Studi Perencanaan Saluran Sudetan Pada Kali Lamong Untuk Menanggulangi Banjir di Kabupaten Gresik, Provinsi Jawa Timur Brigita Krisanti Wardono; Moh Sholichin; Sumiadi Sumiadi
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 2 No. 1 (2022): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (231.63 KB)

Abstract

The watershed condition of Lamong River is quite alarming because the discharge of Lamong River tends to be large during the rainy season. Of the problem the cause of flood Lamong River, it needs to be held the technical countermeasures in the form of construction of the floodway, the embankment, and the normalization. It is expected that the presence of flood mitigation can technically improve the condition of the existing Lamong River. The method used in the research is the analysis of the hydrology of the watershed Lamong River, the hydraulic analysis of existing conditions Lamong River using HEC-RAS 5.0.7, the analysis of the hydraulics after the construction of the floodway, the embankment and normalization using HEC-RAS 5.0.7 and analysis of the cost of construction of the technical countermeasures. After the implementation of the construction of the floodway, the embankment, and the normalization at Lamong River the results obtained storage capacity of the river to return period 25th with the ability to reduce the water level in the existing condition 6.877 m be 6.645 m. As for the overall cost needed in the response to this flood of Rp. 15.048.091.000,00 (fifteen billion forty-eight million ninety-one thousand rupiahs). Kondisi DAS Kali Lamong cukup memprihatinkan, sebab debit sungai Kali Lamong cenderung besar saat musim penghujan. Dari permasalahan penyebab terjadinya banjir Kali Lamong, maka perlu diadakan penanggulangan teknis berupa pembangunan sudetan, tanggul dan normalisasi sungai. Diharapkan dengan adanya penanggulangan banjir secara teknis dapat memperbaiki kondisi eksisting Kali Lamong. Dalam pelaksanaan teknis penanggulangan banjir, metode yang digunakan dalam penelitian yaitu analisis hidrologi DAS Kali Lamong, analisis hidrolika kondisi eksisting Kali Lamong menggunakan HEC-RAS 5.0.7, analisis hidrolika setelah adanya pembangunan sudetan, tanggul dan normalisasi menggunakan HEC-RAS 5.0.7 serta analisis biaya pembangunan penanggulangan teknis. Setelah dilaksanakannya pembangunan sudetan, tanggul dan normalisasi sungai pada Kali Lamong didapatkan hasil kapasitas tampungan sungai hingga kala ulang 25 tahun dengan kemampuan mereduksi tinggi muka air pada kondisi eksisting 6.877 m menjadi 6.645 m. Adapun keseluruhan biaya yang dibutuhkan dalam penanggulangan banjir ini sebesar Rp. 15.048.091.000,00 (lima belas miliyar empat puluh delapan juta sembilan puluh satu ribu rupiah).
PERENCANAAN DISTRIBUSI AIR BERSIH DI KECAMATAN HULU PALIK KABUPATEN BENGKULU UTARA DENGAN SOFTWARE WATERCAD 8i Alri Ananda Waskita Rama; Moh Sholichin; Jadfan Sidqi Fidari
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 1 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.01.39

Abstract

Over time, the need for clean water is increasing. Changes in land use as well as population growth every year further encourage the increase in the need for water. Clean water is one of the main needs in fulfilling water in Indonesia. So water supply needs to be a top priority in each region. Hulu Palik District is part of North Bengkulu Regency, the area has a large and continuous supply of clean water throughout the year at the Batu Layang spring. However, the distribution of clean water is still not good. Thus, an effort is needed to optimize the utilization of water availability by planning clean water distribution of network system so the benefits can be felt by the people of Hulu Palik District. This study is planning a new network with a useful life of up to 2041, so it is required to projection the population and determine discharge of water demand until 2041. Analysis of the hydraulics aspects of the pipe pressure (0.5 atm -10 atm), velocity (0.1 l/s – 2.5 l/s), hydraulic gradient (0 m/km -15 m/km), residual chlorine (0.3 mg – 0.5 mg), and calculation of pipe budget plan referring to Unit Price North Bengkulu Regency work using WaterCAD V8i Software. Based on the budget plan, can calculate the Economic Analysis to determine the price of water. In 2041 the population of the service area is 14341 people with an average daily water requirement of 22.90 l/s, with a domestic demand of 16.6 l/s, non-domestic demand of 2.49 l/s and a water loss factor of 3.82 l/s. At peak hours, the water demand in 2041 is 35.73 l/s and the maximum daily demand is 26.34 l/s. The design feasibility index includes pressure, velocity, residual chlorine hydraulic slope and economic feasibility. Based on research from analysis of feasibility index, clean water distribution network planning for Hulu Palik District was declared feasible. The required budget plan is IDR 11,692,745.64. Economic analysis is carried out using an interest rate of 3.5% and a useful life of up to 2041, a water price of Rp. 3,947.38/m3 is obtained in terms of the parameters of BCT, NPV, IRR and sensitivity analysis.Kecamatan Hulu Palik merupakan bagian dari Kabupaten Bengkulu Utara, daerah tersebut memiliki ketersediaan air bersih yang besar dan kontinu sepanjang tahun pada mata air Batu Layang. Namun, pendistribusian air bersih masih kurang baik. Sehingga, diperlukan suatu upaya untuk mengoptimalkan pemanfaatan ketersediaan air dengan merencanakan sistem jaringan distribusi air bersih yang nantinya dapat dirasakan manfaatnya bagi masyarakat Kecamatan Hulu Palik. Studi ini melakukan perencanaan jaringan baru dengan usia guna hingga tahun 2041, sehingga perlu dilakukan proyeksi jumlah penduduk dan mengetahui debit kebutuhan air hingga tahun 2041. Analisa terhadap aspek hidrolika pada jaringan perpipaan, kualitas air terhadap sisa klorin dan perhitungan RAB pipa yang mengacu pada Harga Satuan Pekerjaan Kabupaten Bengkulu Utara menggunakan Software WaterCAD V8i. Berdasarkan RAB, dapat menghitung Analisa Ekonomi hingga penentuan harga air.Pada tahun 2041 jumlah penduduk daerah layanan sebanyak 14341 jiwa dengan kebutuhan air harian rerata sebesar 22.90 lt/dt. Indeks kelayakan perencanaan meliputi tekanan, kecepatan, kemiringan hidrolis sisa klorin dan kelayakan ekonomi. Berdasarkan hasil analisa terhadap indeks kelayakan, perencanaan jaringan distribusi air bersih Kecamatan Hulu Palik dinyatakan layak. Rencana anggaran biaya yang diperlukan sebesar Rp 11,692,745,64. Analisa Ekonomi dilakukan dengan menggunakan suku bunga sebesar 3.5% dan usia guna hingga tahun 2041, didapat harga air sebesar Rp 3,947.38/m3.
Analisa Pengaruh Perubahan Tata Guna Lahan Terhadap Usia Guna Waduk Ngancar Hailal Juldah; Runi Asmaranto; Moh Sholichin
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 2 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.02.01

Abstract

Rusaknya suatu daerah tangkapan air (DTA) akibat penggunaan lahan yang kurang tepat akan mempengaruhi besarnya erosi di lahan dan besar sedimen yang masuk ke waduk sehingga akan mempengaruhi usia guna waduk itu sendiri. Penelitian ini dilakukan di Waduk Ngancar yang terletak di Kabupaten Wonogiri Jawa Tengah. Tujuan penelitian untuk mengetahui pengaruh perubahan tata guna lahan pada DTA Ngancar serta pengaruhnya terhadap usia guna waduk Ngancar. Dalam studi ini perhitungan erosi menggunakan metode Universal Soil Loss Equation (USLE).Data yang diperlukan dalam penelitian ini yaitu data curah hujan tahunan tahun 2001-2020, peta jenis tanah, peta kemiringan lereng, peta tata guna lahan pada tahun 2011, 2016 dan 2020  dari hasil analisa perubahan tata guna lahan didapatkan Pada DTA Ngancar setiap tahunnya luasan permukiman dan luasan ladangnya bertambah . Dari analisa USLE dan perhitungan laju sedimen didapatkan pada tahun 2011 besar erosi lahan sebesar 97.028,49 ton/tahun dan laju sedimentasi sebesar 22.529,18 m3/tahun. Pada tahun 2016 besar erosi lahan sebesar 100.432,21 ton/tahun dan laju sedimentasi sebesar 100.432,21 ton/tahun. Pada tahun 2020 besar erosi lahan sebesar 103.628,90 ton/tahun dan laju sedimentasi sebesar 23.235,07 ton/tahun. Sehingga didapatkan sisa usia guna waduk ngancar pada tahun 2020 tersisa 3,7 tahun. Damage to a catchment area (DTA) due to improper land use will affect the amount of erosion in the land and the amount of sediment that enters the reservoir so it will affect the useful age of the reservoir itself. This research was conducted at the Ngancar Reservoir located in Wonogiri Regency, Central Java. The purpose of this research was to determine the effect of land use changes on the Ngancar DTA and its effect on the useful life of the Ngancar reservoir. In this study, the calculation of erosion used the USLE (Universal Soil Loss Equation) method. The data needed in this study are annual rainfall data for 2001-2020, soil type maps, slope maps, and land use maps in 2011, 2016, and 2020 from the results of the analysis of land use changes obtained at the Ngancar DTA every year the area of settlements and the area of the fields increase. From the USLE analysis and sediment rate calculations, it was found that in 2011 the amount of land erosion was 97,028.49 tons/year and the sedimentation rate was 22,529.18 m3/year. In 2016, land erosion was 100,432.21 tons/year and sedimentation rate was 100,432.21 tons/year. In 2020, the top land erosion was 103,628.90 tons/year and the sedimentation rate was 23,235.07 tons/year. After calculating erosion and sedimentation, the remaining age of the Ngancar reservoir in 2020 will be 3,7 years left.