Analysis of Factors Affecting Operator Performance with Partial Least Square Approach Tommy Ivantoro; Bambang Syairudin
IPTEK Journal of Proceedings Series No 3 (2020): International Conference on Management of Technology, Innovation, and Project (MOTIP) 2
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i3.11072

Abstract

UP PT is unable to meet the targets set in the SdOF, SOF, and PS categories. There are several things that cause it, such as High Pressure Heater leakage, and boiler pipes leakage. Coal switching which also have an impact on the frequent occurrence of derating and human error. This condition is defined by operator incompetence, there is an increase in the number of late for work in 2018. Study conducted to improve operator performance. The questionnaire was used as a medium for data collection of the entire population at UP PT since analyzed with the Partial Least Square method. The results shows compensation variables, organizational culture, training effectiveness had a significant influence on employee performance with and without mediated by work motivation. Therefore, the company carries out performance improvement related to compensation through dispensation arrangements, leave, improvement of supporting facilities. It organize operational safety standards for workforce formation, conducting work instructions review for the organizational culture. The allocation of bussiness trip and basic maintenance for training effectiveness. Then work motivation by setting talent criteria that consider to the preparation of outstanding candidates.
Determination Program Priority by Applying Variance Analysis Method in Controlling Electricity Main Supply Cost Danang Mustika Widya; Bambang Syairudin
IPTEK Journal of Proceedings Series No 3 (2020): International Conference on Management of Technology, Innovation, and Project (MOTIP) 2
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i3.11068

Abstract

PT. ABC is a State-Owned company managing the electricity sector to meet the needs of the community in providing electricity in Indonesia. Electricity is a commodity that effects the lives of many people, so the basic electricity tariff (TDL) to the community is determined by the government. On the other hand, PT ABC's electricity main supply cost (BPP), are the responsibility of PT ABC itself. The achievement of PT ABC's profits is largely determined by how the BPP is managed and controlled. As of March, the BPP target of the PT ABC power plant managed by PT XYZ was not achieved with an increase in deviation of 27.47 Rp/kWh. The causes of and solutions to the increase in BPP could not be known immediately because PT XYZ did not yet have an analytical method that could explain the causes and their proportions to the increasing deviation comprehensively. Therefore, this study is conducted using the Variance Analysis method in the selection process. The result of this study is the development of BPP controlling method by identifying the BPP component deviations from the predetermined standard costs and suggesting better decision making in prioritizing the work program.
Modeling Priority Maintenance Cost Based on Top-Down and Bottom-Up Approach with Reconciliation of Forum Group Discussion Mohammad Fauzan; Bambang Syairudin
IPTEK Journal of Proceedings Series No 3 (2020): International Conference on Management of Technology, Innovation, and Project (MOTIP) 2
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j23546026.y2020i3.11165

Abstract

PT XYZ engaged in the electricity industry, which has a strategic issue that’s reduction of BPP (Cost of Providing) electricity as one step in supporting the holding company policy. With the target of reduction BPP, where one component of the BPP is maintenance costs. This research shows the priority of maintenance costs of each Units that can be used in the drafting of the RKAP. In order to prioritize maintenance costs, it is necessary to compile an analysis of the cost, start from the proposed maintenance costs of each unit (using the bottom-up method) until evaluating cost from management (using the top-down method). This top-down method is strengthened by the analysis of priority maintenance costs from the expert's view using the Analytical Hierarchy Process (AHP) method with the Expert Choice V-11 Software tool. Then the results of prioritizing maintenance costs from the bottom-up and top-down methods are carried out reconciliation through Forum Group Discussion (FGD). Based on the results, that the highest weighting factor was Productivity (0.616), followed by Area (0.320), Specifications (0.064). Whereas the sub factor that is very dominant globally is having low production costs and the highest priority Unit for maintenance costs is Unit E.
Investment Analysis of Establishment the Architectural Technical Design Service as a Creative Economy Based on BMC (Case Study in East Java Province) Insan Marthian; Bambang Syairudin
IPTEK Journal of Proceedings Series No 5 (2019): The 1st International Conference on Business and Management of Technology (IConBMT)
Publisher : Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (640.128 KB) | DOI: 10.12962/j23546026.y2019i5.6296

Abstract

National GDP and East Java Province GRDP show an increasing trend. The increase occurred because it was supported by an increase in several macro-industries such as the creative industry, real estate industry, and others. This shows good economic conditions in East Java Province. While the increase in the number of new households continues to increase, the need for home ownership continues to increase and the backlog of homes in East Java is still high above around 1,000,000 housing units every year, so the need for architectural services to make the design of houses or buildings still exists. Therefore, further analysis is needed by analyzing the investment feasibility study in establishing an architectural design service business. Investment analysis is done by making the business model based on BMC and analyzing from several aspects such as financial aspects and non-financial aspects (market and marketing aspects, operational aspects, and management aspects). This study uses qualitative methods, where data collection is done by means of discussion (Focus Group Discussion), interviews, and through literature. By conducting an investment feasibility study based on the BMC business model, it is expected to obtain a feasible business model for Architectural services business in meeting the needs of the design of the house or building