RANCANG BANGUN MONITORING DAN PENYIMPANAN NILAI DAYA LISTRIK SECARA REAL TIME PADA BASIS DATA I Dewa Gde Bayu Wiranatha; Cok Gede Indra Partha; Widyadi Setiawan
Jurnal SPEKTRUM Vol 5 No 1 (2018): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (524.345 KB) | DOI: 10.24843/SPEKTRUM.2018.v05.i01.p20

Abstract

Hotel management to monitor the energy to know the electrical energy consumption at the hotel. Energy monitoring is carried out in order to achieve the efficient use of electrical energy, for accurate energy monitoring requires a tool that can monitor the power consumption in real time and store on digital media or database so easy to access. Data stored on the database using the help of microcontroller and Ethernet Shiled connected to the LAN network. The sensors used in this research are voltage down 220VAC: 9VAC and current sensors with maximum current capacity of 100 A. The result of data recording is the highest current sensor deviation of 2.4% and the highest voltage sensor deviation is 0.4%.
Kemandirian Energi Listrik di Pasar Seni Kuta dengan menggunakan Sistem PLTS I Dewa Gde Bayu Wiranatha; Rukmi Sari Hartati; I Nyoman Setiawan
Jurnal Teknologi Elektro Vol 23 No 1 (2024): (Januari - Juni ) Majalah Ilmiah Teknologi Elektro
Publisher : Program Studi Magister Teknik Elektro Universitas Udayana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/MITE.2024.v23i01.P17

Abstract

The Kuta Art Market, is a modern market that was recently revitalized in 2023. The building has renewable energy potential of PLTS on the roof area, when this potential can be exploited then the electricity consumption of the Kuta Art Market Building is no longer supplied by conventional power plants (PLN) but will enjoy clean energy of autonomous plants such as PLTS. The aim of this study is to identify the potential for generating electricity on the roof of the Kuta Art Market, determine the capacity of the battery as a reserve source of energy and the value of the investment. The research steps of this thesis calculate the solar energy potential in the area of the Kuta Art Market by using PVsyst software, collect the load profile of the Kuta Art Market. The next step is to compute the capacity of the PLTS - inverter then determine the battery capacity required according to the load profile of the Kuta Art Market and then determines the investment cost to build the solar power plant on the rooftop of the Kuta Art Market as well as to evaluate the potential cost savings that can be achieved by using solar energy as a primary resource. The total roof area of the Kuta Art Market is 780,455 m2 with energy potential of 166,23 kW. Based on the design results, PLTS will be built with a capacity of 61,6 kWp, with total battery capacity 3200 Ah. Total investment of Rp. 1,162,938.563 is required for the construction of PLTS, a payback period of 15 years 8 months, NPV of Rp. 204,439.887,26 and IRR of 8,06%. Based on the values above, it indicates that the PLTS project on the roof of the Kuta Art Market building is feasible to carry out.