Kajian Pengaruh Dampak Rencana Kenaikan Tarif Jalan Dan Fasilitas Tol Terhadap Pengguna Jalan Tom Balsam (Balikapapan-Samarinda) Dharwati P Sari; Bernardo Sandrini Salasa; Nur Asriatul Kholifah; Hani Frisca; Deltaven Yoma
Jurnal Teknik AMATA Vol 3 No 2 (2022)
Publisher : Politeknik Amamapare

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55334/jtam.v3i2.302

Abstract

Jalan tol merupakan jalan bebas hambatan yang menjadi salah satu alternatif dari masalah kemacetan. Selain itu adanya jalan tol sangat membantu pengendara untuk mempersingkat jarak tempuh perjalanan, dan kenyamanan pengguna. Jalan Tol Balsam (Balikpapan-Samarinda) ini hadir untuk mendukung kawasan industri berbasis kelapa sawit, batu bara, migas, dan pertanian di dua kota. Saat ini jalan tol Balsam memlliki Panjang 97,27 km dan terdiri dari lima seksi,dua lajur dalam setiap jalur dan kecepatan minimal 60 km/jam dan maksimal 80 km/jam. Akan tetapi dengan harga yang ditentukan untuk kendaraan type 1 dianggap konsumen mahal, maka dari itu perlu dilakukan kajian tarif jalan tol Balsam untuk perencanaan kenaikan tarif tol. Metode yang digunakan pada penelitian ini adalah pengambilan sampel dari survey lapangan yang akan melibatkan 120 responden untuk mengisi kuesioner penelitian dengan kriteria responden yaitu yang sudah pernah menggunakan jalan tol Balsam dengan cara purposive sampling dengan tujuan membuat gambaran yang sistematis dan akurat mengenai fakta-fakta di lapangan. Hasil penelitian Tarif tol dan fasilitas tol memliki hubungan dan pengaruh cukup positif dan signifikan terhadap pengguna jalan tol Basam. Hasil perhitungan terhadap persepsi masyarakat terkait dengan tarif tol jalan yang saat ini ditetapkan sebanyak 71% menyatakan tarif masih mahal.
Pengendalian Waktu dan Biaya dengan Metode Earned Value Analysis (Studi Kasus: Rekonstruksi Jalan Kabupaten Kutai Kartanegara) Dharwati P. Sari; Bernardo Sandrini Salasa
Rekayasa Sipil Vol. 17 No. 3 (2023): Rekayasa Sipil Vol. 17 No. 3
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2023.017.03.14

Abstract

This research aims to describe the effect of changing control of the reconstruction on Sangasanga-Dondang road, Kutai Kartanegara Regency that have an impact on the time and cost. The length of the road is ± 18.02 km, starting from the intersection of three Sanga Sanga sub-districts and ending at the Dondang Bridge. The road often receives traffic loads from light vehicles and heavy vehicles. This disrupted the stability of the road structure so that some of the road segments experienced structural damage.This research used Earned Value Analysis (EVA), this method used three paramaters, namely Planned Value (PV), Earned Value (EV), and Actual Cost (AC). Based on analysis that had been done when a deviation occurs at estimate the project completion time for 36 weeks. From the parameters, the result obtained were earned value analysis was carried out in 2 weeks with BCWS value of Rp. 73,628,055.56, BCWP value of Rp. 214,691,666.67, and the ACWP value is Rp. 15,099,335,843.68.
PERBANDINGAN RENCANA ANGGARAN PELAKSANAAN DENGAN RENCANA ANGGARAN BIAYA SERTA WAKTU PELAKSANAAN PADA PEKERJAAN PENINGKATAN STRUKTUR JALAN RASAU-SEPULAU (STUDI KASUS : JALAN RASAU-SEPULAU KALIMANTAN BARAT) Bernardo Sandrini Salasa; Ian Fosther Away; Hendro Wardono
JURNAL INERSIA Vol. 14 No. 2 (2022): Jurnal Inersia
Publisher : POLITEKNIK NEGERI SAMARINDA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46964/inersia.v14i2.1032

Abstract

Pengendalian biaya merupakan hal yang penting untuk dilaksanakan dalam manajemen konstruksi. Selisih antara RAB dan RAP merupakan gambaran awal untuk memperkirakan laba rugi kontraktor dalam menyelesaikan suatu proyek. Tujuan penelitian yang ingin dicapai adalah untuk mengetahui berapa besar selisih antara rencana anggaran biaya (RAB) dengan rencana anggaran pelaksanaan (RAP) yang akan menjadi potensi keuntungan kontraktor. Data yang digunakan adalah data sekunder yang meliputi gambar Shop Drawing, data Biil Of Quantity (BOQ) pekerjaan, Daftar Analisa Harga Satuan yang digunakan oleh pihak kontraktor. Sedangkan data primer adalah data yang didapat dari lapangan. Metode pengolahan data dilakukan secara manual dengan cara menghitung analisa harga satuan pekerjaan kemudian dikalikan dengan volume pekerjaan. Hasil perhitungan didapat nilai Rencana Anggaran Biaya sebesar RP. 54.162.761.909. Rencana Anggaran Pelaksanaan sebesar RP. 54.162.761.909. sehingga didaptkan keuntungan sebesar RP486.708.856.01.