.553 KB) | DOI: 10.33795/elposys.v9i2.614

Abstract

With the non-linear load at the State Polytechnic of Malang, it has an impact on the emergence of harmonics and the appearance of currents in the neutral wire, rising temperatures in conductors and losses in transformers.In this study, several THD analyzes were carried out in accordance with the IEEE 519-1992, including neutral current analysis, losses analysis before and after being affected by harmonics, derating analysis and alternative mitigation methods to reduce these harmonic levels. Based on observational data on 500kVA transformers at UPT PP Polinema, it is known that the highest THDi current is 14.5% and exceeds the IEEE 519-1992 standard (12%). As for the THD voltage, the harmonic is 1.87% and is below the standard (5%). Based on the analysis results, it is known that the value of losses from the neutral current is 0.096 kW. It is also known that the total loss is 1.24kW (the PCu loss is 1.2kW and the PFe loss is 0.04 kW. Based on the SPLN 50 standard in 1997, the total allowable losses are 6.6 kW and 7.84 kW after being affected by harmonics, so the total loss of the measurement results is below the standard. From the analysis, it is also known that the derating will occurs in due to harmonics is 71.6 kVA or 14.32% of the transformer capacity. So to reduce the amount of THD current a mitigation is needed in the form of installing a filter that is used to suppress harmonic currents to meet existing standards.
Analisis Penggunaan Energi Listrik di Gedung Instalasi Bedah Sentral dan Perawatan Intensif Slamet Nurhadi; Heri Sungkowo; Nunun Setyo Nadia Putri
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 2 (2022): ELPOSYS Vol. 9 No. 2 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (198.64 KB) | DOI: 10.33795/elposys.v9i2.615

Abstract

Energy audit is a technique for calculating Energy Consumption Intensity (IKE) and aims to determine the energy use profile of a building and seek efforts to increase energy efficiency without reducing the comfort level of the building. The analytical method used is to make observations at Waluyo Jati Hospital by measuring the building area and ensuring appropriate lighting. Based on the Initial Energy Audit (AEA) which has been calculated and measured, the value of the intensity of energy has not met the standard because it is below the IKE standard for hospitals, which is 32.90617486 kWh/m2 on account calculations and 31.51399876 kWh /m2 on measurements that have been made, while the hospital IKE standard is 380 kWh/m2. The lighting system in the building still does not meet the standard of lighting strength according to the Regulation of the Minister of Health of the Republic of Indonesia No. 7 of 2019 concerning hospital environmental health. And for the lighting system it is not optimal and efficient, where the power consumption before repair according to the calculation is 4343.04 kWh, while after repair it becomes 4181.76 kWh / month 4343.04 kWh. The way to make energy use more efficient is to utilize natural light from the sun and change lamps and install energy-saving stickers in every corner of the room in the Central Surgical Installation and Intensive Care building at Waluyo Jati Kraksaan Hospital

Page 1 of 12 | Total Record : 112