Claim Missing Document
Check
Articles

Found 3 Documents
Search
Journal : Jurnal Talenta Sipil

Analisis Faktor-Faktor Kinerja Sistem Keselamatan Kerja Konstruksi Proyek Bangunan Gedung Dinas Pendidikan Kota Sungai Penuh Safwan, Safwan; Carlo, Nasfryzal; Putra, Wahyudi Utama
Jurnal Talenta Sipil Vol 7, No 1 (2024): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i1.345

Abstract

The Indonesian government through the minister of Public Works and Public Housing has recently issued regulation Number 10 of 2021 concerning guidelines for construction safety management systems. The SMK3 Occupational Health and Safety Management System is part of the company's overall management system in order to control risks related to work activities in order to create a safe, efficient and productive workplace. The Construction Safety Management System is required to be implemented during construction because it is also part of the planning and control of the BPSDM PUPR project, 2021. In fact, in Sungai Full city in 2019-2021 experienced labor accidents, one of the projects was a school construction project at the Sungai Full City Education Office which could not be separated from the risk factors for accidents to its workers. Based on secondary data related to work accident information at the Sungai Full City education office School Building Construction Project, information was obtained that there had been 68 accident cases during 2019 – 2021. The purpose of this study is to identify the dominant factors and factors in the Implementation of Improving Performance Aspects of the Work Safety Management System of the Education Building Project in Sungai Full City, as well as providing solutions to improve the Performance of the Work Safety Management System. This study used quantitative methods by distributing questionnaires to respondents. The results of the research conducted there are 6 factors in the Work Safety Management System (SMKK) implemented in the implementation of the Education Building Project in Sungai Full City, consisting of Commitment factors, Project Managerial factors, K3 Regulations and Procedures factors, Worker Communication factors, Worker Competence factors, Work Environment factors, and Worker Involvement factors in K3.
Efektifitas Pelaksanaan Program Bantuan Stimulan Perumahan Swadaya (BSPS) di Kecamatan Pantai Cermin Kabupaten Solok Pangestu, Yangga; Suherman, Hendra; Mulyani, Rini; Carlo, Nasfryzal
Jurnal Talenta Sipil Vol 7, No 2 (2024): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i2.584

Abstract

One important step in an effort to meet the housing needs of the community is the construction of housing and settlements whose main goal is to prepare prosperous housing with adequate and affordable infrastructure, facilities and utilities. This study aims to be able to see the extent of the effectiveness of the implementation of the self-help housing stimulant assistance program which refers to technical guidelines. The analysis uses a descriptive qualitative approach, by taking assessment indicators about habitable houses based on technical instructions for the implementation of activities, After that, questionnaires were distributed to 26 houses receiving aid, 14 houses in Nagari Surian and 12 houses in Nagari Lolo Sampling take with using a Likert Scale using a Scale of 5, starting from Very Unsuitable (STS) to Very Suitable (SS), so that the implementation process can run optimally to be able to see threats that occur and also see opportunities to be able to optimize the implementation process is carried out also analysis using the SWOT MethodThe results of the study show that the application of assessment indicators taken from technical implementation guidelines falls into the "appropriate" category where for Nagari Surian it is at 4.14 out of a maximum scale of 5 and for Nagari Lolo it is at 4.16. However, in the aspect of assessing access to adequate tap water in Nagari Lolo is included in the "Quite Appropriate" category, this is because not all houses can be reached by water from Water Suplly Company, so people still rely on tap water from residents' wells or spring sources. The results of the analysis for the value of self-help are also very good because the value of community self-help is 83% - 94%, The role of the facilitator is also very influential on the implementation of the self help housing stimulant assistant program because it can help the community to understand the purpose of the BSPS program itself.
Studi Kelayakan Pengembangan Bandar Udara Depati Parbo Kerinci Kurniyadi, Amri; Mulyani, Rini; Khadavi, Khadavi; Carlo, Nasfryzal; Utama, Lusi
Jurnal Talenta Sipil Vol 7, No 2 (2024): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i2.523

Abstract

To support the current tourism sector, Kerinci Regency has an airport called Depati Parbo. The development of this airport really needs to be implemented, considering that this airport is the only airport in Jambi province that has the potential to be developed and improved. The problem in this research is what parameters need to be reviewed to assess the feasibility of developing Depati Parbo Airport, and what are the evaluation results and recommendations for the feasibility of developing Depati Parbo Airport. The aim of this research is to identify the parameters of the technical and financial aspects of the feasibility of developing Depati Parbo Airport, carry out a feasibility evaluation and provide recommendations for the feasibility of developing Depati Parbo Airport. This research method is a combination of qualitative and quantitative, that is, both support each other, in order to obtain maximum results. From the results of the analysis, it was found that the NPV (Net Present Value) was 12,441,161,179.80, BCR (Benefit Cost Ratio) 9.70%, IRR (Internal Rate of Return) 41%, although this is sufficient, there is still a need to optimize the dealer's income Depati Parbo Airport, so there is no need to increase the capacity of Depati Parbo Airport, but it is necessary to optimize Depati Parbo airport revenue.