cover
Contact Name
Purwanto
Contact Email
garuda@apji.org
Phone
+6289682151476
Journal Mail Official
info@aritekin.or.id
Editorial Address
Perum Cluster G11 Nomor 17 Jl. Plamongan Indah, Kadungwringin, Pedurungan, Semarang, Provinsi Jawa Tengah, 50195
Location
Kota semarang,
Jawa tengah
INDONESIA
Venus: Jurnal Publikasi Rumpun Ilmu Teknik
ISSN : 30315026     EISSN : 30313481     DOI : 10.61132
Engineering Science Clump. include the sub-groups of Civil Engineering and Spatial Planning, Industrial Engineering, Electrical and Computer Engineering. The Research Journal of the Engineering Science Clump
Articles 119 Documents
Rancang Bangun Smart Door Access Berbasis Fingerprint untuk Keamanan Ruang Laboratorium Zeluyvenca Avista; Oldy Fahlovi
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.73

Abstract

Laboratory space is a place to store important assets, so security is an important factor. The application of technology is needed to help security in the laboratory space. In addition, with various technology options, it is necessary to consider human errors that often occur. The use of smart door access with a mechanism using a fingerprint sensor is determined due to security considerations and minimizing human error. Security is guaranteed because only registered fingerprints can access the room. The microcontroller uses Arduino Uno as a system driver that has been programmed in the Arduino IDE. The system works according to the function where the outer door uses a fingerprint sensor while the inner door uses a touch sensor to move the solenoid door lock. Three variations were carried out, namely clean fingers, dusty fingers and wet fingers to observe fingerprint performance. The fingerprint sensor works quickly when the finger is clean then the finger is wet and finally the finger is dusty. The length of time the solenoid door lock opens when the smart door access system is operated according to the settings in the Arduino IDE program.
Menjaga Serta Mengoptimalkan Keseimbangan Translasi Dan Rotasi Dalam Sistem Pengendali Listrik Untuk Meningkatkan Kinerja Perangkat Elektro Rayhendi Alvio
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.76

Abstract

In this review, the creator features research on multiple ways of enhancing the improvement of electrical control framework execution in working on the exhibition of electrical gadgets. This examination plans a voltage stabilizer utilizing a Programmable Logic Controller (PLC) TM221ME16R with a comparator framework. The assessment procedure utilized is to utilize a composed study by taking a gander at books, journals and different works that can be utilized as purposes behind research, with instructive arrangements it will fabricate researchers' understanding and foster data about the issues brought up in the exploration. The technique in view of enhancement with these limitations has likewise been applied to agent electric power frameworks. The adequacy of these devices in working on the unique execution of the framework has been affirmed through the aftereffects of eigenvalue computations. Further confirmation has likewise been brought out through time-area reproductions where shortcoming conditions have been utilized to start framework homeless people.
Analisis Keseimbangan Operasional Proses Kalibrasi Menggunakan Metode Line Balancing: (Studi Kasus: PT Pal Indonesia) Rafi Danendra Adiatma; Yekti Condro Winorsito
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.78

Abstract

Company PT. PAL Indonesia is a manufacturer of Indonesian Defence system equipment which is especially in the largest marine sector in Indonesia. In addition, PT. PAL Indonesia has 22 divisions. One of them is the Technology & Quality Assurance Division. One element that requires precise and accurate measurement is calibration. In the operational balance the calibration process is the key to overcoming the calibration request in the department. This research uses the line balancing method to determine the process time from the beginning to the end of the calibration process. The results obtained from the balance delay method are line balancing methods, in the previous company condition of 77% and after the improvement has been reduced to 5%, it can be concluded that the balance delay has decreased so that the performance is better. Meanwhile, in the Smoothness Index, the results that are known in the company's previous condition are 9 minutes and the results obtained after the repair are 3 minutes with the position weight method (Ranked Positional Weight) getting the late operation speed is 160 minutes so that it is used as a cycle time in the calculation of this method in the process of knowing the calibration work from the beginning to the end.
Penerapan Metode Six Sigma dan Failure Mode Effect Analyze Untuk Meminimalisasi Defect di PT. ABC Handy Natan Permana; Dwi Sukma Donoriyanto
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.79

Abstract

This study aims to determine the number of rejected products (products that do not meet consumer and company standards) for 220 mL cup products using the six sigma method with 5 stages (define, measure, analyze, improve, and control) which will then be given improvement recommendations using failure mode effect analyze (FMEA). After going through the calculation process, it is known that the company's Deffect Per Million Opportunity (DPMO) value is 3.67 which indicates that the percentage of production without deffects is 96.32%. There are four critical to process (CTQ) in the 220 mL cup defect and the largest is the skewed seal with a percentage of 70%. The results of calculations using risk priority number (RPN) found recommendations in the form of corrective actions in 80% of the group of causes of oblique seal deffects so that it is hoped that the company will review and make improvements to the proposal so as to reduce deffects per million opportunity (DPMO) in the 220 mL cup production unit.
Upaya Meminimalisir Tingkat Cacat Proses Produksi Pada Fabrikasi Pipe Support MSP – Triraya Menggunakan Metode Fishbone Diagram Dan 5w + 1H Sajidah Tiara Ayu Wiranda; Iriani Iriani
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.82

Abstract

Quality is an important factor in production, so companies must maintain the quality of their products in order to be able to compete in the market. One of them is PT. Swadaya Graha operates in the construction and fabrication services sector, working on several projects, one of which is pipe support. In pipe support fabrication there are problems during the production process. This problem is the presence of "scratch" defects on the surface of the material. The aim of the observations carried out is to minimize the occurrence of production process defects in pipe support fabrication. From the results of the analysis using a cause-and-effect diagram, there are 3 factors that cause defects. And improvement efforts to minimize defects using the 5W + 1H method. Keywords: Cause-Effect Diagram, Defects, Scratch, 5W + 1H Method.
Pengukuran Dan Analisis Produktivitas Menggunakan Metode Objective Matrix (Omax) di Unit Produksi Workshop Putar PT Xyz Vina Sabrina; Rizqi Novita Sari
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.86

Abstract

Productivity is an indicator of a company's performance. In 2021 to 2023, a precast concrete construction and manufacturing company had difficulty achieving its spun pile production target of 3,480 tons/month. This condition causes the company's productivity to fluctuate and tend to decrease overall. This study aims to evaluate the decline in productivity by measuring the value of productivity based on 3 criteria, namely material, labor and machine criteria. The method used is Objective Matrix (OMAX). The productivity value in the production years 2021 to 2023 fluctuates with a downward average value. The highest productivity value in the 2021 production year occurred in period 8 with a value of 748 while the lowest productivity value occurred in period 6 with a value of 170. The highest productivity value in the 2022 production year occurred in period 21 with a value of 638 while the lowest productivity value occurred in period 14 with a value of 166. The highest productivity value in production year 2023 occurs in period 26 with a value of 966 while the lowest productivity value occurs in period 27 with a value of 0. Criteria that contribute less to productivity and need to be improved are labor criteria that show values below the average. While the material and machinery criteria show values that tend to be below average. While the material and machine criteria show values that tend to be good, with the application of OMAX, PT XYZ can improve partial productivity and total productivity in the future and identify factors that cause a decrease in productivity.
Analisis Pengaruh Job Description Terhadap Kepuasan Karyawan PT. XYZ Earliawan Muhammad Irbah Zain; Minto Waluyo
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.94

Abstract

Job Descriptions contain descriptions of certain jobs that are really needed for all corporate organizations in any industry. The purpose of this research is to find out how the job description influences the job satisfaction of PT XYZ employees. The population in this study were 40 PT XYZ employees as samples. The data collection method was carried out through distributing research instruments and direct observation. Then the data was tested using simple linear regression. Data analysis shows that there is a significant influence between job descriptions and employee job satisfaction. Indicated by a smaller significance value and a larger f count, it can be concluded that the job description variable has an influence on employee job satisfaction.
Improvement Productivity Menggunakan Metode Time And Motion Study Pada Area Line F PT KHI Aditya Aprodicto Bestafirli; Joumil Aidil Saifuddin
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.95

Abstract

PT KHI is a company operating in the food and beverage industry in Indonesia. In production activities there are many factors that can hinder performance productivity. Worker productivity is a value that cannot be seen directly except through a calculation process, so the worker productivity value is calculated from the company PT KHI. This research was carried out in the Production department using the Time and Motion Study method with a Lean Manufacturing approach, namely waste or extravagance to increase labor productivity in the Production department area. This time it was carried out directly by means of field observation. So that primary data is obtained. The results were obtained in the form of recommendations for improvement, namely: adjusting the total headcount in the line F area from previously 7 headcounts to 6 headcounts and moving several tasks from the carton sealer operator to each operator in the packing area of ​​line F, then classifying them into 3 headcounts for the packing section and 3 headcounts for the packing section. . It can be concluded from the results of this research that one type of waste is eliminated, namely adjusting the number of operators in the packing line F area so that before the improvements, labor productivity is 71.71% on line F and after labor productivity is 83.63%. By making improvements, cost savings of IDR 4,515,133 were obtained for 26 working days.
Pengaruh Model Pembelajaran Berbasis Proyek Terhadap Hasil Belajar Pada Mata Pelajaran Gambar Teknik Manufaktur Kelas XII Di SMK Semen Padang Husnul Fiqri; Eko Indrawan; Refdinal Refdinal; Rahmat Azis Nabawi
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.96

Abstract

This study aims to analyze the project-based learning model on learning outcomes in class XII Manufacturing Engineering Drawing subjects at SMK Semen Padang. The type of research used in this study is Quasy experimental using one experimental class and one control class. The study involved 20 experimental class students and 20 control class students. Data was collected with test questions in the form of pre-test and post-test to determine learning outcomes in aspects of Knowledge (cognitive), and assessment of student performance to determine learning outcomes in aspects of skills (psychomotor). Analyze the initial data to determine the average of the classes to be used for the determination of the experimental class and the control class. The final data analysis used is the T test. The results showed a significant influence on learning outcomes using a project-based learning model. The results of the T test on the Post-test results obtained a sig (2-tailed) value of 0.004 which is smaller than 0.05 with an average percentage of 71.8 in the Experiment class and 65.1 in the control class. For the T Test on student performance assessment, a sig (2-tailed) value of 0.027 is obtained which is smaller than 0.05. Both T-tests prove that project-based learning models can provide better learning outcomes.
Improvement Productivity Menggunakan Metode Time Motion Study Pada Area Dissolving Soy PT XNX Brivan Ardhandy Studynka; Enny Aryanny
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 1 (2024): Februari : Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i1.100

Abstract

PT XNX is a leading company operating in the food and beverage industry in Indonesia. This company produces based on demand, so the level of employee performance productivity is very important. There are many factors that influence worker productivity, such as experience, knowledge, and age. This research was conducted in the production department for 5 (five) months. The primary data collection method is by making direct observations in the field and using the time and motion study method, a systematic study of work systems with the aim of developing better systems and methods, standardizing systems and standards for determining time standards and selecting operators with a Lean Manufacturing approach, namely waste. or waste to increase labor productivity in the Production department area. The results were obtained in the form of recommendations for improvement, namely by optimizing productivity by means of operator efficiency from initially 6 people to 5 people, where before improvements were made, labor productivity was 53.11% in dissolving soy sauce, after improvements were made, labor productivity was 74.84. %. This has an effect on cost savings of IDR 4,515,133 for 26 working days, each day amounting to IDR 173,548. Therefore, there are 3 shifts in one day, so the total daily income is IDR 520,644 or a cost savings of 16.63%.

Page 1 of 12 | Total Record : 119