Analisis Faktor-Faktor Penyebab Terjadinya Perubahan Desain dan Pengaruhnya terhadap Cost overrun Proyek Konstruksi di Jambi Azanna, Dwitya Okky; Handayani, Elvira; Andreawan, Muhammad Fiqh
Jurnal Talenta Sipil Vol 7, No 2 (2024): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i2.666

Abstract

This research aims to prove empirically the factors that cause design changes and the impact of cost overruns on construction projects. The data collection technique used was primary data collection with a sample of 10 respondents taken from contractor project staff of construction projects in Jambi City. The sampling technique in this research used probability sampling and stratified random sampling methods. Data analysis processing in this study used IBM SPSS 28. The final results of this analysis found that the causative factor of design changes because of owner or contractor. The most dominant design change factors caused by the owner were delays in providing goods that should have been provided by the owner at 48.48%, temporary suspension at 42.85%, and termination of construction contracts at 56.81%. Apart from that, other dominant factors in design changes caused by contractors are delays in providing design drawings for construction that have been approved, amounting to 62.5%, design/specification defects equal in value to the number of addendums issued at the implementation stage, namely 60.60%, final failure of contractor/subcontractor performance was 64.51%.
Monitoring Dan Evaluasi Jaringan Drainase Yang Ramah Lingkungan Di Perumahan Villa Delima Mayang Kota Jambi Mariansyah, Mariansyah; Das, Amsori M; Dony, Wari; Fadlan, Fadlan; Azanna, Dwitya Okky
Jurnal Talenta Sipil Vol 7, No 1 (2024): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v7i1.462

Abstract

The rainy season, which has a fairly high frequency over a long period of time, results in the need for drainage so that the amount of rainwater can be channeled into water bodies and some of it can be used for purposes in daily life. This is so as not to cause inundation and flooding problems. This research aims to analyze the condition of the existing drainage network, calculate runoff discharge, plan infiltration wells for utilizing rainwater in the Villa Delima Mayang housing complex, Jambi City. The method used in this planning uses hydrological analysis calculations including mononobe, pearson III and rational log methods. In planning infiltration wells, it refers to the Indonesian National Standard (SNI) No. 03-2453-2002. The result of the 10 year return period design rainfall is 112.17 mm. the results of the analysis of the carrying capacity show that 9 out of 14 channels are unable to accommodate the 10 year return period design discharge. Next, an absorption well with a diameter of 0.8 meters and a depth of 1.5 meters is planned and placed in a drainage channel that cannot accommodate runoff. The absorption capacity of 1 well is 0.7536 m3.