Claim Missing Document
Check
Articles

Found 2 Documents
Search

PEMANFAATAN PEKARANGAN RUMAH DENGAN SISTEM HIDROPONIK UNTUK KETAHANAN PANGAN DI DESA HANDIWUNG ahmad saefulloh; Indah Purnama; Egading Sumarna; Tiara Sari Milenia; Aulia Adirma; Andrio Melky; Kartinah; Cece Marcelina; Afni Pramita Situmorang; Achlish Ridho Alfitra; Bagus Pratama; Jisrin Hutasoit; Dandang Kristian Antonius; Alfiani; Nafiuddin Ramadhani; Herindo Manik
Jurnal Pengabdian Kampus Vol 9 No 2 (2022): Jurnal Pengabdian Kampus
Publisher : LPPM Universitas Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52850/jpmupr.v9i2.7861

Abstract

Desa Handiwung secara umum memiliki keadaan topografi daerah topris dengan kawasan lahan pasang surut atau rawa – rawa. Kendala yang dihadapi pada lahan rawa yaitu berupa genangan air dan banjir yang datangnya tidak menentu, tingginya tingkat kemasaman dan rendahnya kesuburan tanah menyebabkan sulitnya bercocok tanam sayur – sayuran dilahan tersebut. Potensi yang dimiliki oleh Desa Handiwung sendiri yaitu dibidang pertanian tanaman pangan seperti padi. Perlunya alternatif lain untuk mendukung ketahanan pangan tidak hanya padi saja namun dapat di tanami sayur – sayuran yaitu dengan sistem hidroponik yang dapat digunakan penduduk sekitar untuk bercocok tanam serta dapat memanfaatkan pekarangan sekitar yang tidak memakan banyak tempat.
The Main Key To Implementation Of K3 In The Muhammadiyah Building Project Palangka Raya Kampus II During Pandemic Herindo Manik; Veronika Happy Puspasari; Waluyo Nuswantoro; Almuntofa Purwantoro
Jurnal Civil Engineering Study Vol. 1 No. 01 (2021): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1304.537 KB) | DOI: 10.34001/ces.01012021.3

Abstract

Occupational safety is an important part of the implementation of construction projects, where occupational safety requires the same attention to quality, time and cost. Management must develop a safety work program and undertake to execute the program in order to create safety on the project site. Therefore, the identification of the primary key is required for the implementation of K3 during the pandemic. The research data was obtained through a survey of questionnaires distributed to the workers of the construction project of the Muhammadiyah Palangka Raya Campus II building and the analysis of the data was carried out in a descriptive way. Based on the results of the mean and standard deviation analysis, the results obtained are the dominant OSH factors during the pandemic in the Muhammadiyah Palangka Raya Campus II building construction project, namely (1) K3 Regulations and Procedures, (2) Employee participation, and (3) Employee communication.