Analisis Penggunaan Bahan Bakar Palm Caul, Bark, dan Palm Sheel pada Sistem Boiler Multi Bahan Bakar di PT. Toba Pulp Lestari, Tbk Porsea Marpaung, Juanda Herlambang; Tarigan, Nurlianna
IRA Jurnal Teknik Mesin dan Aplikasinya (IRAJTMA) Vol 2 No 3 (2023): Desember
Publisher : CV. IRA PUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56862/irajtma.v2i3.67

Abstract

This research aims to calculate the amount of fuel in the multi-fuel boiler unit at PT Toba Pulp Lestari, Tbk. A boiler is a closed steam boiler, and the heat of combustion is transmitted to the water until it becomes hot steaming water or steam. In the work process, it is necessary to calculate the total fired and moisture to determine the efficient level of maturity for each unit. In this research, the author found that the energy needed to evaporate water in fuel up to 0% was Palm Caul 2303.67 kcal/kg, Palm Shell 3833.25 kcal/kg, and Bark 1513.69 kcal/kg. The energy used in the Multi Fuel Boiler requires Palm Caul 186,688.4 kg/hour, Palm sheel 97,683.6 kg/hour, and Bark 181,508.9 kg/hour.
Optimalisasi Pengecekan dan Perbaikan dengan Penentuan Ukuran Utama Penutup Bawah pada Tangki Timbun di PT. KPBN Belawan Silalahi, Krisanto; Tarigan, Nurlianna
IRA Jurnal Teknik Mesin dan Aplikasinya (IRAJTMA) Vol 3 No 1 (2024): April
Publisher : CV. IRA PUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56862/irajtma.v3i1.99

Abstract

PT. KPBN Belawan is a company branch entrusted as an agent for buying and selling CPO (Crude Palm Oil). PT. KPBN Belawan operates a tank storage unit that temporarily stores CPO before selling it to customers. Regular inspections are necessary for the storage tanks, such as checking the thickness of the tank plates and ensuring the strength of the locking mechanisms on the shell central hole to prevent leaks during filling. This research aims to calculate the dimensions of the bottom cover of the storage tank (central hole), which serves as a seal for the CPO in a storage tank with a capacity of 5,000 liters. The calculated dimensions for the shell central hole are as follows: the nominal diameter of the shell maintenance hole bolts is 17.5 mm, the flange width is 40.25 mm, the outer diameter of the flange shell maintenance hole is 913.6 mm, the bolt circle diameter of the flange shell central hole is 887 mm, the inner diameter of the flange shell central hole is 869.5 mm, the number of bolts is 24, the flange thickness is 18 mm, and the bolt spacing of the flange shell mainhole is 115.77 mm.
KEKUATAN LELAH (FATIGUE) PADA PEGAS ULIR TEKAN DI UNIT VIBRATING SCREEN AKIBAT ADANYA BEBAN SIKLIK (BERULANG) YANG DIHASILKAN OLEH GETARAN BANDULDENGAN MENGGUNAKAN UJI FATIK (FATIGUE TEST) Darmadi, Herry; Tarigan, Nurlianna; Sitompul, Roganda; Kurnia, Dian
Jurnal Mekanova : Mekanikal, Inovasi dan Teknologi Vol 10, No 1 (2024): April
Publisher : universitas teuku umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35308/jmkn.v10i1.9360

Abstract

Pegas merupakan sebuah elemen fleksibel yang digunakan untuk menghasilkan gaya atau torsi dan pada saat yang sama menyimpan energi. Pada vibrating screen, pegas ulir tekan digunakan sebagai pendistribusian gaya yang dihasilkan oleh getaran bandul. Getaran bandul pada vibrating screen memberikan beban siklik (berulang) terhadap pegas, yang mengakibatkan pegas mengalami kelelahan pada sifat elastisitasnya secara berkala. Kelelahan yang terjadi pada pegas merupakan faktor penyebab berkurangnya effisiensi berdasarkan kuantitas. Karena pegas dapat mengalami kelelahan maka haruslah diperhitungkan kekuatan lelah (fatigue) pegas yang akan digunakan, guna menghindari terjadinya kerusakan pada pegas. Pada penelitian ini dilakukan pengujian kelelahan pada pegas ulir tekan dengan bahan baja Carbon AISI 1045 dengan kategori baja Carbon menengah menggunakan alat uji mesin rotary bending. Pada pengujian kelelahan menggunakan beban 20 Kg (I), 30 Kg (II), dan 40 Kg (III) besarnya tegangan lentur (σl) pada bahan uji I, II, dan III adalah 101,92 Mpa, 152,88 Mpa, dan 203,84 Mpa. Besarnya tegangan patah (σB) pada bahan uji I, II, dan III adalah 28,30 Kg/mm2, 42,46 Kg/mm2, dan 56,61 Kg/mm2. Waktu yang dibutuhkan pada bahan uji I, II, dan III adalah 78,40 menit, 5,59 menit, dan 1 menit. Siklus yang yang terjadi pada bahan uji I, II, dan III adalah 73829 putaran, 5612 putaran, dan 938 putaran.