Identifikasi Kriteria Keberhasilan Proyek Mila Faila Sufa
Performa: Media Ilmiah Teknik Industri Vol 11, No 1 (2012): PERFORMA Vol. 11, No 1 Maret 2012
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (42.381 KB) | DOI: 10.20961/performa.11.1.12622

Abstract

The successful completion of project requires effective management of the multiple barriers faced by the parties involved. The basic concept of project success is ambiguous because of the varying perceptions of the different parties involved in the construction and the owner, architects,contractors and surveyors as well as experts. This study aims to identify the criteria for project success from the desire of stakeholders involved and the achievement of goals of the project. Definition of success is often changed from one project to another. It also depends on your point of view different from the individuals involved and the objectives to be achieved and associated with several elements such as technical, financial,educational, social and professional issues.
Manajemen Risiko Proses Produksi Gula dengan Metode Failure Mode Effect and Analysis Mila Faila Sufa; Umi Khoiriyah
Performa: Media Ilmiah Teknik Industri Vol 16, No 1 (2017): PERFORMA Vol. 16, No 1 Maret 2017
Publisher : Industrial Engineering Study Program, Faculty of Engineering, Universitas Sebelas Maret

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (326.104 KB) | DOI: 10.20961/performa.16.1.12756

Abstract

A company should pay attention to operational risk to maximise its efficiency and effectivity.Identification of failure and the cause and the impact of the failure at milling station is needed to be done so that the sugar production process can run well. Here, we employ a failure mode and effect analysis to identify the failure and its effect. We obtain 22 operational risks with two critical risks. The two critical risks are then used as top event in analysing the cause of the failure. The result from fault tree analysis shows that there are 4 basic events, which are the turbine vibrates, schedule part’s change before failure, high rainfall and the schedule and priority of processing