PENERAPAN PEMBANGKIT LISTRIK TENAGA SURYA SKALA RUMAH SEDERHANA DI DESA LAHOPANG KABUPATEN SITARO PROVINSI SULAWESI UTARA Meita Rumbayan; Stenly Tangkuman; Sherwin R.U Sompie
ETHOS (Jurnal Penelitian dan Pengabdian) Vol 6 No.1 (Januari, 2018) Ethos: Jurnal Penelitian dan Pengabdian (Sains & Teknologi)
Publisher : Universitas Islam Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/ethos.v6i1.3542

Abstract

This application of science and technology for community development is aimed to introduce applied  technology of solar home system in Lahopang village which is located in Siau island, Sitaro District, North Sulawesi provience of Indonesia. In addition, this program is a real action implementation of university tridharma Sam Ratulangi University in implementing community-based solutions to the problems of energy for rural and remote area. Method of implementation of this activity consists of several stages, namely: (1) Application of solar home system technology as an example for a selected house in the village; (2) Training and technical guidance on the operation and maintenance of the solar home system for the enhancement of knowledge and skills on the technology applied. Through technology transfer in this activities, it is expected that technology implementation will be maintained in the future; (3) Counseling for increasing awareness of conservation of electric energy for island communities.
Introduksi Teknologi Biogas Sebagai Energi Terbarukan Untuk Masyarakat Pedesaan (Studi Kasus: Desa Kosio, Sulawesi Utara) Meita Rumbayan
ETHOS (Jurnal Penelitian dan Pengabdian) Vol 5 No.1 (Januari, 2017) Ethos: Jurnal Penelitian dan Pengabdian (Sains & Teknologi)
Publisher : Universitas Islam Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/ethos.v0i0.2221

Abstract

This paper is the progress report of research action about biogas technology introduction for a rural community in North Sulawesi, Indonesia. The purpose of this study is to discuss biogas technology utilization in the selected rural. The research method is done by literature review, interview, site visit, data collection using questioner and case study of pilot project development in biogas technology for a household in Kosio village indicate a positive response from the local community. The discussion based on literature review, data collection and case study gives some recommendations for further study in term of scenario and guideline for the development of biogas technology for rural communities.
Kajian Perencanaan Kebutuhan dan Pemenuhan Energi Listrik di Kota Manado Agus S.F. Rajagukguk; Marthinus Pakiding; Meita Rumbayan
Jurnal Teknik Elektro dan Komputer Vol. 4 No. 3 (2015): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v4i3.7972

Abstract

Abstrak Seiring dengan perkembangan zaman sekarang ini permintaan akan energi listrik meningkat pesat. Peningkatan ini dipengaruhi oleh pertumbuhan penduduk dan faktor ekonomi suatu daerah. Sehingga dibutuhkan perencanaan untuk dapat memenuhi kebutuhan energi listrik di waktu mendatang. Tugas akhir ini bertujuan untuk memproyeksikan konsumsi energi listrik, jumlah pelanggan listrik, produksi energi listrik dan beban puncak di Kota Manado tahun 2014 sampai 2023 menggunakan perangkat lunak LEAP (Long-range Energy Alternatives Planning System). Selain itu, dilakukan juga perencanaan pengembangan pembangkit yang sesuai untuk memenuhi kebutuhan energi listrik Kota Manado. Hasil proyeksi konsumsi energi listrik di Kota Manado mengalami peningkatan dari tahun 2014 – 2023, dengan pertumbuhan rata – rata sebesar 12,2 persen per tahun atau meningkat dari 541.233 MWh pada tahun 2014 menjadi 1.525.508 MWh pada tahun 2023, pertumbuhan rata – rata jumlah pelanggan energi listrik selama periode tersebut sebesar 3,5 persen per tahun atau sebesar 102.213 pelanggan pada tahun 2023. Proyeksi produksi energi listrik juga meningkat sesuai dengan peningkatan konsumsi energi listrik dengan pertumbuhan rata – rata 11,8 persen per tahun atau sebesar 1.645.830 MWh pada tahun 2023. Hasil proyeksi beban puncak bertumbuh rata – rata 10,4 persen per tahun, dengan total kebutuhan energi listrik pada tahun 2023 sebesar 281,25 MW. Berdasarkan hasil proyeksi kebutuhan energi listrik Kota Manado tahun 2014 – 2023, untuk dapat memenuhi kebutuhan energi listrik sampai tahun 2023, maka direncanakan pengembangan pembangkit khusus untuk memenuhi kebutuhan energi listrik Kota Manado yang akan interkoneksi melalui sistem Minahasa. Kata Kunci: Energi listrik, Kebutuhan energi listrik, LEAP, Pemenuhan energi listrik Abstract Along with the times electrical energy demand will increase rapidly. This increase is influenced by population growth and economic factors of a region. So be required planning to meet needs of electrical energy in the future. This final project aims for project of electrical energy consumption, the number of customers electrical energy, the production of electric energy and peak load in the City of Manado 2014 to 2023 by using the software LEAP (Long-range Energy Alternatives Planning System). Furthermore, performed also generator development planning who compliance to comply the needs Manado City of electrical energy. The results of projection electrical energy consumption in the City of Manado increasing from 2014 – 2023, with average growth is 12.2 percent per year, the increasing of energy consumption is 541,233 MWh in 2014 to 1,525,508 MWh in 2023, the average amount growth of electricity customers during the  period by 3.5 percent per year or by ofcustomers is 102,213 in 2023. Projected production of electric energy is also increased according to the increase in electrical energy consumption with average growth 11.8 percent per year or a total of 1,645,830 MWh in 2023. Results of peak load growth projected average is 10.4 percent per year, the total electric energy needs in 2023 amounted to 281,25 MW. Based on a projection of the electrical energy needs in Manado City for 2014 – 2023, to be able to fulfill electrical energy needs in 2023, the planned development of a special generator to comply the needs Manado City of electrical energy that will interconnect through the Minahasa system. Keywords: Electrical energy, Electrical energy compliance,   Electrical energy needs, LEAP
Pemanfaatan Sekam Padi Sebagai Energi Alternatif Untuk Membangkitkan Energi Listrik Marshall V. Supit; Hans Tumaliang; Meita Rumbayan
Jurnal Teknik Elektro dan Komputer Vol. 4 No. 5 (2015): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v4i5.9871

Abstract

Abstract--Electrical energy is one of theinfrastructure related to the livelihood of many people. Until now, the supply of electric energy sources are still reliant on the use of petroleum and coal are expected to be exhausted the next 10-15 years. In this final task, the calculated amount and the potential energy that can be produced from 200 hectares of rice farms in the village Wineru. In the test, the authors made a prototype of a simple steam power plant using rice husk fuel. From burning rice husks 119,75 kg, can be generated by 477.400 kcal of heat energy equivalent to 23,28 kWh of electricity which the combustion efficiency of 93%. Heat energy provided to the working fluid of rice husk power plant prototype average of 32.540,31 kcal. Mechanical energy produced in the turbine of 89,57 kJ/kg equivalent of 24,8 Wh electric energy. The output voltage generator 9 Volt.Electric power that can be generated from 200 hectares of land that is 178,078 kW. Keywords: Alternative Energy, Electrical Energy, Heat Energy, Rice Husk Abstrak-- Energi listrik merupakan salah satu infrastruktur yang menyangkut hajat hidup orang banyak. Sampai saat ini, penyediaan sumber energi listrik masih bergantung pada penggunaan minyak bumi dan batu bara yang diperkirakan 10-15 tahun mendatang akan habis. Dalam tugas akhir ini, dihitung jumlah serta potensi energi yang dapat dihasilkan dari 200 hektar lahan pertanian padi di Desa Wineru.Di dalam pengujian, penulis membuat prototype Pembangkit Listrik Tenaga Uap sederhana dengan menggunakan bahan bakar sekam padi. Dari pembakaran sekam padi 119,75 kg, dapat dihasilkan energi kalor sebesar 477.400 kcal setara dengan 23,28 kWh listrik dimana effisiensi pembakaran sebesar 93%. Energi kalor yang diberikan kepada fluida kerja prototype PLTU sekam padi rata-rata 32.540,31 kcal. Energi mekanik yang dihasilkan pada turbin sebesar 89,57 kJ/kg setara 24,8 Wh energi listrik. Tegangan output generator 9 Volt. Energi listrik yang bisa dihasilkan dari 200 hektar lahan yaitu 178,078 kW. Kata Kunci:Energi Alternatif, Energi Kalor, Energi Listrik, Sekam Padi
Sistem Monitoring Konsumsi Energi Listrik Secara Real Time Berbasis Mikrokontroler Temy Nusa; Sherwin R.U.A. Sompie; Meita Rumbayan
Jurnal Teknik Elektro dan Komputer Vol. 4 No. 5 (2015): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v4i5.9974

Abstract

Abstract - Currently the electrical energy has become one of the primary needs of mankind because all the good environment in the home, workplace, factories, etc., need electrical energy. Every year electricity consumption continues to increase, and also the depletion of petroleum reserves that have an impact on fuel price hike and it certainly affects the basic electricity rate increase (TDL) of PLN, which ultimately make electrical energy into something that expensive. So it takes consciousness as well as the efforts of humans to do the electrical energy savings efforts. In order to perform a better power management in the home then needed an electronic device can monitor energy consumption of electrical devices which is considered quite wasteful by making use of a microcontroller. The Device designed to monitor the consumption of electric energy utilizing step-down transformer to measure Voltage source of PLN, while to measure the load current utilizing the current sensor ACS712 and microcontroller ATmega 328 artificial of ATMEL, functioned to process all the data of the parameters needed to obtain the value of electrical energy consumption), and displays it on the LCD character 20x4 to provide information to the user of electricity. In the tests performed, it is known the measurement of electrical energy consumption using a tool that has been designed is able to measure the electrical currents closely enough to the purely resistive load with an error less than 1%, but there was an error on the load LED lights SiCermat amounted to 14.30%, also at Philips Softone Lamp load of 5.73% when compared to the measurement using the Multimeter Krisbow KW06-276. Keywords: ACS712,ATmega328, Electrical Energy, Microcontroller. Abstrak - Saat ini energi listrik telah menjadi salah satu kebutuhan primer manusia karena semua lingkungan baik itu di rumah, tempat kerja, pabrik – pabrik, dll., membutuhkan energi listrik. Setiap tahun konsumsi listrik terus menigkat, dan juga menipisnya cadangan minyak bumi yang berdampak pada kenaikan BBM dan sudah tentu mempengaruhi kenaikan tarif dasar listrik (TDL) PLN, yang pada akhirnya membuat energi listrik menjadi sesuatu yang mahal. Sehingga diperlukan kesadaran serta usaha dari manusia untuk melakukan upaya penghematan energi listrik. Agar bisa melakukan manajemen listrik yang lebih baik di rumah maka diperlukan suatu perangkat elektronika yang dapat memonitor pemakaian energi listrik pada perangkat yang dianggap cukup boros dengan memanfaatkan mikrokontroler. Alat yang dirancang untuk memonitor konsumsi energi listrik ini memanfaatkan transformator step-down untuk mengukur tegangan sumber dari PLN, sementara untuk mengukur arus beban memanfaatkan sensor arus ACS712 dan mikrokontroler ATmega 328 buatan ATMEL, difungsikan untuk mengolah semua data dari parameter – parameter yang dibutuhkan untuk mendapatkan nilai konsumsi energi listrik, serta menampilkannya pada LCD karakter 20x4 untuk memberikan informasi kepada pengguna listrik. Pada pengujian yang dilakukan, diketahui hasil pengukuran konsumsi energi listrik menggunakan alat yang telah dirancang mampu mengukur arus listrik dengan cukup teliti pada beban resistif murni dengan error lebih kecil dari 1%, akan tetapi terjadi error pada beban lampu LED SiCermat sebesar 14,30%, juga pada beban Lampu Philips Softone sebesar 5,73% jika dibandingkan dengan pengukuran menggukan Multimeter Krisbow KW06-276. Kata Kunci : ACS712,ATmega328, Electrical Energy, Microcontroller.
Studi Pembangkit Listrik Tenaga Surya Makalehi Di PLN Area Tahuna Rayon Siau Kabupaten Kepulauan Sitaro Rioh J. Lumempouw; Meita Rumbayan; Hans Tumaliang
Jurnal Teknik Elektro dan Komputer Vol. 4 No. 7 (2015): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v4i7.10769

Abstract

Abstract - Electricity is one of the world which can not be seen with the naked eye, but can be enjoyed by the user. PLTS Makalehi 260 kWp, not optimal so most people have not been using electricity as a means of lighting in their homes. The method used by several phases: preparation, data collection and resistant identification of problems. Data collection is done by oservasi, interviews, photos and major equipment requested data PLTS exploitation. The results showed that the equipment / components PLTS Makalehi no longer be updated, resulting in an output power PLTS Makalehi decreased from year to year and are not able to supply the maximum power as the power capable of 150 kWp solar power Makalehi.   Keywords: 260 kWp, Makalehi,Sitaro, Solar Power Plant (PLTS).   Abstrak - Listrik merupakan salah satu mata dunia yang tidak dapat dilihat dengan kasat mata, tetapi dapat dinikmati oleh pemakainya. PLTS Makalehi 260 kWp, belum optimal sehingga sebagian masyarakat belum memakai listrik sebagai sarana penerangan dalam rumah mereka. Metode penelitian yang digunakan melalui beberapa tahap yaitu tahap persiapan, pengumpulan data dan tahan identifikasi masalah. Pengumpulan data dilakukan dengan cara oservasi, wawancara, foto peralatan utama dan meminta data-data pengusahaan PLTS. Hasil penelitian menunjukkan bahwa Peralatan/komponen PLTS Makalehi tidak lagi di perbaharui sehingga mengakibatkan daya output PLTS Makalehi menurun dari tahun ke tahun dan tidak mampu menyuplai daya maksimum seperti daya mampu PLTS Makalehi yaitu 150 kWp.   Kata Kunci: 260 kWp, Makalehi, Pembangkit Listrik Tenaga Surya (PLTS), Sitaro.
Analisa Ekonomis Pemanfaatan Limbah Organik Sebagai Pembangkit Listrik Tenaga Gas (PLTG) Pada Pasar Tradisional Jeral H. Lontoh; Meita Rumbayan; Glanny M.Ch. Mangindaan
Jurnal Teknik Elektro dan Komputer Vol. 6 No. 1 (2017): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v6i1.15902

Abstract

Abstract— The needs of renewable energy is highly required this time to replace fossil energy as a source of electricity. The utilization of environment friendly renewable energy continue to be developed in order to face the energy crisis and create a healthy environment. The purpose of writing this last task is to analyze the potential of organic waste and economical calculations from the development of a power plant in gas fuel that obtained from organic waste, so that can produce alternative energy and can maintain environmental sustainability. In this last task, the potential of organic waste is calculated from the volume of garbage that produce heat energy kilo calori and converted into electrical power units kilo Watt hour. The location of the research potential of organic waste is found in the traditional market pinasungkulan karombasan. The volume of organic waste produced by the market pinasungkulan is 20 m3 each day so it can produce 124.600 kcal heat energy every day, then from that heat energy it can be converted into electrical energy of 144,81 kWh. Therefore the author assume that plant equipment used is PLTG with a capacity of 150 kW.Keywords: economical calculations, kilo calori,  organic waste, renewable energy.Abstrak— Kebutuhan energi terbarukan sangat di perlukan saat ini untuk menggantikan energi fosil sebagai sumber pembangkit listrik. Pemanfaatan energi terbarukan yang ramah lingkungan terus dikembangkan guna menghadapi krisis energi dan menciptakan lingkungan yang sehat. Tujuan dari penulisan tugas akhir ini adalah untuk menganalisa potensi limbah organik serta perhitungan ekonomis dari pembangunan suatu pembangkit berbahan bakar gas yang di dapatkan dari limbah organik, sehingga bisa menghasilkan energi alternatif dan bisa menjaga kelestarian lingkungan. Dalam tugas akhir ini, potensi limbah organik dihitung dari volume sampah yang menghasilkan energi panas kilo calori dan dikonversi menjadi satuan daya listrik kilo Watt hour. Lokasi penelitian potensi limbah organik ini terdapat di pasar tradisional pinasungkulan karombasan. Dari volume sampah organik yang dihasilkan pasar pinasungkulan sebesar 20 m3 setiap harinya sehingga dapat menghasilkan energi kalor sebesar 124.600 kcal setiap hari, maka dari energi kalor tersebut dapat dikonversikan menjadi energi listrik sebesar 144,81 kWh. Oleh karena itu penulis mengansumsikan peralatan pembangkit yang digunakan adalah PLTG dengan kapasitas 150 kW. Kata kunci: energi terbarukan, kilo kalori, limbah organik, perhitungan ekonomis,
Studi Elektrifikasi Daerah Terluar Khususnya di Kabupaten Kepulauan Talaud Yulianus Salasa; Meita Rumbayan; Sartje Silimang
Jurnal Teknik Elektro dan Komputer Vol. 6 No. 2 (2017): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v6i2.17266

Abstract

Abstrak— Sumber energi terbarukan merupakan solusi energi alternatif dalam mengatasi krisis energi listrik di Indonesia terlebih lagi untuk masyarakat yang ada di pulau terluar. Pulau Kakorotan merupakan pulau kecil terluar yang ada di Kabupaten Kepulauan Talaud yang masih sangat membutuhkan energi listrik. Pembangkit Listrik Tenaga Hibrid (PLTH) yang berbasis pada potensi energi surya dan kekuatan angin merupakan pembangkit listrik yang tepat untuk di bangun di pulau Kakorotan Kecamatan Nanusa Kabupaten Kepulauan Talaud berdasarkan hasil simulasi menggunakan Software Homer. Software HOMER 2 (Hybrid Optimization of Multiple Energy Resources) versi 2.81 ini  akan mengurutkan data hasil keluaran simulasi dan optimasi berdasar nilai NPC terendah. Biaya bersih sekarang (NPC) adalah nilai sekarang dari semua biaya yang dikeluarkan selama masa pakainya, dikurangi nilai sekarang dari semua pendapatan  yang dihasilkannya selama masa pakainya. Biaya meliputi biaya modal, biaya pergantian, biaya operasional dan pemeliharaan, biaya bahan bakar, hukuman emisi, dan biaya daya beli dari jaringan. Hasil simulasi dengan Software Homer menunjukkan bahwa sistem PLTH dengan berbasis pada potensi energi surya dan energi angin layak dalam memenuhi kebutuhan energi listrik di pulau Kakorotan berdasarkan total nilai bersih sekarang (NPC) sebesar US$ 974.767, biaya pembangkitan (COE) sebesar US$ 0.428 per kWh, kapasitas produksi listrik yang dihasilkan sebesar 271.518 kWh pertahun, dan memiliki kelebihan tenaga listrik selama setahun sebesar 57.396 kWh.Kata kunci: Angin, Energi terbarukan, HOMER, PLTH, Surya.  Abstract— Renewable energy sources is an alternative energy solution in overcoming the electrical energy crisis in Indonesia, especially for the people in the outer islands. Kakorotan Island is the outermost small island of Talaud Islands Regency which still needs electricity energy. Hybrid Power Plants (PLTH) based on the potential of solar energy and wind power is the right power station to be built on Kakorotan Island, Nanusa District, Talaud Islands Regency, based on simulation results using Homer Software. 2.81 HOMER 2 (Hybrid Optimization of Multiple Energy Resources) software version will sort the results of simulation and optimization data based on the lowest NPC value. The present net cost (NPC) is the present value of all expenses incurred over its lifetime, minus the present value of all revenues it generates during its lifetime. Costs include capital costs, replacement costs, operational and maintenance costs, fuel costs, emission penalties, and purchasing power costs from the network. Simulation results with Homer Software show that PLTH system based on the potential of solar energy and wind energy is feasible in meeting the demand of electrical energy in Kakorotan island based on the total net present value (NPC) of US $ 974,767, the generation cost (COE) of US $ 0.428 per KWh, the production capacity of electricity generated is 271,518 kWh per year, and has an electric power over the year of 57,396 kWh. Keywords : HOMER, Hybrid, Renewable Energy,  Solar, Wind.
Audit Energi Di Kantor Walikota Manado, Sulawesi Utara Afyudin M. Umanailo; Meita Rumbayan; Vecky C. Poekoel
Jurnal Teknik Elektro dan Komputer Vol. 7 No. 2 (2018): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v7i2.19555

Abstract

Abstrak-Consumption of electric energy continues to increase, with the increase in electrical energy needs, the reliability of a power system must also be directly proportional to the needs of electrical energy. Energy Audit is a method used to calculate the amount of energy consumption in buildings and recognize ways to save.The Energy Audit at the Manado Mayor's office, North Sulawesi, aims to determine the energy usage and energy utilization conditions and energy savings opportunities in the mayor's office of Manado, North Sulawesi.From the data obtained there are some buildings / rooms that have not been fulfilled and there is one room that meets the criteria of Enegi Audit. And from this analysis is used planning to optimize the use of electric energy and other energy utilization in the office of mayor of Manado, North Sulawesi to be more economical and support Manado city program to Manado Smart City . Keywords: Electrical Energy, Energy Audit, Manado Mayor's office, Smart City  Abstrak-Konsumsi akan energi listrik terus meningkat, dengan peningkatan kebutuhan energi listrik maka keandalan suatu sistem tenaga listrik juga harus berbanding lurus dengan kebutuhan energi listrik. Audit Energi adalah metode yang dipakai untuk menghitung besarnya konsumsi energi pada bangunan gedung dan mengenali cara – cara untuk penghematannya. Audit Energi di kantor Walikota Manado, Sulawesi Utara bertujuan untuk mengetahui penggunaan energi dan  Kondisi pemanfaatan energi serta peluang penghematan energi di kantor walikota Manado, Sulawesi Utara. Dari data yang diperoleh ada beberapa bagunan/ruangan yang belum memenuhi  dan ada satu ruangan yang memenuhi kriteria dari Audit Enegi. Dan dari Analisa ini digunakan perencanaan untuk mengoptimalkan penggunaan  energi listrik serta pemanfaatan energi lain di kantor walikota Manado, Sulawesi Utara agar dapat lebih ekonomis dan mendukung program kota Manado menuju Manado Smart City . Kata Kunci : Audit Energi, Energi Listrik, kantor Walikota Manado, Smart City
Perencanaan Pembangkit Listrik Tenaga Listrik Minihidro Sungai Moayat Desa Kobo Kecil Kota Kotamobagu Hendra E. Mantiri; Meita Rumbayan; Glanny M.Ch. Mangindaan
Jurnal Teknik Elektro dan Komputer Vol. 7 No. 3 (2018): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v7i3.20769

Abstract

Abstract—Electrical energy needs in North Sulawesi is increasing. Along with that, many a few power plant development has done. Including Kotamobagu City Area which has a lot of water potential to be converted into electric power.Minihydro Power Plant (PLTM) development planning in Kobo Kecil village by utilizing water potential of Moayat river. Begin by calculating the water debit and head so it can be estimated that capability of PLTM to be built. Then it is designed to manufacture the components of PLTM, such as: dam, intake building, waterway, stilling pond, penstock, power house, and spillway. Where the power house there are main equipments, such as: turbine, generator, and transformer.Keywords: Generator, Head, Turbine, Water Debit.Abstrak—Kebutuhan energi listrik di Sulawesi Utara semakin meningkat. Seiring dengan itu, banyak dilakukan beberapa pembagunan pembangkit tenaga listrik. Termasuk daerah Kota Kotamobagu yang mempunyai banyak potensi air untuk diubah menjadi tenaga listrik.Perencanaan pembangunan Pembangkit Listrik Tenaga Minihidro (PLTM) di desa Kobo Kecil dengan memanfaatkan potensi air sungai Moayat. Di mulai dengan menghitung debit air dan head yang ada sehingga dapat diperkirakan kemampuan PLTM yang akan dibangun. Kemudian dirancangkan pembuatan komponen-komponen PLTM, seperti: bendung, bangunan pengambilan, saluran penghantar air, bak penenang, pipa pesat, rumah pembangkit dan saluran pelimpah. Dimana untuk gedung pembangkit terdapat peralatan utama, seperti: turbin, generator, dan transformator.Kata Kunci: Debit Air, Generator, Ketinggian Jatuh Air, Turbin.