MENGOPTIMALKAN CRASHING PROJECT PEMASANGAN SALURAN RUMAH DI PERUMAHAN X DENGAN PENDEKATAN CPM-PERT Khoiroh, Siti Muhimatul
Heuristic Vol 15 No 01 (2018)
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/he.v15i01.1518

Abstract

Critical Path Method (CPM) dan Project Evaluation Review Technic (PERT) adalah metode yang banyak digunakan untuk membuat penjadwalan proyek. Salah satu kelebihan dari gabungan dua metode ini adalah untuk mengevaluasi waktu penyelesian proyek atau keterlambatan karena faktor–faktor yang tidak diperhitungkan sebelumnya. Sehingga alternatif mempercepat pelaksanaan waktu proyek (crashing project) menjadi salah satu alternatif yang dapat diandalkan seorang kontraktor. Untuk mengevaluasi proyek pemasangan saluran rumah berdasarkan analisis CPM diperoleh estimasi waktu penyelesaian selama 180 minggu dengan lintasan kritis proyek meliputi aktivitas A-B-C-E-F. Dari lamanya waktu penyelesaian, upaya percepatan dengan informasi estimasi tiga waktu utama yaitu to (waktu optimis), tp (waktu pesimis), dan tm (waktu yang memungkinkan) dan informasi waktu crashing setiap aktivitas dan besar biaya crashing, maka diperoleh waktu percepatan pemasangan SR menjadi 160 hari dengan mempercepat penyelesaian aktivitas B-C, dan C-E dengan total biaya crashing sebesar Rp. 2.350.000,-Kata kunci: crashing project, CPM-PERT, perumahan, penjadwalan
CONFIRMATORY FACTOR ANALYSIS PADA KESELAMATAN KERJA DI PERUSAHAAN KONSTRUKSI JAWA TIMUR Satoto, Handy Febri; Khoiroh, Siti Muhimatul
Jurnal Teknologi dan Terapan Bisnis Vol 1 No 02 (2018): Oktober
Publisher : AKADEMI KOMUNITAS SEMEN INDONESIA GRESIK

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sektor konstruksi merupakan salah satu sektor dominan dalam strategi pembangunan bangsa. Kegiatan perusahaan konstruksi mempunyai potensi bahaya yang sangat besar seperti terjatuh, kebakaran, hingga kematian. Pada penelitian terdahulu, perilaku keselamatan, manajemen organisasi, kondisi lingkungan kerja fisik dan iklim keselamatan merupakan faktor-faktor yang berpengaruh terhadap kinerja keselamatan kerja. Tujuan penelitian ini adalah menentukan pengaruh/hubungan masing-masing indikator pada variabel kondisi lingkungan kerja fisik, manajemen organisasi, perilaku keselamatan, dan iklim keselamatan. Penelitian ini menggunakan metode Confirmatory Factor Analysis (CFA) pada masing-masing variabel dan indikatornya. Survei dilakukan dengan menggunakan kuisioner skala likert 1-6 kepada 329 pekerja perusahaan konstruksi. Hasil uji confirmatory factor analysis didapatkan bahwa indikator pada masing-masing variabel valid dan reliabel. Hal ini menunjukkan bahwa indikator yang digunakan pada masing-masing variabel dapat mengukur/mewakili konstruk tersebut.
CONFIRMATORY FACTOR ANALYSIS PADA KESELAMATAN KERJA DI PERUSAHAAN KONSTRUKSI JAWA TIMUR Handy Febri Satoto, Siti Muhimatul Khoiroh
Jurnal Teknologi dan Terapan Bisnis Vol 1 No 2 (2018): Vol 1 No 2 (2018): Jurnal Teknologi dan Terapan Bisnis
Publisher : Unit Penelitian dan Pengabdian Masyarakat-Akademi Komunitas Semen Indonesia Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (329.683 KB)

Abstract

Sektor konstruksi merupakan salah satu sektor dominan dalam strategi pembangunan bangsa. Kegiatan perusahaan konstruksi mempunyai potensi bahaya yang sangat besar seperti terjatuh, kebakaran, hingga kematian. Pada penelitian terdahulu, perilaku keselamatan, manajemen organisasi, kondisi lingkungan kerja fisik dan iklim keselamatan merupakan faktorfaktor yang berpengaruh terhadap kinerja keselamatan kerja. Tujuan penelitian ini adalah menentukan pengaruh/hubungan masing-masing indikator pada variabel kondisi lingkungan kerja fisik, manajemen organisasi, perilaku keselamatan, dan iklim keselamatan. Penelitian ini menggunakan metode Confirmatory Factor Analysis (CFA) pada masing-masing variabel dan indikatornya. Survei dilakukan dengan menggunakan kuisioner skala likert 1-6 kepada 329 pekerja perusahaan konstruksi. Hasil uji confirmatory factor analysis didapatkan bahwa indikator pada masing-masing variabel valid dan reliabel. Hal ini menunjukkan bahwa indikator yang digunakan pada masing-masing variabel dapat mengukur/mewakili konstruk tersebut
Pengembangan Algoritma Non Delay Pada Kasus Penjadwalan Non-Permutation Hybrid Flowshop Untuk Minimasi Mean Flowtime Khoiroh, Siti Muhimatul
Jurnal Teknik Industri Vol 19, No 2 (2018): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (838.956 KB) | DOI: 10.22219/JTIUMM.Vol19.No2.148-156

Abstract

Production scheduling is one of the key success factors in the production process. Scheduling approach with Non-Permutation flow shop is a generalization of the traditional scheduling problems Permutation flow shop for the manufacturing industry to allow changing the job on different machines with the flexibility of combinations. This research tries to develop a heuristic approach that is non-delay algorithm by comparing Shortest Processing Time (SPT) and Largest Remaining Time (LRT) in the case of non-permutation flow shop to produce minimum mean flow time ratio. The result of simulation shows that the SPT algorithm gives less mean flow time value compared to LRT algorithm which means that SPT algorithm is better than LRT in case of non-permutation hybrid flow shop.
PKM BUDIDAYA LELE SEBAGAI ALTERNATIF MATA PENCAHARIAN PETANI SAWAH TADAH HUJAN DI DESA JUKONG Widiasih, Wiwin; Khoiroh, Siti Muhimatul
Jurnal Abadimas Adi Buana Vol 3 No 2 (2020): Januari
Publisher : LPPM Universitas PGRI Adi Buana Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36456/abadimas.v3.i2.a2173

Abstract

Kelompok Tani Sawah Tadah Hujan Desa Jukong beranggotakan kurang lebih lima belas orangpetani. Kelompok Tani ini memiliki alamat di Balai Desa Jukong dan dikelola langsung oleh IbuSekretaris Kepala Desa, yaitu Ibu Uswatun. Pada saat musim hujan, petani menanam jagung ataupadi pada sawah yang dimilikinya. Namun pada musim kemarau petani-petani menjadi kulibangunan di Surabaya. Hal tersebut dapat meningkatkan urbanisasi dan dapat menyebabkanmenurunnya perekonomian masyarakat desa Jukong serta dapat meningkatkan pengangguran.Solusi yang ditawarkan adalah membuat/pengadaan kolam untuk budidaya lele dengan diameter3m dan ketinggian 1,2m; pengadaan bibit lele sebanyak 700 ekor; pengadaan 80 kg pakan lelesampai dengan dipanen; pelatihan keterampilan langkah-langkah budidaya lele yang efektif;pelatihan dan pendampingan pengelolaan usaha serta pengelolaan keuangan. Metode yangdigunakan adalah identifikasi permasalahan yang mendesak untuk segera diatasi; metodepartisipatif dalam pelatihan dan pendampingan; monitoring dan evaluasi terhadap hasil PKMdengan indikator budidaya lele dapat meningkatkan pendapatan kelompok tani sawah tadahhujan; keberlanjutan program dengan tim pelaksana sebagai fasilitator dilakukan dalam bentukkonsultasi, diskusi, dan pendampingan strategis.
Crashing Project Evaluation by Managing Allocation Resource and Cost using CPM-PERT and MS,Project in Nurul Hayat Mosque’s Renovation Athira , Nur Rizka; Andris, Dea Ayu Maharani; Khoiroh, Siti Muhimatul
Tibuana Vol 4 No 02 (2021): Tibuana
Publisher : UNIPA PRESS

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36456/tibuana.4.02.3770.69-82

Abstract

The implementation of project management must be calculated based on time and cost estimation. One of the efficiency measures that can take is to accelerate. Time, cost, and quality are factors that must consider while making project acceleration. Project renovation in Nurul Hayat's room was chosen in this research because this project experienced delays in implementation. Delays occur due to a lack of available manpower. This delay will certainly have an impact on costs. The purpose of this research is to speed up time and get optimum costs while still paying attention to quality standards. By CPM-PERT approach, and the evaluation of project acceleration with Ms. Project, the results obtained are scheduling the initial completion of the mosque renovation which initially has an estimated 42 days with a normal total cost of 17,227,500, can be accelerated for 36 working days with additional processing costs of Rp. 70,000 and overtime costs of Rp. 1,635,000. The total cost is Rp 18,932,500 Keyword: Crashing Project, CPM-PERT, Ms. Project
MODIFIED FMEA DALAM MANAJEMEN RISIKO RANTAI PASOK INDUSTRI BUDIDAYA LOBSTER AIR TAWAR Siti Muhimatul Khoiroh
Tekmapro : Journal of Industrial Engineering and Management Vol 17 No 1 (2022): TEKMAPRO
Publisher : UPN Veteran Jawa Timur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33005/tekmapro.v17i1.265

Abstract

Berkembangnya minat masyarakat Indonesia terhadap budidaya LAT (Lobster Air Tawar) merupakan salah satu efek dari peraturan pemerintah No. 56/ Permen-KP/2016. Sejak terjadinya pandemic Covid-19 dengan adanya pembatasan wilayah membuat salah satu industri budidaya LAT jenis Red Claw (Cherax Quadricarinatus) di area Sidoarjo Jawa Timur mengalami permasalahan dalam supply lobster kepada konsumen diberbagi daerah diluar kota di Indonesia. Keterlambatan pasokan lobster mengakibatkan keterlambatan pasokan bahan baku bagi konsumen yang mayoritas merupakan pegiat rumah makan atau restaurant.Keberhasilan manajemen rantai pasok ditentukan oleh besarnya biaya yang dapat diminimalisir, waktu yang singkat, dan kualitas yang terjaga, serta tingkat minimasi risiko(supply chain risk).Berdasarkan permasalahan yang terjadi, maka akan dilakukan identifikasi risiko pada setiap proses untuk melihat pengaruhnya terhadap biaya, waktu, dan kualitas. Kemudian dilanjutkan dengan penentuan bobot berdasarkan tingkat hambatan (severity), kemungkinan resistensi (occurrence), dan penyebab hambatan yang terdeteksi (detection). Langkah terakhir adalah menghitung nilai RPN (Risk Priority Number) yang diperoleh dari hasil keparahan.Dari hasil analisis identifikasi risiko dan perhitungan RPN dengan pendekatan FMEA, diperoleh bobot risiko tertinggi dengan nilai RPN 105 disebabkan oleh faktor risiko naiknya biaya distribusi hasil budidaya akibat dampak Pandemi Covid-19. Dengan demikian, perusahaan harus mempertimbangkan untuk mengatur ulang strategi bisnisnya untuk memfokuskan pada daerah-daerah yang dekat jangkauannya dengan titik lokasi supply lobster air tawar.
Pengembangan Algoritma Non Delay Pada Kasus Penjadwalan Non-Permutation Hybrid Flowshop Untuk Minimasi Mean Flowtime Siti Muhimatul Khoiroh
Jurnal Teknik Industri Vol. 19 No. 2 (2018): Agustus
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol19.No2.148-156

Abstract

Production scheduling is one of the key success factors in the production process. Scheduling approach with Non-Permutation flow shop is a generalization of the traditional scheduling problems Permutation flow shop for the manufacturing industry to allow changing the job on different machines with the flexibility of combinations. This research tries to develop a heuristic approach that is non-delay algorithm by comparing Shortest Processing Time (SPT) and Largest Remaining Time (LRT) in the case of non-permutation flow shop to produce minimum mean flow time ratio. The result of simulation shows that the SPT algorithm gives less mean flow time value compared to LRT algorithm which means that SPT algorithm is better than LRT in case of non-permutation hybrid flow shop.
Analisis Supply Chain Risk Management Industri Budidaya Lobster Air Tawar Dengan Pendekatan FMEA Siti Muhimatul Khoiroh
Operations Excellence: Journal of Applied Industrial Engineering Vol 13, No 3, (2021): OE November 2021
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/oe.2021.v13.i3.030

Abstract

The growing interest of the Indonesian people in the cultivation of LAT (Freshwater Lobster) is one of the effects of government regulation no. 56/ Permen-KP/2016. Since the occurrence of the Covid-19 pandemic with regional restrictions, one of the LAT cultivation industries of the Red Claw (Cherax Quadricarinatus) type in the Sidoarjo area, East Java, has experienced problems in supplying lobster to consumers in various regions outside cities in Indonesia. The delay in the supply of lobster results in delays in the supply of raw materials for consumers, the majority of whom are restaurant or restaurant activists. The success of supply chain management is determined by the number of costs that can be minimized, short time, and quality that is maintained, as well as the level of risk minimization (supply chain risk). Based on the problems that occur, risk identification will be carried out in each process to see its effect on cost, time, and quality. Then proceed with determining the weight based on the level of resistance (severity), possible resistance (occurrence), and the cause of the detected obstacle (detection). The last step is to calculate the RPN (Risk Priority Number) value obtained from the severity results. From the results of the analysis of risk identification and calculation of RPN with the FMEA approach, the highest risk weight with an RPN value of 105 was obtained due to the risk factor for the increase in distribution costs of cultivation products due to the impact of the Covid-19 Pandemic. Thus, the company should consider reorganizing its business strategy to focus on areas that are close to the point of supply of freshwater crayfish. 
Kewirausahaan produk olahan susu dan durian untuk pengembangan ekonomi kreatif desa Wonomerto Jombang Siti Muhimatul Khoiroh; Herlina Herlina; Mohammad Insan Romadhan
Yumary: Jurnal Pengabdian kepada Masyarakat Vol. 1 No. 3 (2021): Maret
Publisher : Penerbit Goodwood

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35912/yumary.v1i3.190

Abstract

Purpose: Wonomerto Village is a durian and milk-producing village; besides, the majority of the people work as rice farmers. Durian and milk are a side business that is used as additional income during the waiting period for harvest. The price is quite low than the price of durian or milk in cities. This is a problem for the government who wants to raise the village's natural products as a potential business to support the tourism program of the City of Jombang. Method: A 4-stage work program was compiled to solve the problems of Wonomerto Village partners, namely socialization, implementation, evaluation and reporting. The implementation of partnerships in the field of entrepreneurship in the form of processing milk production, durian, as well as online packaging and marketing techniques by utilizing a mini studio made from affordable materials to penetrate the online market. Results: The results of this training program are that the community is able to make various processed products with added value, such as milk candy, fresh milk variants, durian pies, and durian milk cakes with attractive packaging to be marketed in various tourist attractions in Jombang. Conclusions: This training has a positive impact in increasing understanding of innovation and technology by 70% as well as interest in innovation for increasing the existence of the creative industry in Wonomerto Village. Keywords: Product innovation, Milk, Durian, Packaging, marketing