Strategi Pengembangan Sentra OVOP IKM Keumamah Lampulo Menggunakan SWOT dan QSPM Muhammad Akbar Fauzi; Friesca Erwan; Hasan Yudie Sastra; Uswatun Hasanah Nura
Jurnal Optimalisasi Vol 8, No 1 (2022): April
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jopt.v8i1.5283

Abstract

One Village One Product (OVOP) merupakan salah satu strategi pengembangan potensi produk unggulan Industri Kecil dan Menengah (IKM). Di Provinsi Aceh, OVOP Banda Aceh merupakan pilot project yang dilaksanakan untuk membentuk sentra-sentra unggulan IKM, salah satunya adalah Sentra OVOP IKM Keumamah yang berlokasi di Kelurahan Lampulo, Kecamatan Kuta Alam, Banda Aceh. Penelitian ini bertujuan untuk mengidentifikasi alternatif strategi pengembangan industri yang diterapkan di Sentra IKM Keumamah Lampulo menggunakan SWOT dan menentukan strategi prioritas pengembangan industri menggunakan matriks QSPM. Dari hasil penyusunan matriks SWOT diperoleh tujuh alternatif strategi pengembangan industri diantaranya adalah mempertahankan kualitas dan mempromosikan produk, meningkatkan SDM, membentuk tim pemasaran, pembentukan paguyuban (organisasi sosial), menetapkan harga produk yang bersaing, negosiasi harga bahan baku dengan pemasok secara win-win solution, menggunakan alat produksi yang inovatif dan tepat guna, menciptakan inovasi produk. Sedangkan hasil penyusunan matriks QSPM diperoleh bahwa strategi pengembangan industri yang diprioritaskan adalah membentuk paguyuban (asosiasi) dengan nilai TAS 6,340.
RISIKO PRODUKSI PADA INDUSTRI PETERNAKAN AYAM BROILER DI KABUPATEN ACEH BESAR Heri Tri Irawan; Hasan Yudie Sastra; Muhammad Dirhamsyah
Jurnal Rekavasi Vol 6 No 2 (2018)
Publisher : Jurusan Teknik Industri, Institut Sains & Teknologi AKPRIND Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (371.843 KB)

Abstract

Permasalahan yang dihadapi pada indsutri peternakan ayam broiler adalah karena tingginya tingkat kematian ayam yangdihadapi peternak, sehingga hal ini menjadi sektor kegagalan utama pada industri peternakan ayam broiler. Tujuan daripenelitian ini adalah untuk mendapatkan sumber-sumber risiko pada peternakan ayam broiler. Metode analisis yangdigunakan pada penelitian ini adalah dengan menggunakan metode z-score dan VaR (value at risk). Dari hasil kajianyang telah diteliti terdapat 4 jenis risiko produksi pada peternakan ayam broiler, yaitu kepadatan ruang, perubahancuaca, hama predator dan penyakit. Sumber risiko terbesar yang menyebabkan kematian adalah penyakit dan kepadatanruang. Sumber risiko penyakit memiliki tingkat probabilitas 37,8 persen kemudian kepadatan ruang memiliki tingkatprobabilitas 27,7 persen serta sumber risiko terkecil adalah perubahan cuaca dan hama predator. Sumber risikoperubahan cuaca memiliki tingkat probabilitas 12,3 persen dan sumber risiko hama predator memiliki tingkatprobabilitas 17,1 persen.
Supply Chain Risk Mapping at ABC Cement Plant in Aceh, Indonesia Raihan Dara Lufika; Hasan Yudie Sastra; Prima Denny Sentia; Ilyas Ilyas; Iskandar Hasanuddin
Aceh International Journal of Science and Technology Vol 11, No 2 (2022): August 2022
Publisher : Graduate Program of Syiah Kuala University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (376.753 KB) | DOI: 10.13170/aijst.11.2.23457

Abstract

Supply Chain Risk Management is an industry collaboration work with partners in the supply chain system to implement a risk management process in dealing with the emergence of risks and uncertainties caused by logistics activities or other resources in the supply chain. Every industry deals with risk. This study aims to identify, classify, and mapping supply chain activities and their risks. At the initial stage, the identification of supply chain events is done by doing interviews and brainstorming. Then, these events are portrayed in the supply chain map. Then, the risk identification stage used a rating scale to determine the level of likelihood and consequence based on three SCOR elements. There are 40 risk events in this study which are 13 risk events in the source section, 19 risk events in the make section, and eight risk events in the delivery section. Finally, it is necessary to calculate the value of the Risk Priority Index (RPI). The RPI is the basis of the risk mapping stage. The risk map will show the urgency to treat each risk event.
IMPROVING THE FISHERY BUSINESS PERMIT ISSUANCE USING BUSINESS PROCESS IMPROVEMENT Friesca Erwan; Fariz Aulia Alzi; Hasan Yudie Sastra; Ilyas Ilyas; Nur Izzaty; Didi Asmadi
Jurnal Ilmiah Teknik Industri Vol. 10 No. 3 (2022): Jurnal Ilmiah Teknik Industri : Jurnal Keilmuan Teknik dan Manajemen Industri
Publisher : Program Studi Teknik Industri, Fakultas Teknik Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jitiuntar.v10i3.22092

Abstract

This study aims to analyse the actual business process applied in the Capital Investment Agency and One-Stop Licensing Centre of Aceh Province, mainly on issuing a fishery business permit. The institution has established 240 working hours (equivalent to 14,400 minutes) to issue the permit based on the SOP (standard operating procedures). However, a field observation showed that the actual process time exceed up to 600 hours (equivalent to 37,104 minutes). To investigate the gap and analyse the business process activities, this study employs Business Process Improvement (BPI) which consists of phase 1: organizing for improvement, phase 2: understanding the process, and phase 3: streamlining. This study occupies Bizagi Modeler to build and simulate a systematic business process model according to Business Process Modelling and Notation (BPMN). Based on the simulation process, the actual business process resulted 110 activities with total time 37,104 minutes, while the redesign model resulted 72 activities with total time 197.25 working hours (equivalent to 11,835 minutes). The redesign model further measured using devil’s quadrangle and obtained 68.11% efficiency. The efficiency aligns with better flexibility and service quality improvement.